roofy

2075 Fredrick Douglass Bl

Manhattan, NY 10026BBL 1-01847-0021Map

Owner of record: Selk Hsg Dvlp Fd Coinc

2075 Fredrick Douglass Bl is an elevator apartment building built in 1988 in Manhattan, 10026. It has 82 residential units across 9 floors. The owner of record is Selk Hsg Dvlp Fd Coinc. HPD has recorded 145 housing violations here, most recently on October 14, 2026. 46 of the 50 most recent violations are still open.

HPD violations
145
DOB violations
53
ECB violations
8
HPD complaints
247

What to know

Concern
11 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 145

  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 4th apartment from south at west

    Oct 14, 2026 · Apt 3B

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 4th apartment from south at west

    Oct 14, 2026 · Apt 3B

    Open — Notice of issuance sent to tenant
  • A

    Properly repair or replace the broken or defective base cabinet at south in the kitchen located at apt 3b, 3rd story, 4th apartment from south at west

    Oct 14, 2026 · Apt 3B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6c, 6th story, 1st apartment from north at east

    Sep 29, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6c, 6th story, 1st apartment from north at east

    Sep 29, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 30 square feet at south wall in the bathroom located at apt 6c, 6th story, 1st apartment from north at east

    Sep 29, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and west wall in the 1st room from north located at apt 6c, 6th story, 1st apartment from north at east

    Sep 29, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at west south east walls inside closet and closet door in the 1st room from north located at apt 6c, 6th story, 1st apartment from north at east

    Sep 29, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft inside closet at east wall in the 1st room from north at east located at apt 6c, 6th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at south wall in the bathroom located at apt 6c, 6th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • C

    Properly repair or replace the broken or defective glass pane at upper window sash at west wall. in the 1st room from north at west located at apt 6b, 6th story, 4th apartment from south at west

    Sep 12, 2026 · Apt 6B

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective counter balance spring at lower sash window on north wall. in the 1st room from north at west located at apt 6b, 6th story, 4th apartment from south at west

    Sep 12, 2026 · Apt 6B

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6b, 6th story, 4th apartment from south at west

    Sep 12, 2026 · Apt 6B

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6b, 6th story, 4th apartment from south at west

    Sep 12, 2026 · Apt 6B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroom located at apt 6b, 6th story, 4th apartment from south at west

    Sep 12, 2026 · Apt 6B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 6b, 6th story, 4th apartment from west at north

    Sep 6, 2026 · Apt 6B

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6b, 6th story, 4th apartment from west at north

    Sep 6, 2026 · Apt 6B

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6b, 6th story, 4th apartment from west at north

    Sep 6, 2026 · Apt 6B

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6b, 6th story, 1st apartment from west at north

    Sep 1, 2026 · Apt 6B

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 6b, 6th story, 1st apartment from west at north

    Sep 1, 2026 · Apt 6B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south

    Aug 27, 2026 · Apt 6B

    Open — Nov sent out
  • C

    Remove all obstructions and repair all defects in waistline at bathtub in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south

    Aug 27, 2026 · Apt 6B

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6b, 6th story, 3rd apartment from east at south

    Aug 27, 2026 · Apt 6B

    Open — Notice of issuance sent to tenant
  • A

    Properly repair or replace the broken or defective light fixture at north wall in the foyer located at apt 6g, 6th story, 2nd apartment from north at east , section ''south''

    Aug 21, 2026 · Apt 6G

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east , section ''south''

    Aug 21, 2026 · Apt 6G

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entire apartment located at apt 3h, 3rd story, 6th apartment from east at south

    Dec 8, 2025 · Apt 3H

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 square feet at the ceiling, east wall, south wall, and north wall in the bathroom located at apt 6c, 6th story, 1st apartment from north at east

    Oct 24, 2025 · Apt 6C

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 square feet at the ceiling, west wall, and south wall in the 1st room from north at east located at apt 6c, 6th story, 1st apartment from north at east

