129 West 129 Street
Manhattan, NY 10027BBL 1-01914-0020Map
Owner of record: Lasoeur Brownstones, LLC
129 West 129 Street is a walk-up apartment building built in 1910 in Manhattan, 10027. It has 4 residential units across 4 floors. The owner of record is Lasoeur Brownstones, LLC. HPD has recorded 169 housing violations here, most recently on November 3, 2025. 9 of the 50 most recent violations are still open.
- HPD violations
- 169
- DOB violations
- 12
- ECB violations
- 2
- HPD complaints
- 15
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 169
- CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures ... in the entire apartment located at apt 4, 4th story, 1st apartment from west at north
Nov 3, 2025 · Apt 4
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from west at north
Nov 3, 2025 · Apt 4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4, 4th story, 1st apartment from west at north
Nov 3, 2025 · Apt 4
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above the ceiling in the 1st room from north located at apt 4, 4th story, 1st apartment from west at north
Nov 3, 2025 · Apt 4
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, 1st story
Nov 3, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 4, 5th story, 1st apartment from north at east
Oct 27, 2025 · Apt 4
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures no electrical power at all outlets at all walls and ceiling in entire apartment in the entire apartment located at apt 4, 5th story, 1st apartment from north at east
Oct 27, 2025 · Apt 4
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 4, 5th story, 1st apartment from north at east
Oct 27, 2025 · Apt 4
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at apt 4, 4th story, 1st apartment from north at east
Oct 20, 2025 · Apt 4
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 2, 2015
Closed — Violation dismissed - ANon-hazardous
File with this department a registration statement for building.
May 2, 2001
Closed — Violation dismissed - ANon-hazardous
Paint or post a sign indicating floors wall at all stys public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass pane at west side of entrance 1 sty public hall vestibule.
Apr 21, 1999
Closed — Violation dismissed - ANon-hazardous
Provide and maintain a light directly over the mail boxes in public hall 1 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination vestibule 1 sty public hall.
Apr 21, 1999
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall and on boiler room door.
Apr 21, 1999
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls ceiling and trim thru out 2 sty east apt 2b. located at apt 2b
Apr 21, 1999 · Apt 2B
Closed — Violation closed - BHazardous
Replace with new the broken or defective hot water shut off valve 2 sty east apt 2b bathroom. located at apt 2b
Apr 21, 1999 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in bathroom 2 sty east apt 2b. located at apt 2b
Apr 21, 1999 · Apt 2B
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate arround steam riser in bathroom.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile bathtub 2 sty east apt 2b bathroom located at apt 2b
Apr 21, 1999 · Apt 2B
Closed — Violation closed - BHazardous
Replace with new the broken or defective defective faucet at bathtub 2 sty east apt 2b bathroom. located at apt 2b
Apr 21, 1999 · Apt 2B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing 2 sty east apt 2b sangare. located at apt 2b
Apr 21, 1999 · Apt 2B
Closed — Violation closed - BHazardous
Replace with new the broken or defective entrance door and frame 2 sty east apt 2b. located at apt 2b
Apr 21, 1999 · Apt 2B
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination 4 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Replace with new the broken or defective facia board at scuttle to roof.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly secure the loose scuttle ladder to roof.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective south north nd west walls scuttle 4 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Replace with new the broken or defective approve wire screen above skylight at roof.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarding north and east walls 4 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly secure the loose handrail 3 to 4 sty public hall stairs.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 10 11 and 12 wood riser and tread 3 to 4 sty public hall stairs.
Apr 21, 1999
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the stairs landing and floor at all stys public hall.
Apr 21, 1999
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls ceiling and soffit of public hall all stys.
Apr 21, 1999
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of exposed electrical wire east wall 3 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 12 wood riser and tread up 2 sty to 3 sty public hall stairs.
Apr 21, 1999
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of east wall exposed electrical wire 2 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarding west and south walls 2 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor 2 sty public hall.
Apr 21, 1999
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective 2 9 12 and 14 marble tread 1 to 2 sty public hall stairs.
Apr 21, 1999
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of exposed electrical wire south wall 1 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Replace with new the broken or defective vestibule door to 1 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of washing mashine and bed frame and free standing radiator 1 sty public hall.
Apr 21, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarding ceiling east and west walls 1 sty public hall.
Apr 21, 1999
Closed — Violation closed
DOB building violations · 12
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 2
- Class - 2
Occupancy contrary to that allowed by the certificte of occupancy or bldg dept records. note: the certificate of occupancy #104077507f indicates class a aprt on each floor, at time of inspection class a apt on
Sep 2, 2014 · Penalty $1,200
Active - Non-hazardous
Failure to maintain building: in that (a)cracks exist in hallway interior walls east & west. (b)1st flr stairway to 2nd floor has been deteriorating due to age. (c)exterior wall bricks exposed due to plaster
Jul 29, 1998 · Penalty $2,500
Resolve
Complaints
- Electric
Power outage
Nov 3, 2025 · Apt 4
Close - Appliance
Electric/gas range
Nov 3, 2025 · Apt 4
Close - Heat/hot water
Apartment only
Nov 3, 2025 · Apt 4
Close - Water leak
Slow leak
Nov 3, 2025 · Apt 4
Close - Door/window
Door
Nov 3, 2025 · Apt 4
Close - General
Mailbox
Nov 3, 2025 · Apt 4
Close - Heat/hot water
Apartment only
Oct 28, 2025 · Apt 4
Close - Appliance
Electric/gas range
Oct 25, 2025 · Apt 4
Open - Heat/hot water
Apartment only
Oct 25, 2025 · Apt 4
Open - Electric
Power outage
Oct 24, 2025 · Apt 4
Close
Show 5 more ↓
- Electric
Power outage
Oct 20, 2025 · Apt 4
Close - Unsanitary condition
Sewage
Jan 4, 2016 · Apt 1
Close - Plumbing
Bathtub/shower
Jan 4, 2016 · Apt 1
Close - Appliance
Refrigerator
Jan 4, 2016 · Apt 1
Close - Door/window
Window frame
Jan 4, 2016 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1910
- Floors
- 4
- Residential units
- 4
- Building area
- 6,000 ft²
- Lot area
- 2,498 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1914 / 20
- Assessed value
- $436,050
- Landmark / historic district
- No
HPD registration #134294, last renewed Apr 9, 2026.
Questions about 129 West 129 Street
Who owns 129 West 129 Street?
The owner of record in NYC Department of City Planning PLUTO data is Lasoeur Brownstones, LLC.
Does 129 West 129 Street have violations?
Yes. NYC HPD has recorded 169 housing violations at this property.
Is 129 West 129 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 129 West 129 Street built?
City records list 1910 as the year it was built.
How many apartments are in 129 West 129 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.