roofy

2301 Adam C Powell Blvd

Manhattan, NY 10030BBL 1-01920-0001Map

Owner of record: 2301 7th Ave HDFC

2301 Adam C Powell Blvd is a walk-up apartment building built in 1910 in Manhattan, 10030. It has 5 residential units across 5 floors. The owner of record is 2301 7th Ave HDFC. HPD has recorded 105 housing violations here, most recently on April 29, 2026. 35 of the 50 most recent violations are still open.

HPD violations
105
DOB violations
19
ECB violations
3
HPD complaints
146

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 105

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 5th story, 1st apartment from east at south

    Jan 13, 2025 · Apt 5

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5, 5th story, 1st apartment from east at south

    Jan 13, 2025 · Apt 5

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5, 5th story, 1st apartment from east at south

    Jan 13, 2025 · Apt 5

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Jan 13, 2025

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5, 5th story, 1st apartment from east at south

    Jan 13, 2025 · Apt 5

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 5, 5th story, 1st apartment from east at south

    Jan 13, 2025 · Apt 5

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
Show 40 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 4, 4th story, 1st apartment from east at south

    Mar 31, 2018 · Apt 4

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 4, 4th story, 1st apartment from east at south

    Mar 31, 2018 · Apt 4

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4, 4th story, 1st apartment from east at south

    Mar 31, 2018 · Apt 4

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east located at apt 4, 4th story, 1st apartment from east at south

    Mar 31, 2018 · Apt 4

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system , locked trap door located at west 139 street,

    Mar 13, 2018

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from east at south

    Mar 13, 2018 · Apt 4

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the private hallway located at apt 4, 4th story, 1st apartment from east at south

    Feb 16, 2018 · Apt 4

    Open — Nov sent out
  • A

    Properly repair the broken or defective building bell buzzer answer and return system at north wall in the private hallway located at apt 4, 4th story, 1st apartment from east at south

    Feb 16, 2018 · Apt 4

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4, 4th story, 1st apartment from east at south

    Feb 16, 2018 · Apt 4

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 4, 4th story, 1st apartment from east at south

    Feb 16, 2018 · Apt 4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective treads and risers leaning towards outer stringers at 2nd, 3rd, 4th and 5th stories, at public hall stairs

    Nov 26, 2017

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 26, 2017

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the 2nd bathroom from east at north located at apt 4, 4th story, 1st apartment from east at south

    Nov 26, 2017 · Apt 4

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, ceiling in the 1st room from east at south located at apt 4, 4th story, 1st apartment from east at south

    Nov 26, 2017 · Apt 4

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the 1st room from east at south located at apt 4, 4th story, 1st apartment from east at south

    Nov 26, 2017 · Apt 4

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 4, 4th story, 1st apartment from east at south

    Nov 26, 2017 · Apt 4

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd bathroom from east at north located at apt 4, 4th story, 1st apartment from east at south

    Nov 26, 2017 · Apt 4

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 13; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4, 4th story, 1st apartment from east at south

    Nov 26, 2017 · Apt 4

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of scalding hot water at 155 degrees at fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from east at south

    Nov 26, 2017 · Apt 4

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door from west at north wall, 1st door frame from west at north wall in the 1st room from east at south located at apt 4, 4th story, 1st apartment from east at south

    Nov 26, 2017 · Apt 4

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Nov 26, 2017

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box , sign missing, at public hall, 1st story

    Nov 26, 2017

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , frame missing, at public hall, 1st story

    Nov 26, 2017

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system , sign missing , at public hall, 1st story

    Nov 26, 2017

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 26, 2017

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 3rd room from east located at apt 4, 4th story, 1st apartment from east at south

    Nov 26, 2017 · Apt 4

    Open — Nov sent out
  • A

    Properly repair the broken or defective lock to mailbox for apt 3 at vestibule.

    Apr 11, 2017

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls. , 1st story

    Apr 11, 2017

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceiling and all walls in vestibule with fire rated materials. , 1st story

    Apr 11, 2017

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at vestibule. , 1st story

    Mar 16, 2017

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective unkeyed cement plastere ceiling in vestibule , 1st story

    Mar 16, 2017

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling at vestibule , 1st story

    Mar 16, 2017

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2016

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Oct 16, 2015

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story

    Oct 16, 2015

    Open — Nov sent out

DOB building violations · 19

  • Construction other optional

    Large sections of brownstone have deteriorated and missing from upper level a facade in between the third and fourth floor. at exposure 1 and 4 of corn a lot building. there are also sections of spalling brownstone at various locations on both exposure. creating a hazardous condition for pedestrians using public walkway.

    Apr 2, 2026

    Dob violation - active
  • Immediate emergency anythingoptional

    Provide approximately 100 linear feet of sidewalk shed. install approximately 70 linear feet along exposure #4 and wrap to exposure #1 with approximately 30 linear feet

    Apr 2, 2026

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
Show 9 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - active

ECB violations · 3

  • Class - 1

    At exposure #1 the sill at the 3rd and 4th floor is crumbling and in a state of disrepair with pieces that have fallen off., repair and/replace

    Apr 1, 2026 · Penalty $12,500

    Active
  • Class - 2

    Failure to maintain bldg in code compliant manner.masterbedrm between 1st & 2nd flr crack & defective between 2nd & 5th flr. newel post, bannisters & ballustrades in state of disrepair.remedy:repair/&/or replac

    Sep 13, 2011 · Penalty $500

    Active
  • Hazardous

    Required means of egress obstructed noted in cellar a second inside door locked obstructing secondary means of egress to rear yard remedy remove obstruction immediatly

    Jun 28, 2002 · Penalty $2,500

    Active

Complaints

  • Unsanitary condition

    Pests

    Jul 13, 2026 · Apt PUBLIC

    Close
  • Electric

    Power outage

    May 26, 2025 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2025 · Apt 5

    Close
  • Appliance

    Electric/gas range

    Oct 15, 2018 · Apt 5B

    Close
  • General

    Mailbox

    May 9, 2018 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Apr 30, 2018 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Apr 20, 2018 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Apr 18, 2018 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2018 · Apt 2

    Close
Show 40 more ↓
  • Water leak

    Slow leak

    Mar 17, 2018 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2018 · Apt 4

    Close
  • General

    Bell/buzzer/intercom

    Feb 11, 2018 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Feb 11, 2018 · Apt 4

    Close
  • Paint/plaster

    Radiator

    Feb 7, 2018 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2018 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Nov 25, 2017 · Apt 4

    Close
  • Unsanitary condition

    Pests

    Nov 25, 2017 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Nov 25, 2017 · Apt 4

    Close
  • Plumbing

    Radiator

    Nov 25, 2017 · Apt 4

    Close
  • Water leak

    Heavy flow

    Nov 25, 2017 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2017 · Apt 2

    Close
  • Heat/hot water

    Entire building

    May 31, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2016 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2016 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Oct 15, 2015 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2015 · Apt BLDG

    Close
  • Heating

    Heat related

    Apr 26, 2013 · Apt 4

    Close
  • Paint/plaster

    Wall

    Sep 30, 2011 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Sep 30, 2011 · Apt 5

    Close
  • Plumbing

    Water-leaks

    Sep 30, 2011 · Apt 5

    Close
  • Plumbing

    Water-leaks

    Sep 30, 2011 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Sep 30, 2011 · Apt 5

    Close
  • Electric

    Lighting

    Sep 30, 2011 · Apt 5

    Close
  • Electric

    Lighting

    Sep 30, 2011 · Apt 5

    Close
  • Electric

    Wiring

    Sep 30, 2011 · Apt 5

    Close
  • Plumbing

    Water-leaks

    Sep 30, 2011 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Sep 30, 2011 · Apt 5

    Close
  • Plumbing

    Water-leaks

    Sep 30, 2011 · Apt 5

    Close
  • General

    Stairs

    Sep 30, 2011 · Apt 5

    Close
  • Plumbing

    Water-leaks

    Sep 30, 2011 · Apt 5

    Close
  • Construction

    Roof

    Sep 30, 2011 · Apt 5

    Close
  • Plumbing

    Toilet

    Sep 13, 2011 · Apt 4

    Close
  • Heating

    Heat related

    Mar 28, 2011 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 26, 2011 · Apt 3

    Close
  • General

    Doors

    Feb 14, 2011 · Apt 3

    Close
  • General

    Doors

    Feb 14, 2011 · Apt 3

    Close
  • Electric

    Wiring

    Aug 30, 2010 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Aug 30, 2010 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1910
Floors
5
Residential units
5
Building area
8,006 ft²
Lot area
1,906 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
1920 / 1
Assessed value
$356,850
Landmark / historic district
No

HPD registration #130517, last renewed Dec 8, 2025.

Questions about 2301 Adam C Powell Blvd

Who owns 2301 Adam C Powell Blvd?

The owner of record in NYC Department of City Planning PLUTO data is 2301 7th Ave HDFC.

Does 2301 Adam C Powell Blvd have violations?

Yes. NYC HPD has recorded 105 housing violations at this property.

Is 2301 Adam C Powell Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2301 Adam C Powell Blvd built?

City records list 1910 as the year it was built.

How many apartments are in 2301 Adam C Powell Blvd?

It has 5 residential units and 8 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.