roofy

771 St Nicholas Avenue

Manhattan, NY 10031BBL 1-02063-0035Map

Owner of record: 771 St. Nicholas Avenue LLC

771 St Nicholas Avenue is a walk-up apartment building built in 1895 in Manhattan, 10031. It has 4 residential units across 4 floors. The owner of record is 771 St. Nicholas Avenue LLC. HPD has recorded 118 housing violations here, most recently on April 29, 2026. 36 of the 50 most recent violations are still open.

HPD violations
118
DOB violations
12
ECB violations
3
HPD complaints
131

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 118

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west

    Apr 22, 2026 · Apt 3

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that is missing at public hall, 1st story

    Apr 22, 2026

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 2nd room from east at north located at apt 3, 3rd story, 1st apartment from east at south

    Apr 10, 2026 · Apt 3

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Apr 10, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 3, 3rd story, 1st apartment from east at south

    Apr 10, 2026 · Apt 3

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system locked door at basement at boiler room

    Apr 10, 2026

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 5th room from east located at apt 3, 3rd story, 1st apartment from east at south

    Apr 10, 2026 · Apt 3

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective bell and buzzer intercom system from building entrance to intercom panel at south wall in the private hallway located at apt 3, 3rd story, 1st apartment from east at south

    Apr 10, 2026 · Apt 3

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective baseboard at south wall in the 2nd room from east at north located at apt 3, 3rd story, 1st apartment from east at south

    Apr 10, 2026 · Apt 3

    Open — Nov sent out
Show 40 more ↓
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling of closet at south wall in the 5th room from east located at apt 3, 3rd story, 1st apartment from north at east original violation 18719727 issued 18-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Mar 18, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Mar 18, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Mar 18, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings

    Mar 18, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall

    Mar 18, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Mar 18, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall

    Mar 18, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinge

    Mar 18, 2026

    Open — Nov sent out
  • A

    Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.

    Mar 18, 2026

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures in the kitchen and bathroom in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Open — Nov sent out
  • B

    Refit 2nd egress door at east wall in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Open — Nov sent out
  • B

    Refit door at west wall in the entrance located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over the ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at celing and south wall in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west and north wall in the 5th room from east located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over the ceiling in the 5th room from east located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mailbox lock belonging to apartment 3 at public hall

    Mar 18, 2026

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling of closet at south wall in the 5th room from east located at apt 3, 3rd story, 1st apartment from north at east

    Mar 18, 2026 · Apt 3

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 3, 3rd story, 1st apartment from north at east

    Nov 6, 2025 · Apt 3

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 3, 3rd story, 1st apartment from north at east

    Nov 6, 2025 · Apt 3

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective locking device at door in the entrance located at apt 3, 3rd story, 1st apartment from north at east

    Nov 6, 2025 · Apt 3

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at west and north wall in the 3rd room from east located at apt 3, 3rd story, 1st apartment from north at east

    Nov 6, 2025 · Apt 3

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department east wall in the 1st room from east located at apt 3, 3rd story, 1st apartment from north at east

    Nov 6, 2025 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire ratardant material at east west north wall at public hall, 2nd story

    Nov 6, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at east west north wall at public hall, 2nd story

    Nov 6, 2025

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west

    Oct 9, 2024 · Apt 3

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at east wall in the 5th room from east located at apt 3, 3rd story, 1st apartment from south at west

    Oct 9, 2024 · Apt 3

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective lock and assembly at apartment entrance door in the entrance located at apt 3, 3rd story, 1st apartment from south at west

    Oct 9, 2024 · Apt 3

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the 2nd bathroom from east located at apt 3, 3rd story, 1st apartment from south at west

    Oct 9, 2024 · Apt 3

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective intercom system from building entrance to panel at south wall in the private hallway located at apt 3, 3rd story, 1st apartment from south at west

    Oct 9, 2024 · Apt 3

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at east wall in the 4th room from east located at apt 3, 3rd story, 1st apartment from south at west

    Oct 9, 2024 · Apt 3

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door

    Oct 9, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective grout at ceramic tiles at north, south and east walls in the 2nd bathroom from north located at apt 3, 2nd story, 1st apartment from south at west

    Feb 21, 2024 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at north wall in the 2nd bathroom from north located at apt 3, 2nd story, 1st apartment from south at west

    Feb 21, 2024 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at north wall in the 1st bathroom from north located at apt 3, 2nd story, 1st apartment from south at west

    Feb 21, 2024 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective grout at ceramic tiles at north, south and west walls in the 1st bathroom from north located at apt 3, 2nd story, 1st apartment from south at west

    Feb 21, 2024 · Apt 3

    Closed — Violation closed

DOB building violations · 12

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Construction other optional

    Due to fire

    Mar 23, 2018

    Dob violation - active
  • Construction other optional

    Emerg wrk.5 stry+cell attach landmark bldg&shares pw w/773 st.nicholas ave.suffered fire on 3/22/18.pw affect&risk that flrs might coll.pw is part braced&strl compromised from ground fl to roof.remedy:own immed install shoring max 4'from pw from cell to roof.coordinate install w/ fdny invest.file for permit no later 48 hrs of work start

