2600 7 Avenue
Manhattan, NY 10039BBL 1-02036-0029Map
Owner of record: 2600 7th Avenue Realty, LLC
2600 7 Avenue is an elevator apartment building built in 2018 in Manhattan, 10039. It has 103 residential units across 7 floors. The owner of record is 2600 7th Avenue Realty, LLC. HPD has recorded 14 housing violations here, most recently on May 8, 2026. 5 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 10
- ECB violations
- 31
- HPD complaints
- 14
Available now in this building
For rent1-bedroom condo for rent in central harlem
New York, NY
For rent1-bedroom condo for rent in central harlem
New York, NY
For rent1-bedroom condo for rent in central harlem
New York, NY
For rent2-bedroom condo for rent in central harlem
New York, NY
For rent2-bedroom condo for rent in central harlem
New York, NY
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Dec 20, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Dec 20, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing
Dec 20, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 20, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 20, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing
Dec 20, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing
Dec 20, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed
Show 4 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls in the private hallway located at apt 1l, 1st story, apartment at north
Apr 3, 2019 · Apt 1L
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1l, 1st story, apartment at north
Apr 3, 2019 · Apt 1L
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls in the 1st room from north at west located at apt 1l, 1st story, apartment at north
Apr 3, 2019 · Apt 1L
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective refrigerator door gasket in the kitchen located at apt 1l, 1st story, apartment at north
Apr 3, 2019 · Apt 1L
Open — Nov sent out
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 26, 2000
Vw*-violation - work w/o permit dismissed
ECB violations · 31
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips)report documenting the conditions of psid#m0002
Oct 1, 2024 · Penalty $2,500
Resolve - Class - 1
Housekeeping. at the time of inspection at a 7 sty nb i observed debris piled up throughout the site. there was debris in the egress pathways creating a hazardous condition in case of an emergency for workers
Dec 4, 2019 · Penalty $2,500
Resolve - Class - 1
Log. at the time of inspection at a 7 sty nb i observed no competent person at the site. there were workers on site,but none spoke english & there was no one to interpret for the worker if there was a hazardous
Dec 4, 2019 · Penalty $10,000
Resolve - Class - 1
Sec. 3303.4.2 containers. at the time of inspection at a 7 sty nb,i observed containers at exp#1&4 in the street w/no covers & filled above the rim of the container. these container also were not enclosed with
Dec 4, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain reward of pre shift meeting for eahc owkrer at time of inspection of actiev site i had asked superintendnet for the by for pre shift safety meeting i was plesented with a log book with the l
Nov 26, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirments at time of inspection of actiev constuction siet i observed some rooms were used as refuse storage some of this garbage was found to hav esignif
Nov 26, 2019
Resolve - Class - 1
Bc3308.1.failure to provide adequate safety netting systems and guardrail systems:as noted:at time of my inspection plow missing netting andguardrail from 2nd fl to 7 fl and not maintain by code maintain nettin
Jun 20, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3303.4.7.storage new sidewalks,walkways and pathways as noted-at time of inspection an active jobsite observed (10) stack of brick double stack over the 3 fl barriers.contrery to the code.stop storage materia
Jun 20, 2019 · Penalty $2,500
Resolve - Class - 1
Permit holder failed to hold pre-shift safety netting prior to commencement of work. noted at active jobsite when asking competent person for pre-shift safety netting logs it coul dnot produce them. noted 1-
May 23, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. con struction material and debris not properly stored or removed from site. noted on active site 1-dumpster at front of building (exp1) full
May 23, 2019 · Penalty $2,500
Resolve
Show 21 more ↓
- Class - 1
Tools and maerials used not in accordance with manufacturing specifications. noted: an active jobsite, 1st flr (ground level) one worker on ladder using a handheld grinder w/o the protect guard; two(2) other wo
May 23, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. noed at active site for new building. 7 stories (two (2) room hoist one finihleaoding an dcoming down, the other leading. both
May 23, 2019 · Penalty $10,000
Resolve - Class - 1
3301.4 inspection on temporary equipment harness. at the time of inspection at an active jobsite nb7 story building it was observed on exposure #3 contractor on supported pipe scaffold putting up the board
Apr 9, 2019 · Penalty $2,500
Resolve - Class - 2
Inadequate housekeeping. at the time of inspection at an active job site nb.7 story building it was observed on various floors throughout the building inadequate housekeeping with debris consisting of const
Apr 9, 2019
Resolve - Class - 1
3309.10 failure to provide roof protection. at time of inspection at an active jobsite nb 7 story building it was observed on exposure #3/4corner that the roof of the adjoining property was not protected from
