roofy

2905 Fredrick Douglass Bl

Manhattan, NY 10039BBL 1-02047-0012Map

Owner of record: Bethany Housing Development Fund Corp

2905 Fredrick Douglass Bl is an elevator apartment building built in 1993 in Manhattan, 10039. It has 77 residential units across 7 floors. The owner of record is Bethany Housing Development Fund Corp. HPD has recorded 38 housing violations here, most recently on August 20, 2026. 5 of the 38 most recent violations are still open.

HPD violations
38
DOB violations
30
ECB violations
6
HPD complaints
94

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 20, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 38

  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4m, 4th story, 6th apartment from west at north

    Aug 20, 2026 · Apt 4M

    Open — Notice of issuance sent to tenant
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ... in the entrance located at apt 1h, 1st story, 2nd apartment from west at north

    Apr 3, 2026 · Apt 1H

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective closer arm at building entrance door

    Jan 23, 2024

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of a double cylinder lock, at west bulkhead.

    Aug 23, 2022

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of a double cylinder lock, at east bulkhead.

    Aug 23, 2022

    Closed — Violation closed
  • I

    Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 6th story north 1 apartment # 6g under vacate order # 194917

    Mar 9, 2022

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceilings and all walls in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north

    Feb 23, 2022 · Apt 6G

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • C

    Replace with new the missing glass pane at upper and lower window sash at north in the 1st room from north at west located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the 1st room from north at east located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
Show 28 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the 1st room from north at west located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the kitchen located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the bathroom located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at all range and all fixtures in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the private hallway located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • C

    Replace with new the missing glass pane at upper and lower window sash at north in the 1st room from north at east located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in water closet in the bathroom located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • A

    Properly repair the broken or defective intercom buzzer system from bulding entrance to apartment wall panel at east in the foyer located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • C

    Replace with new the missing glass pane at upper and lower window sash at east at public hall, 5th story

    Feb 17, 2022

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north

    Feb 17, 2022 · Apt 6G

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 16, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 2, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective bell and return buzzer system located at apt 2g, 2nd story, 1st apartment from east at south

    Nov 6, 2019 · Apt 2G

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 3rd apartment from east at south

    Oct 16, 2019 · Apt 2C

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 10, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 9, 2017

    Closed — Violation dismissed
  • C

    Provide adequate supply of cold water for the fixtures ... in the entire apartment located at apt 5g, 5th story, 2nd apartment from west at north

    Jul 27, 2017 · Apt 5G

    Closed — Violation dismissed
  • C

    Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 5g, 5th story, 2nd apartment from west at north

    Jul 27, 2017 · Apt 5G

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 2, 2015

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 7e, 7th story, 4th apartment from east at south

    Apr 7, 2014 · Apt 7E

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 6b, 6th story, 2nd apartment from east at south

    Oct 25, 2011 · Apt 6B

    Open — Nov certified late
  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 7a, 7th story, 1st apartment from east at south

    Mar 2, 2011 · Apt 7A

    Open — Not complied with
  • B

    Replace with new the broken or defective sink base cabinet in the kitchen located at apt 6c, 6th story, 2nd apartment from east at south

    Apr 24, 2008 · Apt 6C

    Open — Nov certified late

DOB building violations · 30

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - active
  • Construction other optional

    Fire in apt #6g has rendered the unit unsafe to occupy. noted all windows in unit broken and boarded up with plywood and no natural light or ventilation available. extensive damage to interior walls of unit and exposed electrical wiring noted throughout unit. building management informed to immediately replace missing firestopping.

    Feb 15, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 31, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 14, 2020

    Dob violation - active
Show 20 more ↓
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 27, 2018

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2017

    Mar 27, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2017

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 31, 2014

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2013

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 21, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - active

ECB violations · 6

  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy : file application, install dlm

    Dec 31, 2020 · Penalty $1,250

    Active
  • Class - 1

    42m07,40p07 no door lock monitor device installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nyc bc.this is a controller feature in which ensures passenger safety.file application inst

    Jul 13, 2020 · Penalty $1,250

    Active
  • Class - 2

    57l10,57m07,42l09,40o02,41m07,70o02,71l11,16m07,18m07,26l06,05l10,67l10,68m07. 57-cover for wieres and brushes; 42-jumpers on floor at motorcontroller and drive unit; 57-motor rumble #41 signage; 70-clean pit

    Nov 24, 2014 · Penalty $500

    Active
  • Class - 1

    97x10 #97 failure to maintain bldg in code compliant manner service equipment elevator as per bc3001.2 & 27-987 dob records show the only elevator in bldg as active.upon insp the device 1p273536 is found to be

    Oct 6, 2014 · Penalty $1,000

    Active
  • Class - 2

    77m07.60m07.70o02. 77m07 provide guard for light under car 60m07 provide guards for motor rm lighting

    Sep 29, 2008

    Resolve
  • Non-hazardous

    85bb5/8v1 85-bb-5-file and perform 5 year safety test.8-v-1-adjust leveling on 6th floor.

