243 West 135 Street
Manhattan, NY 10030BBL 1-01941-0007Map
Owner of record: Rh 243 West 135 Street LLC
243 West 135 Street is a walk-up apartment building built in 1910 in Manhattan, 10030. It has 6 residential units across 5 floors. The owner of record is Rh 243 West 135 Street LLC. HPD has recorded 100 housing violations here, most recently on September 24, 2026. 46 of the 50 most recent violations are still open.
- HPD violations
- 100
- DOB violations
- 7
- ECB violations
- 2
- HPD complaints
- 269
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 100
- BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north located at apt 5a, 5th story, 1st apartment from north at east
Sep 24, 2026 · Apt 5A
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the cleanse the floors in all public halls
Sep 24, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Sep 24, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of gas powered scooter at public hall, 5th story
Sep 24, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall at public hall, 5th story
Sep 24, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 5th story
Sep 24, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 5th story
Sep 24, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at public hall, 1st story
Sep 24, 2026
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Sep 24, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Replace the broken or defective water closet in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Sep 24, 2026 · Apt 5A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective bell buzzer and return intercom system at building front to panel at east wall in the private hallway located at apt 5a, 5th story, 1st apartment from north at east
Sep 24, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective water supply pipe at sink in the kitchen located at apt 5a, 5th story, 1st apartment from north at east
Sep 24, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Sep 24, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 1st room from north located at apt 5a, 5th story, 1st apartment from north at east
Sep 24, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 5a, 5th story, 1st apartment from north at east
Sep 24, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall. at public hall, 5th story
Sep 9, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door , 1st story
Sep 9, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department east wall and ceiling at public hall, 5th story
Sep 9, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling. at public hall, 5th story
Sep 9, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 5a, 5th story, 1st apartment from north at east
Sep 9, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 5a, 5th story, 1st apartment from north at east
Sep 9, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Sep 9, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble treads, 1st, 2nd, 3rd and 5th from the bottom. the damage is not affecting egress. at public hall stairs, 1st story
Aug 28, 2026
Open — Nov sent out - BHazardous
Replace the broken or defective water closet in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Aug 28, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall at public hall, 5th story
Aug 28, 2026
Open — Nov sent out - BHazardous
Replace with new the missing wire mesh at skylight at bulkhead to roof
Aug 28, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty lock at door in the entrance to building , 1st story
Aug 28, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 5th story
Aug 28, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 5th story
Aug 28, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 5th story
Aug 28, 2026
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Aug 28, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Replace with new the missing glass pane at bulkhead skylight
Aug 28, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell and buzzar intercom system from the building entrance to the east wall panel in the foyer located at apt 5a, 5th story, 1st apartment from north at east
Aug 28, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at bulkhead , 5th story
Jul 14, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective 10th marble tread, from bottom up at bulkhead stairs , 5th story
Jul 14, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and assemblies at bulkhead door , 5th story
Jul 14, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and its assemblies at building entrance door , 1st story
Jul 14, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story
Jul 14, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from north at east
Jun 6, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell/buzzer/intercom system from building entrance to panel at east wall in the private hallway located at apt 5a, 5th story, 1st apartment from north at east
Jun 6, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from north at east
Jun 6, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door , 1st story