Apr 9, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide osha training. at the time of inspection at an active jobsite nb 7 story building upon request for osha training/cardworker mei jian yuan with nyc drivers license id #523773116 did not
Apr 9, 2019 · Penalty $5,000
Resolve - Class - 1
3308.5 failure to provide adequate vertical netting. at time of inspection at an active jobsite nb 7 story building it was observed on various floors at the leading edges and on the stair railings verticle
Apr 9, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide osha training.@time of inspection @an active jobsite nb 7 sty buidling, upon request for osha training/card worker met jian yuan with nyc drivers license id#523 773 116 did not have no osha
Apr 9, 2019
Resolve - Class - 1
3314.1 partial work on facade work.allowed to work only to make safe. note @ time of insp i observed supported scaffold in use not to code apecs missing guard system 2)planks not tied down. 3)decks not fully pl
Mar 19, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply with astm c 31 standards for concrete cylinder test samples. as noted: at time of my inspection observed at exposure #1 test cylinder in ice box and 7 test cylinders on the outside as the
Jan 24, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to perform proper concrete washout procedures at site collect-ing of entertainment. as noted at time of my inspection at an active job site observed a waste container used as washout boxc with sand
Jan 24, 2019 · Penalty $2,500
Resolve - Class - 2
Respondent failed to make proper notification for mobile crane after may 1,2018. mobile crane cn#1031/18 departed from above address but didnot notify dept of its departure. remedy:make proper notification to c
Dec 20, 2018 · Penalty $2,500
Resolve - Class - 1
Water with cement anbd debris going down sewer at time of inspection for a complaint upon arrival i observed worker hosing concrete water along with debris down city sewer system. sewer was not protected as
Oct 3, 2018 · Penalty $625
Resolve - Class - 1
Bc3301.6 decision drawings. at time of inspection for a complaint upon arrival and inspection i observed multiple platforms built in elevator shaft and on flooring when i asked for a design drawing none
Oct 3, 2018
Resolve - Class - 1
Standing water. at time of inspection for a complaint i observed a pitin the middle of building with more than 3" of standing water standingwater creates a hazard for a breeding ground for mosquitoes.rmdy: pump
Oct 3, 2018 · Penalty $2,500
Resolve - Class - 1
Overhead protection exp 3 and corner of 3 and 4 at time of inspection for a complaint i observed that overhead protection was missing at exp3 wall was aprx 60" over fence and below was a active playground al
Oct 3, 2018 · Penalty $10,000
Resolve - Class - 1
Concrete washout. at time of inspection for complaint upon arrival i observed concrete pump truck dumping and washing concrete into street with no approved concrete washout container, concrete water and debris
Oct 3, 2018 · Penalty $2,500
Resolve - Class - 1
After hours variance-work before hours upon arrival to jobsite at 8:20am,i observed construction activity(excavator loading dump truck,workers on site,equipment removal)contrary to after hours variance permit
Aug 4, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to safeguard all persons & property affected by const ops job #122847517 was obtained for new bldg & (earthwork) @locn @north/ west corner exavation has damaged & undermined a section of playground & pu
Apr 4, 2018 · Penalty $10,000
Resolve - Class - 1
Failure to notify the dept prior to commencement of earthwork. at timeof inspection observed an active construction site with excavation work on progress, during inspection i ask contractor for notification
Apr 2, 2018 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit. work noted: creating a curb cut approx 26'long at west 151 street. remedy: file plan & obtain approval & permit or restore back to legal prior condition.
Jul 26, 2000
Resolve
Complaints
- Heat/hot water
Entire building
Jan 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2023 · Apt 2G
Close - Heat/hot water
Entire building
Feb 7, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 18, 2022 · Apt 2G
Close - Unsanitary condition
Mold
Nov 26, 2021 · Apt 5C
Close - Appliance
Electric/gas range
Mar 29, 2019 · Apt 1L
Close - Appliance
Refrigerator
Mar 29, 2019 · Apt 1L
Close - Unsanitary condition
Mold
Mar 29, 2019 · Apt 1L
Close - Paint/plaster
Wall
Mar 29, 2019 · Apt 1L
Close - Paint/plaster
Wall
Mar 29, 2019 · Apt 1L
Close
Show 4 more ↓
- Water leak
Heavy flow
Mar 29, 2019 · Apt 1L
Close - Plumbing
Toilet
Mar 29, 2019 · Apt 1L
Close - Plumbing
Basin/sink
Mar 29, 2019 · Apt 1L
Close - Paint/plaster
Wall
Mar 29, 2019 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2018
- Floors
- 7
- Residential units
- 103
- Building area
- 93,505 ft²
- Lot area
- 19,983 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 2036 / 29
- Assessed value
- $11,784,150
- Landmark / historic district
- No
HPD registration #144987, last renewed Jul 29, 2026.
Questions about 2600 7 Avenue
Who owns 2600 7 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2600 7th Avenue Realty, LLC.
Does 2600 7 Avenue have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 2600 7 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2600 7 Avenue built?
City records list 2018 as the year it was built.
How many apartments are in 2600 7 Avenue?
It has 103 residential units and 105 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.