roofy

1941 Amsterdam Avenue

Manhattan, NY 10032BBL 1-02107-0059Map

Owner of record: Abm Owner LLC

1941 Amsterdam Avenue is an elevator apartment building built in 1966 in Manhattan, 10032. It has 170 residential units across 22 floors. The owner of record is Abm Owner LLC. HPD has recorded 75 housing violations here, most recently on September 5, 2026. 10 of the 50 most recent violations are still open.

HPD violations
75
DOB violations
32
ECB violations
16
HPD complaints
99

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 75

  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sqft observed at ceiling in the bathroom located at apt 7e, 7th story, 2nd apartment from south at west

    Sep 5, 2026 · Apt 7E

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 7e, 7th story, 2nd apartment from south at west

    Sep 5, 2026 · Apt 7E

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 7e, 7th story, 2nd apartment from south at west

    Sep 5, 2026 · Apt 7E

    Open — Civ14 mailed
  • C

    Provide ready access to buildings heating system door locked at 1st story public hall at boiler room, 1st story

    Sep 5, 2026

    Open — Nov certified on time
  • C

    Provide ready access to buildings heating system door locked at basement at boiler room

    Jul 25, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 8b, 8th story, 4th apartment from south at west

    Jul 25, 2026 · Apt 8B

    Open — Invalid certification
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Jun 4, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 7e, 7th story, 2nd apartment from south at west

    Jun 4, 2026 · Apt 7E

    Open — Invalid certification
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 18j, 18th story, 1st apartment from north at east

    Apr 1, 2026 · Apt 18J

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 7e, 7th story, 2nd apartment from south at west

    Apr 1, 2026 · Apt 7E

    Closed — Violation closed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective the door at compactor chute on west wall at public hall, 10th story

    Mar 14, 2026

    Open — Not complied with
  • B

    Refit door in the entrance located at apt 7e, 7th story, 2nd apartment from south at west

    Mar 9, 2026 · Apt 7E

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 7e, 7th story, 2nd apartment from south at west

    Mar 9, 2026 · Apt 7E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt 8b, 8th story, 4th apartment from north at east

    Feb 26, 2026 · Apt 8B

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective radiator shut-off valve in the 1st room from north located at apt 15f, 15th story, 3rd apartment from south at west

    Feb 26, 2026 · Apt 15F

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 15f, 15th story, 3rd apartment from south at west

    Feb 26, 2026 · Apt 15F

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 15f, 15th story, 3rd apartment from south at west

    Feb 26, 2026 · Apt 15F

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 15f, 15th story, 3rd apartment from south at west

    Feb 26, 2026 · Apt 15F

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective silicone caulking around bathtub at north wall in the bathroom located at apt 8b, 8th story, 4th apartment from north at east

    Feb 26, 2026 · Apt 8B

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 7e, 7th story, 2nd apartment from south at west

    Feb 26, 2026 · Apt 7E

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 7e, 7th story, 2nd apartment from south at west

    Feb 26, 2026 · Apt 7E

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective cracked 1st upper sash window from south at west wall in the 1st room from east located at apt 7e, 7th story, 2nd apartment from south at west

    Feb 26, 2026 · Apt 7E

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door at cellar locked at boiler room

    Feb 26, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge at hopper door at west wall at public hall, 12th story

    Feb 26, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch at hopper door at west wall at public hall, 12th story

    Feb 26, 2026

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective latch at hopper door at west wall at public hall, 12th story

    Feb 26, 2026

    Closed — Violation closed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ... in the entrance located at apt 7e, 7th story, 2nd apartment from south at west

    Feb 26, 2026 · Apt 7E

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt 12k, 12th story, 2nd apartment from north at east

    Dec 2, 2025 · Apt 12K

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 22nd story

    Aug 23, 2025

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 18g, 18th story, 2nd apartment from south at west

    Aug 23, 2025 · Apt 18G

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 18g, 18th story, 2nd apartment from south at west

    Aug 23, 2025 · Apt 18G

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective door at hopper chute door at public hall, 2nd story

    Apr 17, 2025

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective fire reatardant material at ceiling at public hall, 1st story

    Apr 17, 2025

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Apr 17, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story

    Apr 17, 2025

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2024

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 8h, 8th story, 1st apartment from west at north

    Aug 6, 2024 · Apt 8H

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story

    Aug 6, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at fire door staircase b at public hall, 6th story

    Jul 25, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at fire door staircase a at public hall, 6th story

    Jul 25, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set, at first door from nort at east leading to public stairs a at public hall, 19th story

