2098 Fredrick Douglass Bl is a condominium built in 1900 in Manhattan, 10026. It has 88 residential units across 11 floors. The owner of record is The Gateway Condominium. HPD has recorded 1 housing violation here, most recently on December 19, 2011. 1 of the 1 most recent violations are still open.
- HPD violations
- 1
- DOB violations
- 24
- ECB violations
- 33
- HPD complaints
- 51
Available now in this building
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from north at east located at apt 2c, 2nd story, 3rd apartment from north at east
Dec 19, 2011 · Apt 2C
Open — Nov sent out
DOB building violations · 24
- Construction other optional
Emergency work order due to fire escape stair case sliding staircase is missing at exposure 2 north elevations. remedy: immediately provide new sliding staircase qewi should oversee the immediate repairs on the fire escape.conditions and provide report noting the conditions have been resolved
Aug 14, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Oct 31, 2019
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 8, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed
Show 14 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2010
Dob violation - resolved - Construction other optional
Unlawful acts. failure to comply with an order of the commissioner contractor failed to comply with partially rescinded. stop work order which allowed work on standpipe, guardrails, netting & housekeeping observed contractor installing wood floors at floor 4 & 5 remedy: comply with commissions order
Jul 30, 2009
Dob violation - dismissed - Construction other optional
Failure to provide required tenant protection plan when performing con struction work in a building with an occupied dwelling unit noted work on going affects tenants residing at 2098 8 ave remedy: provide dob approved tenatn safety plan submit all plans to sep ex for eng review 212 442-1544/1698
Jul 23, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2006
Dob violation - resolved - Unsafe buildings none
Ub-unsafe buildings none
Nov 15, 2001
V%*-dob violation - dismissed
ECB violations · 33
- Class - 1
Failure to provide unobstructed exit passageway note time of inspection observed no sliding stair chase for exit passageway exposure#2 northelv.rem:remove obstruction.
Aug 14, 2024 · Penalty $3,125
Resolve - Class - 2
Failure to maintain bldg walls & appurtenances. observed multiple cracks on stucco over masonry walls at various locations on exp#3,east elevation in the back courtyard. remedy: maintain bldg walls & appurtenan
Feb 10, 2022 · Penalty $625
Resolve - Class - 2
Bc3314.8.1=failure to install miantin as per code specs at time of inspection in response to complaint #1527642 observed supproted pipe scaffold in place with missing toe boards at the ends at working platforms
Nov 18, 2019
Resolve - Class - 2
Failure to notify the department 72 hours prior to commencement of work, asked the gc for the reference number he called office could not produce reference number. job # 140800346; 3303.10.2, comply with code
Nov 6, 2019
Resolve - Class - 2
Failure to provide inspection access. noted: unable to conduct inspection of roof of building due to access denial by a worker from the building. active permit #123361940 is posted at entrance of building. ,
Apr 19, 2019
Resolve - Class - 2
Failure to provide inspection access. noted: unable to conduct inspection of roof of building due to access denial by a worker from the building. active permit #123361940 is posted at entrance of building, prov
Apr 19, 2019 · Penalty $2,530
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. noted: stop work order in affect for job #123361940 for balcony repairs under violation 39001052j and work in progress at time of inspection on ba
Apr 16, 2019 · Penalty $5,000
Resolve - Class - 1
97x17 restore to service for proper inspection by dob.
Jan 16, 2019
Resolve - Class - 2
Upon inspection no approved department of buildings plans on site for job #123361940., .
Jan 4, 2019 · Penalty $655
Resolve - Class - 2
Failure to maintain exterior building walls and appurtenances.at time of inspection i observed on exposure #1 west elevation spalled,crackederoding window sills on several floor levels.spalled cracked and damag
May 4, 2017
Resolve
Show 23 more ↓
- Class - 2
Failure to maintain exterior bldg walls & appurtenances.@time of insp i observed on exp#1 west elev:-spalled,crack & eroding window sills onseveral fl levels spaked,cracks & damage brick @several fl levels (spa
May 4, 2017 · Penalty $530
Resolve - Class - 1
Partial swo issued for suspended scaffold pursuant 28-207.2 and postedon premises.unqualifed workers performing work on suspended scaffold. noed: at time of inspection following workers:1 santos sevilla and 2 c
Jan 15, 2015 · Penalty $1,600
Resolve - Class - 2
41m07,40l09,100l10,23l10,05l10. 41- signage is missing. 40- old motor room door. 100- remove brace for separate quarters on roof from stwy hand rail going to motor room. 23- call sta mount properly on roof top
Aug 9, 2013
Resolve - Class - 2
Operation of a crane w/o a cert of on site insp rem: have engineer sign ioe to verify crane is set up according to approved plans
Jul 8, 2010 · Penalty $2,400
Resolve - Class - 1
No record of daily inspection of supported scaffold performed by authorized person at site. no record of daily inspection for supported scaffold permits #110331551 & 120100700. remedy: maintain daily records of
Jul 30, 2009 · Penalty $2,400
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. supported scaffold erected under permit #110331551 has levels not planked & more than the approved # of bicycles planked.
Jul 30, 2009 · Penalty $500
Resolve - Class - 1
Use of supported scaffold w/o a scaffold user certificate 3 separate workers observed utilizing supported stair tower (permit #110144031) w/o scaffold user certificate. remedy: discontinue activity or obtain a
Jul 30, 2009 · Penalty $1,600
Resolve - Class - 2
Failure to maintain building in code-complaint manner: lack of system of standpipe system where required per bc 905 & nfpa 14 include buildings under construction. in the building 11 stories in high as per bc
Jul 23, 2009 · Penalty $500
Resolve - Class - 1
Sec bc 3301.2 (misc) 27-1009a misc viol: fail to provide 3'6" guard rail or equivalent around all floor & perimeter openings. noted: work ongoing under alt 1 permit # 103253961 for const of 11 story bldg. cable
Jul 23, 2009 · Penalty $1,600
Resolve - Class - 2
Fail to provide/post sign at jobsite pursuant to subsection. noted: work ongoing under alt 1 permit # 103283961. general contractor & owner contact information is not posted at 8 ave or 114 st. remedy: provid
Jul 23, 2009 · Penalty $800
Resolve - Class - 1
97m07. 97m07 - provide elevator readiness for fireman no work to be done above 75ft.all work should be done below 75ft.
Jul 23, 2009 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner no fire stopping per bc712.3 27-345 noted sheetrock measuring approx 5'x3' missing from ceiling thus exposing wood beams & electrical cable noted location first
Jun 19, 2009 · Penalty $500
Resolve - Class - 2
Work does not conform to approved const documents and or approved amendments tie ins are not according to plan supported scaffold not tie in at exp 3 remedy: conform to approved documents or documents
Apr 30, 2009 · Penalty $500
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. (no shed plans on site). remedy: provide plans.
Mar 26, 2009 · Penalty $250
Resolve - Class - 2
Sidewalk shed does not meet code specs. post has been cut out in some areas. remedy: conform shed to code specs.
Mar 26, 2009 · Penalty $2,400
Resolve - Class - 2
Altered/changed building occupied w/o a valid certificate of occupancy as per 28-118.3.1 - 28-118.3.2. noted: altered building under application #103253952 currently occupied with expired on 10/27/08 temporary
Feb 13, 2009
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations.(sidewalk shed support post to close to trench).remedy:safeguard public & property.
Feb 11, 2009 · Penalty $1,200
Resolve - Class - 2
17h11.100u07.70y13.70m07.17h11 hoist door are worn need to be replaced 100u07 2 yr tag is missing on pump unit provide 70y13 oil leak from pistons need to be sealed and put cleaned 70m07 sump pump in pit
Dec 11, 2008 · Penalty $500
Resolve - Non-hazardous
84x10/84r9/39p16/84p16/66y2/.84x-car communications inoperative.84r-illegle vestibule in bsmt.39p-no motor rm access.84p-no bsmt access.66y-oil in pit.
Dec 19, 2007 · Penalty $180
Resolve - Hazardous
Failure to maintain exterior parapet wall and roof: in that brick parapet wall west facade has eroded so that it is free standing. alsoentire roof is missing-no lateral support; so that both front facade
Sep 29, 1999 · Penalty $800
Resolve - Hazardous
Failure to maintain erertior building wall noted deconative metal cornice loose & missing at parapet level brick parapet missing at west side front facade approx size 20-0 long location parapet level front faca
Nov 27, 1998 · Penalty $2,500
Resolve - Non-hazardous
Occupancy contrary to that allowed by the bldg dept records. noted: cellar occupied as living purposes a bdrm & bath constructed in n/w corner w/ 1 person sleeping within.
Mar 2, 1998 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit. cellar & mezz. noted: partition walls installedmaking a bdrm in cellar & bath connecting. approx size 10'x10' w/ 1 person sleeping within. no window or ventilation.
Mar 2, 1998 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Mar 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Safety
Fire escape
Nov 5, 2023 · Apt BUILDI
Close - Unsanitary condition
Mold
Jan 20, 2023 · Apt 4B
Close - Plumbing
Toilet
Jan 20, 2023 · Apt 4B
Close - Heat/hot water
Entire building
Feb 13, 2016 · Apt 5E
Close - Heat/hot water
Entire building
Apr 3, 2014 · Apt 3E
Close - Electric
Lighting
Dec 9, 2011 · Apt BLDG
Close - General
Floor
Nov 18, 2011 · Apt 2C
Close - Paint/plaster
Wall
Nov 18, 2011 · Apt 2C
Close
Show 40 more ↓
- General
Floor
Aug 8, 2011 · Apt 2C
Close - General
Floor
Aug 8, 2011 · Apt 2C
Close - General
Doors
Aug 8, 2011 · Apt 2C
Close - Paint/plaster
Wall
Aug 8, 2011 · