206 Wadsworth Avenue
Manhattan, NY 10033BBL 1-02164-0052Map
Owner of record: Caerus Wadsworth 184 LLC
206 Wadsworth Avenue is a vacant lot in Manhattan, 10033. The owner of record is Caerus Wadsworth 184 LLC. HPD has recorded 8 housing violations here, most recently on June 25, 2010.
- HPD violations
- 8
- DOB violations
- 13
- ECB violations
- 13
- HPD complaints
- 40
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- BHazardous
Properly repair the broken or defective wood/frame, of door, in the entrance located at apt 1c, 1st story, 3rd apartment from north at east
Jun 25, 2010 · Apt 1C
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets sink, in the kitchen located at apt 1c, 1st story, 3rd apartment from north at east
Jun 25, 2010 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair the broken or defective sagging wood floor, in the foyer located at apt 1c, 1st story, 3rd apartment from north at east
Jun 25, 2010 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood floor, in the kitchen located at apt 1c, 1st story, 3rd apartment from north at east
Jun 25, 2010 · Apt 1C
Closed — Violation closed - BHazardous
Repair the broken or defective connection water/supply line, of sink, in the kitchen located at apt 1c, 1st story, 3rd apartment from north at east
Jun 25, 2010 · Apt 1C
Closed — Violation closed - BHazardous
Repair the broken or defective connection water supply/line, of water/closet, in the bathroom located at apt 1c, 1st story, 3rd apartment from north at east
Jun 25, 2010 · Apt 1C
Closed — Violation closed - ANon-hazardous
Refit windows,( 6 no.) in the entire apartment located at apt 1c, 1st story, 3rd apartment from north at east
Jun 25, 2010 · Apt 1C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the foyer located at apt 1c, 1st story, 3rd apartment from north at east
Jun 25, 2010 · Apt 1C
Closed — Violation closed
DOB building violations · 13
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active
ECB violations · 13
- Class - 2
Proposed 9 story nb closed site. jobsite fence not properly maintained at exp#1,4. plywood fence in place all exposures active permit#123022736-01-eq-fn. observed missing viewing panels bc3307.7.3, large advert
Mar 18, 2026 · Penalty $5,000
Active - Class - 2
Failure to comply with bc-3307.7.3 specifically concerning the installation construction fence. installed construction solid fence on new construction without necessary viewing panels for the entire fence. fur
Dec 5, 2025 · Penalty $10,000
Active - Class - 2
Construction fence not maintained as per bc 3307.7, i observed the construction fence missing view panels at exposure 1 and 4. additionally, at exposure 3, the 8ft tall fence panels were leaning creating an un
Aug 23, 2025 · Penalty $10,000
Active - Class - 2
3307.7.3 viewing panels-observed construction fence installed at exterior of jobsite @ exposures 1 & 4. no viewing panels are installed every 25ft as per code requirements.install viewing panels on construction
Mar 20, 2025 · Penalty $10,000
Active - Class - 2
Observed construction fence installed around perimeter of jobsite. at exposures 1 & 4 there are no viewing panels installed every 25 ft as per bc 3307.7.3. violation issued 6-3-2024 by badge #3332 on 6-3-2024 f
Aug 30, 2024 · Penalty $2,500
Active - Class - 2
Observed construction fence installed around perimeter of jobsite at exposures 1&2 without viewing panels installed. as per 3307.7.3 viewing panels are to be installed every 25 ft on construction fence.provide/
Jun 3, 2024 · Penalty $5,000
Active - Class - 2
At time of inspection of proposed 9 story new building observed construction fence in place not maintained per code 1.panels have holes 2. protruding screws 3. panels leaning causing hazardous conditions.mainta
Jan 24, 2024 · Penalty $2,530
Resolve - Class - 2
Observed exp3 pathway of adj property and retaining wall with missing wood panels of construction fence creating hazard of unauthorize access and fall hazard of more than 6 feet from lead edge,code stipulates c
Dec 18, 2023 · Penalty $1,000
Resolve - Class - 2
At time of inspection on proposed 9 story nb, i observed a construction fence installed at exposure 1 and 4 with viewing panels not blocked with plexiglass or equivalent material as required by bc 3307.7.3.