    Oct 24, 2025 · Apt 6C

    Open — Defect letter issued
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling, west wall and south wall in the 1st room from north at east located at apt 6c, 6th story, 1st apartment from north at east

    Oct 24, 2025 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 1st room from north at east located at apt 6c, 6th story, 1st apartment from north at east

    Oct 24, 2025 · Apt 6C

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the grout in between ceramic wall tiles at south wall in the bathroom located at apt 6c, 6th story, 1st apartment from north at east

    Oct 24, 2025 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroom located at apt 6c, 6th story, 1st apartment from north at east

    Oct 24, 2025 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color thd ceiling in the bathroom located at apt 6b, 6th story, 6th apartment from south at west

    Oct 15, 2025 · Apt 6B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6b, 6th story, 6th apartment from south at west

    Oct 15, 2025 · Apt 6B

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective closet door at west wall in the foyer located at apt 6b, 6th story, 6th apartment from south at west

    Oct 15, 2025 · Apt 6B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallway located at apt 6b, 6th story, 6th apartment from south at west

    Oct 15, 2025 · Apt 6B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchen located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 4th room from north located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Nov sent out
  • B

    Abate the infestation consisting of bedbugs in the entire apartment located at apt 3b, 3rd story, 4th apartment from south at west

    Aug 22, 2025 · Apt 3B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 2nd room from north located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the foyer located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wooden sliding closet doors in the foyer located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroom located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective wooden sliding closet doors in the 2nd room from north located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Open — Nov sent out
  • C

    Remove all obstructions from water closet in the bathroom located at apt 6b, 6th story, 4th apartment from south at west

    Aug 22, 2025 · Apt 6B

    Closed — Violation dismissed

DOB building violations · 53

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
Show 40 more ↓
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Apr 17, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 15, 2017

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Apr 25, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 1, 2015

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 23, 2013

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 15, 2012

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 30, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 30, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 11, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 11, 2010

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 2, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 2, 2009

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2007

    Dob violation - resolved
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Jun 25, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 21, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 21, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 5, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 5, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p36364

    Mar 29, 1999

    Dob violation - resolved

ECB violations · 8

  • Class - 2

    Failure to maintain exterior of building facade and appurtenances.noteexposure #1 front. east elevation crack/spalled coping stone at parapet level and damaged fence at parapet.these condition observing 6th&8th

    Sep 23, 2019 · Penalty $625

    Resolve
  • Class - 2

    50 50a 50-boiler leaking water left rear bottom 50a-fresh air loover fuseable link fired ampon defective

    Oct 5, 2011 · Penalty $250

    Resolve
  • Class - 2

    50 boilert leaking water left rear bottom

    Oct 5, 2011 · Penalty $250

    Resolve
  • Class - 2

    50 hwh safety valve right side incorrect

    Oct 5, 2011 · Penalty $250

    Resolve
  • Non-hazardous

    86bb05.55y13.84x10.10h11.41g11.60t07.59q03.17h11.17d00.38q03.38x10.64x10.64q03.71q03.74b14.16i10. 86bb exp. 2yr tag 55y seal all leaks 84 x car communications inoperative10h worn car door gibs 41g over rated fu

    Feb 25, 2008

    Resolve
  • Non-hazardous

    86bb05.60t07.41g11.41m0784x10.64q03.71q03.74b1417h11.17d06. 86bb exp. 2yr tag 60t provide current cd info 41g over rated fuses 41m nyc device# missing 84x car communications inoperative 64,71q provide guards

    Feb 25, 2008

    Resolve
  • Non-hazardous

    83p16/.83p16-found elevator shutdown at this time restore to service.