    Dec 13, 2023

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Dec 13, 2023

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    Dec 13, 2023

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 22k, 22nd story, 2nd apartment from north at east

    Nov 29, 2023 · Apt 22K

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 22, 23rd story, 2nd apartment from north at east

    Nov 29, 2023 · Apt 22

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective electrical outlet at north wall in the 1st room from north located at apt 8b, 8th story, 4th apartment from north at east

    Nov 29, 2023 · Apt 8B

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Nov 29, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 22k, 22nd story, 2nd apartment from north at east

    Nov 29, 2023 · Apt 22K

    Closed — Violation closed
  • C

    Provide adequate supply of cold water for the fixtures in the entire apartment located at apt 22k, 22nd story, 2nd apartment from north at east

    Sep 27, 2023 · Apt 22K

    Closed — Violation closed

DOB building violations · 32

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Hazardous condition (facade) facade required

    Nycha cycle 9b unsafe report filed

    Jun 19, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2017

    Mar 27, 2018

    Dob violation - dismissed
Show 22 more ↓
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 8, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Jan 18, 2013

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - dismissed
  • Public assembly none

    Pa-public assembly none

    May 3, 1989

    Dob violation - dismissed

ECB violations · 16

  • Class - 2

    Class 2 items: elevator found to vibrate during long runs; investigate and correct. provide updated maintenance log book (asme a17.1-2013 8.6.1.4). provide updated category 1 inspection tag (asme a17.1-2013 8.6

    Oct 14, 2026 · Penalty $625

    Active
  • Class - 2

    1) the video/text message is not working (bc 2022 chap 30) 2) the elevator door at the 8th floor is not closing properly (dlm requirements)

    Apr 14, 2026 · Penalty $3,125

    Active
  • Class - 1

    Cease use item: provide to align and secure counterweight slugs in counterweight frame. class 2 items: category 1 test tag missing. brake maintenance tag expired. provide to correct car shaking when ascending a

    Feb 11, 2026 · Penalty $6,250

    Active
  • Class - 2

    Class 2: upon inspection found device to be out of service. this is creating a hazzardous condition for residents. restore to service repair immediately as per 1rcny 11-02. when service restored contact nycdob

    Jul 8, 2024 · Penalty $625

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #907074. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    At time of inspection i observed sidewalk shed. was missing parapet sign, according to 3301.9.2 it must contained the address of the site the name of the owner. of the site for more information visit www.nyc.go

    Aug 26, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to adequately protect the public. at time of inspection,in response to complaint#1530542,observed "facade-current status-unsafe and no adequate protection for public,at exposure#1. the sidewalk shed in

    Dec 12, 2019 · Penalty $10,000

    Resolve
  • Class - 2

    Failed to obtain permit prior to installation of sidewalk shed.noted: at time of inspection sidewalk shed at exp#1 installed w/o permit. rmdy: obtain permit.

    Oct 1, 2015

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.

    Mar 15, 2011

    Resolve
  • Class - 2

    Fail to file an acceptable 6th round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.36007706h

    Jun 4, 2010

    Resolve
Show 6 more ↓
  • Class - 2

    79m7/34e10/03e10/ 79-dappening buller(wisper flex guide)left side missing 34 & 03 rubby at 11th floor and 2nd floor.

    Oct 9, 2009

    Resolve
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 23, 2009

    Resolve
  • Class - 1

    Failure to prvide unobstructed exit passageway defects noted exit passageway defects noted exit passageway from fire escape west side of premises exposure 2 obstructed by wooden shoring bracing remedy:

    Oct 20, 2008

    Resolve
  • Non-hazardous

    Failure to maintain exterior bldg wall. defect is:at rear facade an approx. 15' x 6' section of bricks are buldging & cracking, section is located @ the 9th flr level. remedy: erect sidewalk shed.

    Jun 15, 2006

    Resolve
  • Hazardous

    Operation of pa without a current permit. remedy: obtain a current permit. failure to have approved pa plans available for inspection.