Jun 6, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door , 1st story
Jun 6, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above ceiling in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from north at east
Jun 6, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from north located at apt 5a, 5th story, 1st apartment from north at east
Apr 29, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom bell buzzer system from building entrance to east wall in foyer in the foyer located at apt 5a, 5th story, 1st apartment from north at east
Apr 29, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east
Mar 30, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood doors at wall cabinet at north in the kitchen located at apt 5a, 5th story, 1st apartment from north at east
Mar 30, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at the ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Mar 30, 2026 · Apt 5A
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door
Mar 30, 2026
Closed — Violation closed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 2
- Class - 2
Failure to maintain bldg in a code compliant manner. defects noted: attime of inspection all window a/c units at front of bldg are not properly supported w/brackets. a/c units are propped up w/pieces of wood &
Jun 26, 2013 · Penalty $2,500
Resolve - Non-hazardous
Failure to provide approved plans at time of insp work noted alt 1 interior renovation in scope of #103532928 railroad unit division's locations (1)2nd fl to fifth fl north to south.remedy:approved plans all ti
May 12, 2004 · Penalty $250
Resolve
Complaints
- General
Bell/buzzer/intercom
Sep 15, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Sep 15, 2026 · Apt ENTRAN
Close - Flooring/stairs
Stairs
Sep 15, 2026 · Apt ENTRAN
Close - Door/window
Door
Sep 15, 2026 · Apt ENTRAN
Close - Plumbing
Toilet
Sep 15, 2026 · Apt 5A
Close - Plumbing
Toilet
Sep 15, 2026 · Apt 5A
Close - Flooring/stairs
Floor
Sep 15, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Sep 15, 2026 · Apt 5A
Close - Water leak
Heavy flow
Sep 15, 2026 · Apt 5A
Close - Unsanitary condition
Mold
Sep 15, 2026 · Apt 5A
Close
Show 40 more ↓
- Plumbing
Basin/sink
Sep 15, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Sep 15, 2026 · Apt ENTRAN
Close - Unsanitary condition
Mold
Sep 15, 2026 · Apt ENTRAN
Close - Water leak
Heavy flow
Sep 2, 2026 · Apt 5A
Close - Door/window
Door
Aug 25, 2026 · Apt 5A
Close - Flooring/stairs
Stairs
Aug 25, 2026 · Apt 5A
Close - Plumbing
Toilet
Aug 25, 2026 · Apt 5A
Close - Water leak
Heavy flow
Aug 25, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Aug 25, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Jun 1, 2026 · Apt 5A
Close - Water leak
Slow leak
Jun 1, 2026 · Apt 5A
Close - Door/window
Door
Jun 1, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Jun 1, 2026 · Apt 5A
Close - General
Cabinet
Jun 1, 2026 · Apt 5A
Close - Unsanitary condition
Mold
Jun 1, 2026 · Apt 5A
Close - Water leak
Heavy flow
Jun 1, 2026 · Apt 5A
Close - Water leak
Heavy flow
Apr 25, 2026 · Apt 5A
Close - Electric
Lighting
Apr 25, 2026 · Apt 5A
Close - Door/window
Door
Apr 25, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Apr 25, 2026 · Apt 5A
Close - Water leak
Slow leak
Apr 25, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Apr 25, 2026 · Apt 5A
Close - Water leak
Heavy flow
Apr 25, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Mar 26, 2026 · Apt 5A
Close - Door/window
Window frame
Mar 26, 2026 · Apt 5A
Close - Unsanitary condition
Mold
Mar 26, 2026 · Apt 5A
Close - Plumbing
Water supply
Mar 26, 2026 · Apt 5A
Close - Water leak
Damp spot
Mar 26, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Mar 26, 2026 · Apt 5A
Close - Plumbing
Toilet
Mar 26, 2026 · Apt 5A
Close - Safety
Smoke detector
Mar 26, 2026 · Apt 5A
Close - Door/window
Door
Mar 26, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Mar 26, 2026 · Apt 5A
Close - General
Cabinet
Mar 26, 2026 · Apt 5A
Close - Safety
Carbon monoxide detector
Mar 26, 2026 · Apt 5A
Close - Paint/plaster
Wall
Nov 18, 2025 · Apt 3A
Close - General
Bell/buzzer/intercom
Nov 18, 2025 · Apt 3A
Close - Plumbing
Basin/sink
Nov 18, 2025 · Apt 3A
Close - Door/window
Door
Nov 14, 2025 · Apt 5A
Close - Water leak
Heavy flow
Nov 14, 2025 · Apt 5A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1910
- Floors
- 5
- Residential units
- 6
- Building area
- 9,695 ft²
- Lot area
- 2,498 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1941 / 7
- Assessed value
- $704,250
- Landmark / historic district
- No
HPD registration #119176, last renewed Jun 11, 2025.
Questions about 243 West 135 Street
Who owns 243 West 135 Street?
The owner of record in NYC Department of City Planning PLUTO data is Rh 243 West 135 Street LLC.
Does 243 West 135 Street have violations?
Yes. NYC HPD has recorded 100 housing violations at this property.
Is 243 West 135 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 243 West 135 Street built?
City records list 1910 as the year it was built.
How many apartments are in 243 West 135 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.