    Jul 16, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    46b15,46- shorten hoist cables

    Feb 5, 2000

    Resolve

Complaints

  • Plumbing

    Basin/sink

    Oct 20, 2026 · Apt 6B

    Open
  • Unsanitary condition

    Pests

    Oct 20, 2026 · Apt 6B

    Open
  • Water leak

    Slow leak

    Oct 20, 2026 · Apt 6B

    Open
  • Unsanitary condition

    Pests

    Oct 20, 2026 · Apt 6B

    Open
  • Plumbing

    Bathtub/shower

    Oct 20, 2026 · Apt 6B

    Open
  • Unsanitary condition

    Pests

    Sep 30, 2026 · Apt 3B

    Close
  • Plumbing

    Toilet

    Sep 30, 2026 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Sep 30, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Sep 30, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Mold

    Sep 27, 2026 · Apt 6C

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Sep 23, 2026 · Apt 6C

    Close
  • Paint/plaster

    Ceiling

    Sep 11, 2026 · Apt 6B

    Close
  • Door/window

    Window pane

    Sep 11, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Mold

    Sep 11, 2026 · Apt 6B

    Close
  • Plumbing

    Bathtub/shower

    Sep 11, 2026 · Apt 6B

    Close
  • Water leak

    Slow leak

    Sep 11, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Sep 11, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Sep 7, 2026 · Apt 6B

    Close
  • Water leak

    Slow leak

    Sep 7, 2026 · Apt 6B

    Close
  • Plumbing

    Basin/sink

    Sep 7, 2026 · Apt 6B

    Close
  • Door/window

    Window frame

    Sep 2, 2026 · Apt 6B

    Close
  • Plumbing

    Bathtub/shower

    Sep 2, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Sep 2, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Sep 2, 2026 · Apt 6B

    Close
  • Water leak

    Slow leak

    Sep 2, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Aug 28, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Aug 28, 2026 · Apt 6B

    Close
  • Plumbing

    Bathtub/shower

    Aug 28, 2026 · Apt 6B

    Close
  • Plumbing

    Toilet

    Aug 24, 2026 · Apt 6B

    Close
  • Water leak

    Slow leak

    Aug 24, 2026 · Apt 6B

    Close
  • Plumbing

    Bathtub/shower

    Aug 24, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Aug 24, 2026 · Apt 6B

    Close
  • Plumbing

    Basin/sink

    Aug 12, 2026 · Apt 6G

    Close
  • Plumbing

    Basin/sink

    Jul 16, 2026 · Apt 3J

    Close
  • Plumbing

    Bathtub/shower

    Jul 6, 2026 · Apt 3J

    Close
  • Door/window

    Door

    Jul 6, 2026 · Apt 3J

    Close
  • Plumbing

    Toilet

    May 30, 2026 · Apt 3J

    Close
  • Plumbing

    Bathtub/shower

    May 30, 2026 · Apt 3J

    Close
  • Plumbing

    Bathtub/shower

    May 21, 2026 · Apt 4C

    Close
  • Electric

    Power outage

    May 21, 2026 · Apt 4C

    Close
  • Paint/plaster

    Wall

    May 21, 2026 · Apt 4C

    Close
  • Plumbing

    Toilet

    May 21, 2026 · Apt 4C

    Close
  • Heat/hot water

    Entire building

    May 18, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    May 17, 2026 · Apt 11C

    Close
  • Appliance

    Electric/gas range

    Feb 19, 2026 · Apt 3A

    Close
  • Appliance

    Electric/gas range

    Feb 19, 2026 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt CB

    Close
  • Heat/hot water

    Apartment only

    Dec 28, 2025 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2025 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1988
Floors
9
Residential units
82
Building area
54,675 ft²
Lot area
20,296 ft²
Zoning
R8A
Community board
110
Council district
9
Block / lot
1847 / 21
Assessed value
$3,249,000
Landmark / historic district
No

HPD registration #141145, last renewed Feb 2, 2026.

Questions about 2075 Fredrick Douglass Bl

Who owns 2075 Fredrick Douglass Bl?

The owner of record in NYC Department of City Planning PLUTO data is Selk Hsg Dvlp Fd Coinc.

Does 2075 Fredrick Douglass Bl have violations?

Yes. NYC HPD has recorded 145 housing violations at this property.

Is 2075 Fredrick Douglass Bl rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2075 Fredrick Douglass Bl built?

City records list 1988 as the year it was built.

How many apartments are in 2075 Fredrick Douglass Bl?

It has 82 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.