169 West 228 Street
Manhattan, NY 10463BBL 1-02215-0188Map
Owner of record: Bil West 228th Street LLC
169 West 228 Street is a walk-up apartment building built in 2001 in Manhattan, 10463. It has 9 residential units across 4 floors. The owner of record is Bil West 228th Street LLC. HPD has recorded 72 housing violations here, most recently on July 15, 2026. 20 of the 50 most recent violations are still open.
- HPD violations
- 72
- DOB violations
- 10
- ECB violations
- 0
- HPD complaints
- 87
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 72
- CImmediately hazardous
Remove the illegal fastening consisting of double cylinder key operated lock at building entrance door at public hall, 1st story
Jul 15, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at 1st public hall bulkhead from north, 4th story
Jul 8, 2026
Open — Nov certified on time - BHazardous
Repair the roof so that it will not leak at ceiling at 1st public hall bulkhead from north, 4th story
Jul 8, 2026
Open — Nov certified on time - ANon-hazardous
Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to south wall in the foyer located at apt b, 1st apartment from north at east
May 13, 2026 · Apt B
Open — Civ14 mailed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Apr 19, 2026
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 30 sq ft at ceiling at public hall, 4th story
Mar 11, 2026
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than ten square feet at ceiling at public hall, 4th story
Feb 3, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective wall mounted electrical light fixture at building front entrance door , 1st story
Feb 3, 2026
Closed — Violation closed - CImmediately hazardous
Make safe by properly repairing the structural defect defective brick face and morter joints at north exterior wall from 4th story to 1st story.
Feb 3, 2026
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east located at apt 4b, 4th story, 1st apartment from west at north
Jan 6, 2026 · Apt 4B
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less the 10 sq ft of mold at ceiling in the 1st room from east located at apt 4b, 4th story, 1st apartment from west at north
Jan 6, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the 1st room from east located at apt 4b, 4th story, 1st apartment from west at north original violation 18428640 issued 24-nov-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Nov 24, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Refit apartment door in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Nov 24, 2025 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Nov 24, 2025 · Apt 4B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the 1st room from east located at apt 4b, 4th story, 1st apartment from west at north
Nov 24, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east located at apt 4b, 4th story, 1st apartment from west at north
Nov 24, 2025 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east located at apt 4b, 4th story, 1st apartment from west at north
Nov 24, 2025 · Apt 4B
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout yard
Sep 23, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Sep 23, 2025
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective spring balance lower window sash second window from east at north in the 2nd room from east located at apt 4b, 40th story, 1st apartment from west at north
Jun 4, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance lower window sash frist window from west at north in the 2nd room from east located at apt 4b, 40th story, 1st apartment from west at north
Jun 4, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of baseboards heating system on in the entire apartment located at apt 4b, 40th story, 1st apartment from west at north
Jun 4, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Refit the building entrance door , 1st story
May 3, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective frame at building front entrance door , 1st story
May 3, 2025
Closed — Violation closed - BHazardous
Refit the door at building front entrance , 1st story
May 3, 2025
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving at building front entrance , 1st story
May 3, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Nov 28, 2021
Closed — Violation dismissed - ANon-hazardous
Refit vestibule door at public hall, 1st story
Nov 28, 2021
Open — Nov sent out - ANon-hazardous
Refit building entrance door at public hall, 1st story
Nov 28, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 28, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Nov 28, 2021
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Nov 28, 2021 · Apt 3B
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 28, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 28, 2021
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 28, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 28, 2021
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Nov 28, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2018
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets washbasin, in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
May 13, 2015 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls, in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
May 13, 2015 · Apt 3B
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective wood doors & shelves of sink cabinet, in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
May 13, 2015 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
May 13, 2015 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 3b, 3rd story, 2nd apartment from south at west
May 13, 2015 · Apt 3B
Closed — Violation dismissed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Aug 29, 2026 · Apt B
Close - Unsanitary condition
Mold
Jul 16, 2026 · Apt 4B
Close - Unsanitary condition
Sewage
Jul 16, 2026 · Apt 4B
Close - General
Cabinet
Jul 16, 2026 · Apt 4B
Close - General
Bell/buzzer/intercom
Jul 6, 2026 · Apt 4B
Close - Unsanitary condition
Sewage
Jul 6, 2026 · Apt 4B
Close - Unsanitary condition
Mold
Jul 6, 2026 · Apt 4B
Close - Unsanitary condition
Pests
May 2, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Apr 30, 2026 · Apt B
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Feb 10, 2026 · Apt 4B
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Jan 31, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Jan 31, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 4B
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 4B
Close - Unsanitary condition
Mold
Dec 16, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Dec 13, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 4B
Close - Water leak
Heavy flow
Dec 9, 2025 · Apt 4B
Close - Plumbing
Water supply
Dec 9, 2025 · Apt 4B
Close - General
Janitor/super
Dec 1, 2025 · Apt 2A
Close - Unsanitary condition
Pests
Nov 25, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Nov 22, 2025 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Nov 22, 2025 · Apt BLDG
Close - Door/window
Window frame
Nov 20, 2025 · Apt 4B
Close - Paint/plaster
Wall
Nov 20, 2025 · Apt 4B
Close - Water leak
Damp spot
Nov 20, 2025 · Apt 4B
Close - Paint/plaster
Ceiling
Oct 23, 2025 · Apt 2
Close - Paint/plaster
Wall
Oct 23, 2025 · Apt 2
Close - Unsanitary condition
Mold
Oct 23, 2025 · Apt 2
Close - Plumbing
Toilet
Sep 26, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Jun 4, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Jun 2, 2025 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Mar 3, 2025 · Apt BLDG
Close - Door/window
Door
Feb 27, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Jan 7, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 7, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Jan 7, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Jan 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 26, 2021 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 16, 2017 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 26, 2016 · Apt 4B
Close - General
Mailbox
Apr 21, 2015 · Apt 3B
Close - Plumbing
Basin/sink
Apr 21, 2015 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2001
- Floors
- 4
- Residential units
- 9
- Building area
- 6,470 ft²
- Lot area
- 3,175 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 10
- Block / lot
- 2215 / 188
- Assessed value
- $445,950
- Landmark / historic district
- No
HPD registration #142684, last renewed Nov 24, 2025.
Questions about 169 West 228 Street
Who owns 169 West 228 Street?
The owner of record in NYC Department of City Planning PLUTO data is Bil West 228th Street LLC.
Does 169 West 228 Street have violations?
Yes. NYC HPD has recorded 72 housing violations at this property.
Is 169 West 228 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 169 West 228 Street built?
City records list 2001 as the year it was built.
How many apartments are in 169 West 228 Street?
It has 9 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.