2177 Fredrick Douglass Bl
Manhattan, NY 10026BBL 1-01944-0036Map
Owner of record: Canaan Baptist Hsg Etal
2177 Fredrick Douglass Bl is an elevator apartment building built in 1989 in Manhattan, 10026. It has 80 residential units across 7 floors. The owner of record is Canaan Baptist Hsg Etal. HPD has recorded 50 housing violations here, most recently on September 2, 2026. 14 of the 50 most recent violations are still open.
- HPD violations
- 50
- DOB violations
- 37
- ECB violations
- 24
- HPD complaints
- 146
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 50
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at fire door to public hall stair '' a '' at public hall, 3rd story
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north
Jun 12, 2026 · Apt 3F
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3f, 3rd story, 1st apartment from west at north
Jun 12, 2026 · Apt 3F
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 7m, 7th story, 1st apartment from east at south
Dec 20, 2024 · Apt 7M
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 20, 2022 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 20, 2022 · Apt 2F
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 20, 2022 · Apt 2F
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 11, 2022 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 11, 2022 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Nov 15, 2022 · Apt 2F
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Nov 15, 2022 · Apt 2F
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Nov 15, 2022 · Apt 2F
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors .. in the entrance located at apt 7e, 7th story, 2nd apartment from west at north
Jan 12, 2022 · Apt 7E
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors .. in the entrance located at apt 6e, 6th story, 2nd apartment from west at north
Jan 12, 2022 · Apt 6E
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). ...defective located at apt 3g, 3rd story, 6th apartment from east at south
Jun 1, 2020 · Apt 3G
Open — Nov sent out - BHazardous
Repair or replace the smoke detector ..defective located at apt 3g, 3rd story, 6th apartment from east at south
Jun 1, 2020 · Apt 3G
Open — Nov sent out - BHazardous
Properly repair the broken or defective ...the bell buzzer system from the building entrance to....the west wall... in the 1st room from north located at apt 3g, 3rd story, 6th apartment from east at south
Jun 1, 2020 · Apt 3G
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3g, 3rd story, 6th apartment from east at south
Apr 22, 2020 · Apt 3G
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3g, 3rd story, 6th apartment from east at south
Apr 22, 2020 · Apt 3G
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire building located at apt 1g, 1st story, 5th apartment from east at south
Apr 18, 2020 · Apt 1G
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire building located at apt 1g, 1st story, 5th apartment from east at south
Apr 18, 2020 · Apt 1G
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1d, 1st story, 2nd apartment from west at north
Apr 15, 2020 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors the door in the entrance located at apt 2a, 2nd story, 6th apartment from west at north
Nov 4, 2019 · Apt 2A
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 2, 2015
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls throughout in the bathroom located at apt 6h, 6th story, 5th apartment from south at west
Dec 21, 2012 · Apt 6H
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling, east, west , north, and south wall approx.25 sq. ft. in the bathroom located at apt 6h, 6th story, 5th apartment from south at west
Dec 21, 2012 · Apt 6H
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... walls in the bathroom located at apt 6h, 6th story, 5th apartment from east at south
Dec 5, 2012 · Apt 6H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the bathroom located at apt 6h, 6th story, 5th apartment from east at south
Dec 5, 2012 · Apt 6H
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 6d, 6th story, 3rd apartment from east at south
Sep 24, 2010 · Apt 6D
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at the bathtub, in the bathroom located at apt 6d, 6th story, 3rd apartment from east at south
Sep 24, 2010 · Apt 6D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all the walls and the ceilings, in the entire apartment located at apt 6d, 6th story, 3rd apartment from east at south
Sep 24, 2010 · Apt 6D
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 6d, 6th story, 3rd apartment from west at north
Sep 8, 2010 · Apt 6D
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 6d, 6th story, 3rd apartment from west at north
Sep 8, 2010 · Apt 6D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the entire apartment located at apt 6h, 6th story, 6th apartment from east at south
Jul 10, 2010 · Apt 6H
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the entire apartment located at apt 6h, 6th story, 6th apartment from east at south
Jul 10, 2010 · Apt 6H
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 3k, 3rd story, 3rd apartment from west at north
Apr 8, 2010 · Apt 3K
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 3k, 3rd story, 3rd apartment from west at north
Apr 8, 2010 · Apt 3K
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 3k, 3rd story, 3rd apartment from west at north
Apr 8, 2010 · Apt 3K
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin bedbuggs in the entire apartment located at apt 6b, 6th story, 5th apartment from west at north
Sep 24, 2009 · Apt 6B