    Jan 11, 1990

    Resolve
  • Hazardous

    Operation of pa without a current permit remedy obtain a permit. failure to provide approved pa plans for inspection remedy provide approved pa plans

    Dec 19, 1988 · Penalty $375

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 22, 2026 · Apt 7E

    Open
  • Heat/hot water

    Apartment only

    Oct 16, 2026 · Apt 10D

    Close
  • Heat/hot water

    Apartment only

    Sep 3, 2026 · Apt 7E

    Close
  • Water leak

    Heavy flow

    Aug 31, 2026 · Apt 7E

    Open
  • Unsanitary condition

    Mold

    Aug 31, 2026 · Apt 7E

    Open
  • Door/window

    Door frame

    Aug 31, 2026 · Apt 7E

    Open
  • Heat/hot water

    Apartment only

    Aug 31, 2026 · Apt 7E

    Open
  • Heat/hot water

    Apartment only

    Jul 24, 2026 · Apt 8B

    Close
  • Plumbing

    Water supply

    Jun 2, 2026 · Apt 7E

    Close
  • Plumbing

    Water supply

    Jun 2, 2026 · Apt 7E

    Close
Show 40 more ↓
  • Electric

    Wiring

    Jun 2, 2026 · Apt 7E

    Close
  • Door/window

    Door

    Jun 2, 2026 · Apt 7E

    Close
  • Plumbing

    Water supply

    May 4, 2026 · Apt 7E

    Close
  • Electric

    Power outage

    May 4, 2026 · Apt 7E

    Close
  • Heat/hot water

    Apartment only

    Apr 14, 2026 · Apt 7E

    Close
  • Heat/hot water

    Apartment only

    Apr 11, 2026 · Apt 7E

    Close
  • Plumbing

    Water supply

    Apr 4, 2026 · Apt 7E

    Close
  • Heat/hot water

    Apartment only

    Mar 30, 2026 · Apt 7E

    Close
  • Plumbing

    Water supply

    Mar 22, 2026 · Apt 7A

    Close
  • Paint/plaster

    Wall

    Mar 20, 2026 · Apt 8B

    Close
  • Paint/plaster

    Wall

    Mar 20, 2026 · Apt 8B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 8, 2026 · Apt 7E

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 8, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Feb 25, 2026 · Apt 7E

    Close
  • Door/window

    Door

    Feb 25, 2026 · Apt 7E

    Close
  • Heat/hot water

    Apartment only

    Feb 25, 2026 · Apt 7E

    Close
  • Plumbing

    Bathtub/shower

    Jan 12, 2026 · Apt 8B

    Close
  • Plumbing

    Bathtub/shower

    Jan 8, 2026 · Apt 12K

    Close
  • Plumbing

    Radiator

    Dec 31, 2025 · Apt 15F

    Close
  • Plumbing

    Basin/sink

    Dec 31, 2025 · Apt 15F

    Close
  • Water leak

    Damp spot

    Dec 31, 2025 · Apt 15F

    Close
  • Plumbing

    Bathtub/shower

    Dec 31, 2025 · Apt 15F

    Close
  • Appliance

    Refrigerator

    Dec 31, 2025 · Apt 15F

    Close
  • Heat/hot water

    Apartment only

    Nov 30, 2025 · Apt 18G

    Close
  • Plumbing

    Bathtub/shower

    Oct 20, 2025 · Apt 12K

    Close
  • Plumbing

    Bathtub/shower

    Oct 16, 2025 · Apt 12K

    Close
  • Electric

    Outlet/switch

    Jul 11, 2025 · Apt 22J

    Close
  • Unsanitary condition

    Pests

    Jul 11, 2025 · Apt 22J

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 11, 2025 · Apt 22J

    Close
  • Safety

    Smoke detector

    Jun 15, 2025 · Apt 18G

    Close
  • Door/window

    Door

    Apr 15, 2025 · Apt 14F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 3, 2025 · Apt INCINE

    Close
  • Heat/hot water

    Entire building

    Dec 22, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Dec 19, 2024 · Apt 8B

    Close
  • Paint/plaster

    Wall

    Dec 19, 2024 · Apt 8B

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2024 · Apt BLDG

    Close
  • General

    Ventilation system

    Jul 19, 2024 · Apt 6C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D3)
Year built
1966
Floors
22
Residential units
170
Building area
150,236 ft²
Lot area
88,666 ft²
Zoning
R7-2
Community board
112
Council district
10
Block / lot
2107 / 59
Assessed value
$5,761,350
Landmark / historic district
No

HPD registration #144952, last renewed Dec 11, 2025.

Questions about 1941 Amsterdam Avenue

Who owns 1941 Amsterdam Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Abm Owner LLC.

Does 1941 Amsterdam Avenue have violations?

Yes. NYC HPD has recorded 75 housing violations at this property.

Is 1941 Amsterdam Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1941 Amsterdam Avenue built?

City records list 1966 as the year it was built.

How many apartments are in 1941 Amsterdam Avenue?

It has 170 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.