    Jul 8, 2005 · Penalty $350

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Aug 11, 2026 · Apt 4M

    Close
  • Appliance

    Refrigerator

    Aug 11, 2026 · Apt 4M

    Close
  • Appliance

    Electric/gas range

    Aug 11, 2026 · Apt 4M

    Close
  • General

    Cabinet

    Aug 11, 2026 · Apt 4M

    Close
  • Paint/plaster

    Wall

    Aug 11, 2026 · Apt 4M

    Close
  • General

    Cabinet

    Aug 11, 2026 · Apt 4M

    Close
  • Plumbing

    Water supply

    Jun 13, 2026 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Jun 12, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Jun 12, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Unsanitary condition

    Sewage

    Dec 4, 2025 · Apt 1H

    Close
  • Unsanitary condition

    Pests

    May 22, 2025 · Apt ENTIRE

    Close
  • General

    Cooking gas

    Jan 7, 2025 · Apt 2M

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2024 · Apt 151

    Close
  • Plumbing

    Radiator

    Mar 13, 2024 · Apt 151

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 15, 2023 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Feb 23, 2022 · Apt 6G

    Close
  • Paint/plaster

    Wall

    Feb 16, 2022 · Apt 6G

    Close
  • Door/window

    Window pane

    Feb 16, 2022 · Apt 6G

    Close
  • Electric

    Power outage

    Feb 16, 2022 · Apt 6G

    Close
  • Electric

    Wiring

    Feb 16, 2022 · Apt 6G

    Close
  • General

    Cooking gas

    Feb 5, 2022 · Apt 6G

    Close
  • Electric

    Power outage

    Feb 5, 2022 · Apt 6G

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2022 · Apt 6G

    Close
  • Heat/hot water

    Entire building

    Nov 17, 2021 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Jun 27, 2021 · Apt 6F

    Close
  • Door/window

    Door

    Jan 26, 2021 · Apt 2G

    Close
  • General

    Bell/buzzer/intercom

    Jan 26, 2021 · Apt 2G

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2020 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2020 · Apt 3K

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2020 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Oct 10, 2019 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Oct 2, 2019 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Oct 2, 2019 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Dec 31, 2018 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Sep 13, 2018 · Apt 1E1F

    Close
  • Unsanitary condition

    Pests

    Sep 13, 2018 · Apt 1C1D

    Close
  • Unsanitary condition

    Pests

    Sep 13, 2018 · Apt 1A1B

    Close
  • Unsanitary condition

    Pests

    Sep 12, 2018 · Apt 2K2J

    Close
  • Unsanitary condition

    Pests

    Sep 12, 2018 · Apt 1K1J

    Close
  • Heat/hot water

    Entire building

    Mar 8, 2018 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2018 · Apt BLDG

    Close
  • Plumbing

    Radiator

    Jan 2, 2018 · Apt 6F

    Close
  • Door/window

    Window frame

    Jan 2, 2018 · Apt 6F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D9)
Year built
1993
Floors
7
Residential units
77
Building area
55,433 ft²
Lot area
19,990 ft²
Zoning
R8
Community board
110
Council district
9
Block / lot
2047 / 12
Assessed value
$2,944,350
Landmark / historic district
No

HPD registration #141073, last renewed Oct 16, 2025.

Questions about 2905 Fredrick Douglass Bl

Who owns 2905 Fredrick Douglass Bl?

The owner of record in NYC Department of City Planning PLUTO data is Bethany Housing Development Fund Corp.

Does 2905 Fredrick Douglass Bl have violations?

Yes. NYC HPD has recorded 38 housing violations at this property.

Is 2905 Fredrick Douglass Bl rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2905 Fredrick Douglass Bl built?

City records list 1993 as the year it was built.

How many apartments are in 2905 Fredrick Douglass Bl?

It has 77 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.