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin bedbugs in the entire apartment located at apt 6b, 6th story, 5th apartment from west at north
Jul 10, 2009 · Apt 6B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in at wastepipe at bathtub in the bathroom located at apt 3k, 3rd story, 2nd apartment from east at south
Apr 22, 2009 · Apt 3K
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin bedbugs in the entire apartment located at apt 6h, 6th story, 5th apartment from east at south
Jan 17, 2009 · Apt 6H
Closed — Violation closed - BHazardous
Replace with new the broken or defective refridgator gasket in the kitchen located at apt 3k, 3rd story, 3rd apartment from east at south
Oct 12, 2007 · Apt 3K
Closed — Violation dismissed
DOB building violations · 37
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 12, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Feb 3, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed
Show 27 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 4, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 24
- Class - 2
As per defects in cellar boiler room. spill switch not attached to barometric damper hlw 1 and switches on boilers need adjusting-prv for hlw w/o discharge pipe-exposed elect wires on lwc and circulator, hlw 1-
May 17, 2023 · Penalty $3,125
Active - Class - 2
Removal of sidewalk shed without dob approval at the time of my inspection building facade was still designated as unsafe the amended facadereport(tr6)had not been accepted and safety measures had already been
Jan 11, 2021 · Penalty $625
Active - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application, install dlm and perfo
Jul 8, 2020
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances.note:roof top guardrail-chain link fence has a broken gate hinge and also section of fence adjoining the bulk head.rem:maintain exterior facade.rep
May 19, 2020
Resolve - Class - 2
Temporary construction equipment on site expired permit.at time of inspection i observed an construction site was perform facade repair was on progress,during inspection noted the sidewalk shed the permit expir
May 20, 2019 · Penalty $625
Resolve - Class - 2
Work permit expired.at the time of inspection responding to a complaint observed a sidewlak shed at exposure #1 and 4 during inspection after search on bis and dob now noted that the sidewalk shed permi
May 2, 2019
Resolve - Class - 2
Permit expired.@time of observed a heavy duty sidealk in the bldg 2177frederick douglass blvd @exp 1 & 4.also observed in dob bis system sidewalk shed permit #140606789-sh expired 3/13/19.sidewalk shde still ex
Apr 30, 2019
Resolve - Class - 2
Sec. 3307.6.5.3 failure to maintain sidewalk shed in order. noted: at time of inspection bolts & screws under the sidewalk shed are not capped. remedy: protect sharp edges.
Oct 20, 2017
Resolve - Class - 2
Sidewalk shed parapet sign is not compliance w/section. noted: at timeof inspection sidewalk shed parapet sign missing the bldg address. thesign must indicate the name of the owner of the property. the sign mus
Oct 20, 2017
Resolve - Class - 2
Prohibited business advertising sign posted on sidewalk shed. noted: at time of inspection business advertising sign for "hks construction"posted on the sidewalk shed. remedy: remove prohibited sign.
Oct 20, 2017
Resolve
Show 14 more ↓
- Class - 1
Owner failed to repair (north elevtion exp1 crack in stucco below 6th floor a.c. grill, open mortar joins at a/c units with cracks in mortarjints) remain. within the time frame recommend by qew1. qewi recommend
Apr 11, 2017 · Penalty $1,630
Resolve - Class - 2
16m07,16al11,100l11,16bl0,100am07. 16-floor marking; 16a-top floor clutch rollers; 100 fire ext motor room expired date; 16b-skin on hatch door needs to be repaired,top floor; 100a-facia plates missing(2
Oct 8, 2013
Resolve - Class - 2
B201,50. 50-found 2 lochnivar hw boilers - pbn0752-750,000 btu and 2 lochnivar hw heaters-pfn0502-500,000 btu installed w/o work permits. pull proper permits and bring boielrs and boielr room up to code.
Sep 6, 2013 · Penalty $800
Resolve - Non-hazardous
Cease use-52i11.14b01,84x10,40t07,60t07,10h11,10m07,10d06,17h11,17d06 .52i-breaks in governor rope-replace.14b-car mirror located on wrong side of cab.84x-car communications inoperative.40t-motor room door unla
Jan 11, 2008 · Penalty $800
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy: file an
Nov 30, 2001 · Penalty $10,000
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r c n y 32-03b(5) indicating correction of hazardous condtions described in initial ll11/98 report remedy file an amen
Aug 31, 2001 · Penalty $400
Resolve - Hazardous
Failure to maintain exterior bldg wall.noted:spalled bricks e,n and west facades.pieces falling off bricks spalled,cracked and moving out at corners of chimney at north facade.remedy:maintain exterior bldg wall
Feb 21, 2001 · Penalty $800
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5),indicating correctionof hazardous conditions described in initial ll10/80 report.remedy:file an ame
Oct 18, 2000 · Penalty $2,500
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant ro rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an a
Jul 14, 2000 · Penalty $400
Resolve - Non-hazardous
Failure to maintain exterior building wall. noted at north elevation 6 floor buff colored brick masonry spalled, spalling & cracked variouslocations. remedy: provide all proper protection and permits remove al
Apr 26, 2000 · Penalty $2,500
Resolve - Non-hazardous
28b,25b,3d. eliminate excess to motion of car closed (car guides). eliminate excess car door (close pressur) provide from cab.
