300 West 122 Street
Manhattan, NY 10027BBL 1-01948-7504Map
Owner of record: Bespoke Harlem West LLC
300 West 122 Street is a condominium built in 2019 in Manhattan, 10027. It has 170 residential units across 13 floors. The owner of record is Bespoke Harlem West LLC. HPD has recorded 35 housing violations here, most recently on May 21, 2024.
- HPD violations
- 35
- DOB violations
- 2
- ECB violations
- 31
- HPD complaints
- 23
Available now in this building
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5c, 5th story, 5th apartment from north at east
May 21, 2024 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
May 19, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7c, 7th story, 6th apartment from north at east
May 19, 2024 · Apt 7C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5c, 5th story, 6th apartment from south at west
Feb 15, 2024 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room at basement
Feb 15, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5c, 5th story, 6th apartment from north at east
Jan 22, 2024 · Apt 5C
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 12, 2024
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 12, 2024
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jan 12, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 12, 2024
Closed — Violation closed
Show 25 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 12, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 12, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jan 12, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5c, 5th story, 6th apartment from north at east
Jan 3, 2024 · Apt 5C
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Jun 6, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 27, 2023
Closed — Violation closed - BHazardous
Properly repair the broken or defective fauset /hot water handle at bathtub in the bathroom located at apt 7o, 7th story, 4th apartment from south at west
Jan 27, 2023 · Apt 7O
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 27, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jan 27, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 27, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 27, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jan 27, 2023
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 27, 2023
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 23, 2023
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at lower window sash at west wall in the 3rd room from east located at apt 10o, 10th story, 2nd apartment from south at west
Jan 23, 2023 · Apt 10O
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 3rd room from east located at apt 10o, 10th story, 2nd apartment from south at west
Jan 23, 2023 · Apt 10O
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 30, 2022
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Nov 30, 2022
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing sign at public hall, 1st story
Nov 30, 2022
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 30, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 30, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing sign at public hall, 1st story
Nov 30, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 30, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 30, 2022
Closed — Violation closed
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 22, 2025
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 2, 2022
Dob violation - dismissed
ECB violations · 31
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips)report documenting the conditions of psid#m0003
Oct 1, 2024
Resolve - Class - 1
Failure to maintain i observed construction debris along side st.nicholas avenue at exp#1, under permit#m00613813-l1-gc-cx obstructing access to the shamese connection for emergency responders and causing a haz
Nov 21, 2022 · Penalty $2,500
Resolve - Class - 1
3301.1.3 partial stop work on boom and scissor lifts failure to followmanufacturer specifications.note at time of inspection i observed 1)boom in use by julio maurogica without arial training card and jose beni
Dec 1, 2021 · Penalty $2,500
Resolve - Class - 2
3314.1 stop all use of interior supported scaffolds allowed to work tomake safe only.note at time of inspection i observed supported scaffolds in place not to code specification 1).missing guardrails 2).mudsill
Dec 1, 2021 · Penalty $625
Resolve - Class - 2
Posting of unlawful signs,informaiton pictorial representation,business or advertising messages on protective structures.note:at time of a new 13 story building active job site i observed sidewalk shed in place
Nov 17, 2021 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction docume3nts and/or apprived amendments.note:at time of my inspection i observed the following violaiton conditions at 121 street location s.w.s partially removed wi
Nov 17, 2021 · Penalty $1,250
Resolve - Class - 2
Bc 3310.5 failure to designate/or have site safety manager present as required.note:at time of inspection of a 12 story bldg upon request tosee site safety manager on pw2 as require to verify compliance with pw
Oct 1, 2021 · Penalty $625
Resolve - Class - 1
Work doesnt conform to approved const docs &/or amendments.ato my inspi observed supported scf@exp1 w/following conditions:-no stair tower to access scf,workers were climbing in&out of window to obtain access.-
Jun 3, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3314.4 scfmaintenance ato my insp i observed supported scf@exp1w/alloutrigger levels planked&chunks of concrete debris thruout all levels.ato my insp workers were performing work below this debris.this poses
Jun 3, 2021 · Penalty $625
Resolve - Class - 2
3314.1 supported scaffold does not meet code specification.at bulkheadon roof-supported scaffold not code compliant exp1.note at time of inspection of a 12 story nb active construction site,i observed supported
May 3, 2021 · Penalty $1,250
Resolve
Show 21 more ↓
- Class - 1
Sec. 3301.2 holes not covered(larger than 2"). note: at time of inspection at 12 sty bldg active jobsite w/bldg topped off i observed throughout jobsite holes/penetrations large than 2 inches this condition cre
Dec 2, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain and institute safety measures. note:at time of inspection at new 12 story building active jobsite bldg topped off i observed throughout jobsite at circuit breaker panels exposed electrical w
Dec 2, 2020 · Penalty $10,000
Resolve - Class - 1
Bc 3308.5 vertical netting. at time of inspection on a 12 story new building currently at bulkhead level observed inadequate vertical netting in place on floors 13,12,11&10(setback) exposure#2. vertical netting
Nov 24, 2020 · Penalty $2,500
Resolve - Class - 2
Bc 3303.4.5.2 storage of materials near perimeter edge(unenclosed). attime of inspection on a 12 story new building currently at bulkhead level observed at exposure#2 on floors 11,12&13 storage of ducts&metal s
Nov 24, 2020 · Penalty $620
Resolve - Class - 2
Bc 3303.8 standpipe not in state of readiness. at time of inspection on a 12 story new building currently at bulkhead level observed at the 13th fl(penthouse) standpipe not in state of readiness due to it not b
Nov 24, 2020 · Penalty $620
Resolve - Class - 1
Work does not conform to approved construction documents observed shaft w/platform erected within.when i requested design drawings i noted that screw anchors not per "shaft plan" were not per section a-a or
May 26, 2020 · Penalty $625
Resolve - Class - 1
Failure to maintain guardrails & netting.observed netting at guardrails loose & not serviced at several fls,& at roof through out at variouslocations.also observed cables not taut(tight) at various locations.