Jun 6, 2023 · Penalty $1,030
Resolve - Class - 2
At time of inspection of 9 stories new building at foundation/excavation stage, i observed construction fence installed around perimeter. construction fence not maintained, missing two panels and plexiglass at
Jan 3, 2023 · Penalty $2,500
Resolve
Show 3 more ↓
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35333400m issued on 07-24-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed exit passageway. remedy: comply
Sep 5, 2018 · Penalty $625
Resolve - Class - 1
Unapproved,unsafe,unsuitable,electrical equipment,apparatus,materials,devices,appliances or wiring in use.the entire bsmt service entrance conductor end line box (rutting) defective open defective wiring are in
Aug 25, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to ground electrical systems bsmt service ground conductor:no water main ground conductor."please note" the water main ground conductor is not attach @the water pipe!!.rem:provide grounding.
Aug 25, 2017 · Penalty $4,800
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 22, 2026 · Apt 30
Close - Heat/hot water
Apartment only
Jan 2, 2022 · Apt 30
Close - Heat/hot water
Apartment only
Jan 1, 2022 · Apt 30
Close - Plumbing
Basin/sink
Jan 16, 2021 · Apt 4
Close - Unsanitary condition
Garbage/recycling storage
Jul 13, 2020 · Apt 30
Close - Heat/hot water
Apartment only
May 9, 2020 · Apt 30
Close - Heat/hot water
Entire building
Oct 22, 2019 · Apt 24
Close - Heating
Heat related
Jan 25, 2014 · Apt 1
Close - Heating
Heat related
Oct 16, 2011 · Apt 6D
Close - Heating
Heat related
Oct 16, 2011 · Apt 6D
Close
Show 30 more ↓
- Heating
Heat related
Nov 9, 2010 · Apt 403
Close - General
Floor
Jun 18, 2010 · Apt 1C
Close - General
Floor
Jun 18, 2010 · Apt 1C
Close - Plumbing
Basin/sink
Jun 18, 2010 · Apt 1C
Close - General
Doors
Jun 18, 2010 · Apt 1C
Close - Paint/plaster
Door/frame
Jun 15, 2010 · Apt 1C
Close - Paint/plaster
Ceiling
Jun 15, 2010 · Apt 1C
Close - Plumbing
Water-leaks
Jun 15, 2010 · Apt 1C
Close - Paint/plaster
Wall
Jun 15, 2010 · Apt 1C
Close - General
Floor
Jun 15, 2010 · Apt 1C
Close - Plumbing
Bathtub/shower
Mar 10, 2008 · Apt 31
Close - General
Doors
Mar 10, 2008 · Apt 31
Close - General
Doors
Mar 10, 2008 · Apt 31
Close - Paint/plaster
Wall
Mar 10, 2008 · Apt 31
Close - General
Windows
Mar 10, 2008 · Apt 31
Close - General
Windows
Mar 10, 2008 · Apt 31
Close - Nonconst
Vermin
Mar 10, 2008 · Apt 31
Close - General
Floor
Mar 10, 2008 · Apt 31
Close - Electric
Wiring
Mar 10, 2008 · Apt 31
Close - General
Floor
Mar 10, 2008 · Apt 31
Close - Paint/plaster
Wall
Mar 10, 2008 · Apt 31
Close - Plumbing
Basin/sink
Mar 10, 2008 · Apt 31
Close - Plumbing
Bathtub/shower
Mar 10, 2008 · Apt 31
Close - Plumbing
Basin/sink
Mar 10, 2008 · Apt 31
Close - Plumbing
Toilet
Mar 10, 2008 · Apt 31
Close - Paint/plaster
Wall
Mar 10, 2008 · Apt 31
Close - Electric
Lighting
Mar 10, 2008 · Apt 31
Close - General
Ceramic-tile
Mar 10, 2008 · Apt 31
Close - General
Mold
Mar 10, 2008 · Apt 31
Close - Heating
Heat related
Jan 21, 2008 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Vacant lot (V1)
- Year built
- —
- Floors
- —
- Residential units
- —
- Building area
- —
- Lot area
- 14,988 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2164 / 52
- Assessed value
- $1,629,450
- Landmark / historic district
- No
Questions about 206 Wadsworth Avenue
Who owns 206 Wadsworth Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Caerus Wadsworth 184 LLC.
Does 206 Wadsworth Avenue have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 206 Wadsworth Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.