    Mar 23, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 1, 2010

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
Show 2 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed

ECB violations · 3

  • Class - 1

    Atoi, observe failure to maintain building in code-compliant manner due to the excessive amount of debris piled up on the first floor room creating potential fire hazard, repair and/replace

    Apr 20, 2026 · Penalty $2,530

    Active
  • Class - 2

    Failure to maintain building exterior walls in a code compliant manner. at the time of inspection noted deteriorated and rooted roof cornice. also, multiple vertical cracks at exposure # 1 masonry wall., repair

    Jul 7, 2020 · Penalty $312

    Active
  • Class - 2

    B265 as per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report correct all violating conditions and submit the certificate of correctio

    Sep 21, 2016 · Penalty $500

    Active

Complaints

  • Plumbing

    Water supply

    Jun 9, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Jun 9, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Apr 22, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Apr 22, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Apr 22, 2026 · Apt 3

    Close
  • Paint/plaster

    Wall

    Apr 22, 2026 · Apt 3

    Close
  • Door/window

    Door

    Mar 27, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Mar 27, 2026 · Apt 3

    Close
  • Plumbing

    Water supply

    Mar 27, 2026 · Apt 3

    Close
  • Door/window

    Door

    Mar 27, 2026 · Apt 3

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Mar 24, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Mar 24, 2026 · Apt 3

    Close
  • Door/window

    Door

    Mar 24, 2026 · Apt 3

    Close
  • Door/window

    Door

    Mar 24, 2026 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Mar 6, 2026 · Apt 3

    Close
  • Door/window

    Door

    Mar 6, 2026 · Apt 3

    Close
  • Electric

    Wiring

    Mar 6, 2026 · Apt 3

    Close
  • Paint/plaster

    Wall

    Mar 6, 2026 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Mar 6, 2026 · Apt 3

    Close
  • Water leak

    Slow leak

    Mar 6, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Mar 6, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Oct 23, 2025 · Apt 3

    Close
  • Electric

    Wiring

    Oct 23, 2025 · Apt 3

    Close
  • Door/window

    Window frame

    Oct 23, 2025 · Apt 3

    Close
  • General

    Cabinet

    Oct 23, 2025 · Apt 3

    Close
  • Door/window

    Door

    Oct 23, 2025 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Oct 10, 2025 · Apt 3

    Close
  • Door/window

    Door

    Oct 10, 2025 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Oct 10, 2025 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Oct 10, 2025 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Oct 10, 2025 · Apt 3

    Close
  • Paint/plaster

    Wall

    Oct 10, 2025 · Apt 3

    Close
  • Door/window

    Door

    Oct 10, 2025 · Apt 3

    Close
  • General

    Cabinet

    Oct 10, 2025 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Oct 10, 2025 · Apt 3

    Close
  • Paint/plaster

    Wall

    Oct 10, 2025 · Apt 3

    Close
  • Safety

    Carbon monoxide detector

    Oct 10, 2025 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Jun 30, 2025 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Jun 30, 2025 · Apt 3

    Close
  • General

    Cooking gas

    Jun 30, 2025 · Apt 3

    Close
  • Appliance

    Electric/gas range

    Jun 30, 2025 · Apt 3

    Close
  • General

    Ventilation system

    Oct 28, 2024 · Apt 3

    Close
  • Door/window

    Door

    Oct 28, 2024 · Apt 3

    Close
  • Electric

    Wiring

    Oct 28, 2024 · Apt 3

    Close
  • General

    Bell/buzzer/intercom

    Oct 28, 2024 · Apt 3

    Close
  • Safety

    Carbon monoxide detector

    Oct 28, 2024 · Apt 3

    Close
  • General

    Bell/buzzer/intercom

    Oct 8, 2024 · Apt 3

    Close
  • Safety

    Carbon monoxide detector

    Oct 8, 2024 · Apt 3

    Close
  • Paint/plaster

    Wall

    Oct 8, 2024 · Apt 3

    Close
  • Paint/plaster

    Wall

    Oct 8, 2024 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1895
Floors
4
Residential units
4
Building area
5,768 ft²
Lot area
2,160 ft²
Zoning
R6A
Community board
109
Council district
9
Block / lot
2063 / 35
Assessed value
$517,500
Landmark / historic district
Hamilton Heights / Sugar Hill Historic District

HPD registration #113551, last renewed Apr 29, 2026.

Questions about 771 St Nicholas Avenue

Who owns 771 St Nicholas Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 771 St. Nicholas Avenue LLC.

Does 771 St Nicholas Avenue have violations?

Yes. NYC HPD has recorded 118 housing violations at this property.

Is 771 St Nicholas Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 771 St Nicholas Avenue built?

City records list 1895 as the year it was built.

How many apartments are in 771 St Nicholas Avenue?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.