May 26, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to maintain guardrails at time of inspectionobserved 2x4 guardrail system that was more than (4) four inches from wall therefore allowing persosn to fall through to lower floor also observed cable syste
May 14, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to notify the dept of an incident/accident that resulted in a fatality or injury. a worker was injured when he hurt his hand on the pump during concrete operation,ambulance was called. as per a check of
May 12, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to notify the dept of an incident/accident that resulted in fatality or injury. a worker was injured when removing garbage he tripped over hitting his foot,worker was taken to a hospital. as per a check
May 12, 2020 · Penalty $1,250
Resolve - Class - 1
Provision of law:bc3307.6.4.8.lighting.note:ata time of inspection of new 13 story building active jobsite building at 12 fl.i observed underside of sidewalk shed where light fixtures are located with all light
Apr 20, 2020 · Penalty $625
Resolve - Class - 1
Bc3303.3=watch person.note at time of my inspection of new 13 story building at roof level (approx. 26,904 square feet) siet closed and there was no construction activity upon shouting and banging on fence and
Apr 18, 2020 · Penalty $625
Resolve - Class - 1
Failure to notify the department of an accident or incident that resulted in a fatality or injury. a worker was removing a piece of plywood when he scrapped his nails ambulance was called & was taken to the
Feb 19, 2020 · Penalty $1,250
Resolve - Class - 1
Bc3301.2/controlled access zone.in response to incident i observed new13 story building being erected currently 9th story being poured.i observed active construction work in progress.i observed on the 8th floor
Feb 10, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3308.5/failure to maintain vertical netting.at time of incident inspection i observed 13 story building being erected currently at 9 storywith active work in progress.i observed throughout jobsite vertical ne
Feb 10, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3301.2/holes not convered;at time of incident inspection at new 13 story building active jobsite building currently at 9 story.i observed throughout jobsite at all stories holes not covered that are longer th
Feb 10, 2020 · Penalty $2,500
Resolve - Class - 1
Housekeeping;at time of inspection of new 13 story building active jobsite i observed throughout jobsite on multiple floors and various locations large amounts of construction debris scattered throughout causin
Feb 10, 2020 · Penalty $2,500
Resolve - Class - 2
Bc3307.6.4.11/sidewalk shed color;at time of inspection of new 13 story building active jobsite building at 9 story i observed sidewalk shedparapet walls painted black at all exposures.sidewalk shed parapet wal
Feb 10, 2020 · Penalty $1,250
Resolve - Class - 1
Hydrostatic test.at time of inspection of new 13 story building activejobsite currently at 9 story.upon request for hydrostatic tet results none was provided failure to perform hydrostatic test as required crea
Feb 10, 2020 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction documents &/or amemdments-site safety plan. note: at time of inspection at a 13 sty nb,i observed on the ground/street level sws protection & pedestrian walkway wa
Dec 4, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building exterior observe: at roof top parapet wall several missing.broken clay parapet caps. rem: repair building wall per code/maintain building.
Oct 3, 2009 · Penalty $500
Resolve
Complaints
- Heat/hot water
Apartment only
May 20, 2024 · Apt 5C
Close - Heat/hot water
Apartment only
May 19, 2024 · Apt 7M
Close - Heat/hot water
Apartment only
May 6, 2024 · Apt 7C
Close - Heat/hot water
Apartment only
Mar 19, 2024 · Apt 3E
Close - Heat/hot water
Entire building
Feb 20, 2024 · Apt 7M
Close - Heat/hot water
Apartment only
Feb 14, 2024 · Apt 5C
Close - Heat/hot water
Apartment only
Feb 4, 2024 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 19, 2024 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 18, 2024 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 10, 2024 · Apt 5C
Close
Show 13 more ↓
- Heat/hot water
Apartment only
Jan 1, 2024 · Apt 5C
Close - Heat/hot water
Apartment only
Jun 5, 2023 · Apt 5A
Close - Safety
Fire escape
May 12, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2023 · Apt 7O
Close - Heat/hot water
Apartment only
Jan 20, 2023 · Apt 10O
Close - Door/window
Window frame
Jan 20, 2023 · Apt 10O
Close - Unsanitary condition
Pests
Nov 10, 2022 · Apt 10L
Close - Unsanitary condition
Pests
Nov 10, 2022 · Apt 10L
Close - Elevator
Maintenance
Aug 20, 2022 · Apt 9J
Close - Elevator
Maintenance
Aug 20, 2022 · Apt 9J
Close - Heat/hot water
Entire building
Mar 6, 2022 · Apt BLDG
Close - Plumbing
Sprinkler
Nov 2, 2005 · Apt BLDG
Close - Electric
Bell-buzzer/intercom
Apr 20, 2004 · Apt 4G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2019
- Floors
- 13
- Residential units
- 170
- Building area
- 166,189 ft²
- Lot area
- 23,521 ft²
- Zoning
- R8A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1948 / 7504
- Assessed value
- $25,708,946
- Landmark / historic district
- No
HPD registration #145020, last renewed Sep 18, 2025.
Questions about 300 West 122 Street
Who owns 300 West 122 Street?
The owner of record in NYC Department of City Planning PLUTO data is Bespoke Harlem West LLC.
Does 300 West 122 Street have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 300 West 122 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 300 West 122 Street built?
City records list 2019 as the year it was built.
How many apartments are in 300 West 122 Street?
It has 170 residential units and 173 units in total.