557 West 150 Street
Manhattan, NY 10031BBL 1-02082-0007Map
Owner of record: 557-63 West 150 St Hd
557 West 150 Street is a walk-up apartment building built in 1930 in Manhattan, 10031. It has 30 residential units across 6 floors. The owner of record is 557-63 West 150 St Hd. HPD has recorded 551 housing violations here, most recently on October 15, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 551
- DOB violations
- 3
- ECB violations
- 9
- HPD complaints
- 758
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 551
- BHazardous
Properly repair or replace the broken or defective bell, buzzer and return intercom system from building front entrance to in the entire apartment located at apt 51, 4th story, 2nd apartment from west at north
Oct 15, 2026 · Apt 51
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west and north wall at public hall, 1st story
Oct 15, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west and north wall at public hall, 1st story
Oct 15, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective bell buzzer to apartment at front areaway, 5th story
Oct 15, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 33, 3rd story, 1st apartment from south at west
Oct 8, 2026 · Apt 33
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 33, 3rd story, 1st apartment from south at west
Oct 8, 2026 · Apt 33
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 33, 3rd story, 1st apartment from south at west
Oct 8, 2026 · Apt 33
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 33, 3rd story, 1st apartment from south at west
Oct 8, 2026 · Apt 33
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 33, 3rd story, 1st apartment from south at west
Oct 8, 2026 · Apt 33
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 33, 3rd story, 1st apartment from south at west
Oct 8, 2026 · Apt 33
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 33, 3rd story, 1st apartment from south at west
Oct 8, 2026 · Apt 33
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall, and at ceiling in the bathroom located at apt 33, 3rd story, 1st apartment from south at west
Oct 8, 2026 · Apt 33
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock at building entrance door at public hall, 1st story
Oct 6, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass at vestibule entrance door at lobby, 1st story
Oct 6, 2026 · Apt 51
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at the vestibule door at public hall, 1st story
Sep 25, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of inoperable gate at the fire escape window in the 5th room from north at east located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 5th room from north at east located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north at west located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 5th room from north at west located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden cabinet doors at the sink in the kitchen located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wooden cabinet base in the kitchen located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq. ft. at the ceiling in the bathroom located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall and the ceiling in the bathroom located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and north wall in the bathroom located at apt 34, 3rd story, 2nd apartment from east at south
Sep 25, 2026 · Apt 34
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective brick motar at from the basement to the 1st story at the exterior east wall at the east yard
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2, 1st story, 1st apartment from west at north
Sep 2, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2, 1st story, 1st apartment from west at north
Sep 2, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at the fire exit door at public hall, 1st story
Sep 2, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rubish at the rear yard
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete landing at the east yard
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the ceiling in the bathroom located at apt 2, 1st story, 1st apartment from west at north
Sep 2, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective springs balances at 1st window lower sash at east wall in the 2nd room from east located at apt 2, 1st story, 1st apartment from north at east
Aug 31, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Aug 31, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Aug 31, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective base cabinet in the kitchen located at apt 2, 1st story, 1st apartment from north at east
Aug 31, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the bathroom located at apt 2, 1st story, 1st apartment from north at east
Aug 31, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 1st story, 1st apartment from north at east
Aug 31, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 1st story, 1st apartment from east at south
Jul 22, 2026 · Apt 5
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jul 22, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 2nd story, 1st apartment from east at south
Jul 17, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jul 17, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective upper and lower window sash balance at east wall in the kitchen located at apt 4b, 2nd story, 1st apartment from east at south
Jul 17, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 2nd story, 1st apartment from east at south
Jul 15, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jul 15, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jul 13, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 1st story, 1st apartment from east at south
Jul 13, 2026 · Apt 5
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Jul 8, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom in the entrance located at apt 55, 5th story, 1st apartment from east at south
Jul 6, 2026 · Apt 55
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jul 6, 2026
Open — Nov sent out
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations · 9
- Class - 1
Failure to submit certificate of correction of violation #39091225k issued on 07-27-2023 for failure to maintain building in code complaint-manner., repair and/replace
Apr 29, 2026 · Penalty $25,000
Active - Class - 2
Found federal boiler mod fst-100 ser#6987 btus 4200mbh, yr 1992. spill switch not insealled proper. sail switch defected,chimney not sealed, open oil containers in boiler room. signage needed for oil tank.
Mar 9, 2026 · Penalty $6,250
Active - Class - 1
At time of inspection observed side courtyard stairwell landing sidewall/enclosure missing, open and exposed internal framing/support which missing wall size approximately 8'-0" x 8'-0". also observed brick mis
Jul 27, 2023 · Penalty $6,250
Active - Class - 1
Failure to comply with the commissioner's order contained in summons/ violation #35323060m issued on 06/04/18 and to file a certificate of correciton pursuant to 28.201.1 and 1rcny 102-01. for work w/o a permi
Jan 31, 2019 · Penalty $12,500
Active - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35323050m issued on 6/4/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commission
Dec 11, 2018 · Penalty $2,530
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35323050m issued on 06/04/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file
Oct 23, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35323050m issued 06/04/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. work without permit. rem:
Sep 6, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35323050m issued on 06/04/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for:work w/out permit.re
Jul 26, 2018 · Penalty $12,500
Resolve - Class - 1
Work w/o a permit. at the time of inspection,i observed structural repair taking place at premises east yard w/o a permit. work observed consist of reinforcement of concrete & replacement & repair of rebars &
Jun 4, 2018 · Penalty $1,600
Active
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt 52
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Apartment only
Oct 23, 2026 · Apt 32
Open - Heat/hot water
Apartment only
Oct 22, 2026 · Apt 32
Open - Paint/plaster
Ceiling
Oct 22, 2026 · Apt 23
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Heat/hot water
Apartment only
Oct 22, 2026 · Apt 51
Open - Water leak
Damp spot
Oct 22, 2026 · Apt 32
Open
Show 40 more ↓
- Door/window
Window frame
Oct 22, 2026 · Apt 32
Open - Door/window
Window frame
Oct 22, 2026 · Apt 32
Open - Water leak
Heavy flow
Oct 22, 2026 · Apt 23
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt 32
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt 25
Close - Heat/hot water
Entire building
Oct 21, 2026 · Apt 25
Close - Heat/hot water
Entire building
Oct 21, 2026 · Apt 3
Open - Water leak
Heavy flow
Oct 20, 2026 · Apt 33
Open - Door/window
Door
Oct 7, 2026 · Apt 51
Open - Door/window
Door
Oct 7, 2026 · Apt 51
Open - Door/window
Door
Oct 7, 2026 · Apt 51
Close - Door/window
Door
Oct 7, 2026 · Apt 51
Close - General
Bell/buzzer/intercom
Oct 7, 2026 · Apt 51
Close - General
Cooking gas
Oct 5, 2026 · Apt 33
Close - Paint/plaster
Ceiling
Oct 5, 2026 · Apt 33
Close - Flooring/stairs
Floor
Oct 5, 2026 · Apt 33
Close - Water leak
Heavy flow
Oct 5, 2026 · Apt 33
Close - Water leak
Heavy flow
Sep 30, 2026 · Apt 33
Close - Door/window
Door
Sep 30, 2026 · Apt 51
Close - Door/window
Window pane
Sep 30, 2026 · Apt 51
Close - General
Bell/buzzer/intercom
Sep 30, 2026 · Apt 51
Close - Plumbing
Water supply
Jul 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 25, 2026 · Apt 5
Close - Heat/hot water
Entire building
Jul 24, 2026 · Apt 32
Close - Heat/hot water
Entire building
Jul 22, 2026 · Apt 52
Close - Heat/hot water
Entire building
Jul 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 22, 2026 · Apt 32
Close - Heat/hot water
Entire building
Jul 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 20, 2026 · Apt 32
Close - Heat/hot water
Apartment only
Jul 17, 2026 · Apt 32
Close - Plumbing
Water supply
Jul 17, 2026 · Apt 32
Close - Heat/hot water
Entire building
Jul 16, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Jul 16, 2026 · Apt 32
Close - Plumbing
Water supply
Jul 15, 2026 · Apt 32
Close - Heat/hot water
Entire building
Jul 14, 2026 · Apt TWOBUI
Close - Heat/hot water
Entire building
Jul 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 14, 2026 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1930
- Floors
- 6
- Residential units
- 30
- Building area
- 20,787 ft²
- Lot area
- 4,996 ft²
- Zoning
- R6A
- Community board
- 109
- Council district
- 7
- Block / lot
- 2082 / 7
- Assessed value
- $582,300
- Landmark / historic district
- No
HPD registration #109049, last renewed Nov 13, 2025.
Questions about 557 West 150 Street
Who owns 557 West 150 Street?
The owner of record in NYC Department of City Planning PLUTO data is 557-63 West 150 St Hd.
Does 557 West 150 Street have violations?
Yes. NYC HPD has recorded 551 housing violations at this property.
Is 557 West 150 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 557 West 150 Street built?
City records list 1930 as the year it was built.
How many apartments are in 557 West 150 Street?
It has 30 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.