Jan 3, 2000 · Penalty $350
Resolve - Non-hazardous
15l11,46k10,46h12,46b15,51l11. 15-not self closing 4,5 & 6. 51-gear landed.
Oct 15, 1999 · Penalty $180
Resolve - Non-hazardous
73u,75u,37#,install new controller without permit
Jul 27, 1994 · Penalty $550
Resolve - Non-hazardous
73x, restore to service so that full inspection can be made by this dept.
Sep 13, 1993
Resolve
Complaints
- Door/window
Door to dumbwaiter
Jul 2, 2026 · Apt 3FTHIR
Close - Electric
No lighting
Jul 2, 2026 · Apt 3FTHIR
Close - Plumbing
Bathtub/shower
Jul 2, 2026 · Apt 3FTHIR
Close - Unsanitary condition
Pests
Jul 2, 2026 · Apt 3FTHIR
Close - Door/window
Door
Jul 2, 2026 · Apt 3FTHIR
Close - Unsanitary condition
Pests
May 30, 2026 · Apt 3F
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt 7B
Close - Heat/hot water
Apartment only
Dec 16, 2024 · Apt 7M
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Dec 8, 2024 · Apt 7M
Close - Heat/hot water
Apartment only
Nov 22, 2024 · Apt 7B
Close - Heat/hot water
Apartment only
Mar 16, 2024 · Apt 7B
Close - Plumbing
Bathtub/shower
Mar 9, 2023 · Apt 7B
Close - Heat/hot water
Apartment only
Feb 5, 2023 · Apt 2F
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt 3L
Close - Plumbing
Bathtub/shower
Jan 31, 2023 · Apt 7B
Close - Heat/hot water
Apartment only
Dec 23, 2022 · Apt 2F
Close - Heat/hot water
Entire building
Dec 20, 2022 · Apt 7B
Close - Heat/hot water
Apartment only
Dec 18, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 15, 2022 · Apt 2F
Close - Heat/hot water
Entire building
Dec 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 12, 2022 · Apt 2F
Close - Heat/hot water
Entire building
Dec 12, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 11, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 10, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 9, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 4, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 2, 2022 · Apt 2F
Close - Heat/hot water
Entire building
Nov 20, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 17, 2022 · Apt 6A
Close - Heat/hot water
Apartment only
Nov 13, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Oct 20, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Oct 19, 2022 · Apt 2F
Close - Unsanitary condition
Pests
Jun 13, 2022 · Apt 1C
Close - Heat/hot water
Entire building
Jan 29, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 7, 2022 · Apt 7E
Close - Heat/hot water
Entire building
Nov 6, 2021 · Apt 7B
Close - Heat/hot water
Entire building
Jan 10, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 9, 2021 · Apt 7B
Close - Heat/hot water
Entire building
Jan 9, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 19, 2020 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Jun 26, 2020 · Apt BLDG
Close - Unsanitary condition
Mold
May 27, 2020 · Apt 1C
Close - Safety
Carbon monoxide detector
May 27, 2020 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 1989
- Floors
- 7
- Residential units
- 80
- Building area
- 54,779 ft²
- Lot area
- 22,553 ft²
- Zoning
- R8A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1944 / 36
- Assessed value
- $4,117,500
- Landmark / historic district
- No
HPD registration #140757, last renewed Oct 24, 2025.
Questions about 2177 Fredrick Douglass Bl
Who owns 2177 Fredrick Douglass Bl?
The owner of record in NYC Department of City Planning PLUTO data is Canaan Baptist Hsg Etal.
Does 2177 Fredrick Douglass Bl have violations?
Yes. NYC HPD has recorded 50 housing violations at this property.
Is 2177 Fredrick Douglass Bl rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2177 Fredrick Douglass Bl built?
City records list 1989 as the year it was built.
How many apartments are in 2177 Fredrick Douglass Bl?
It has 80 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.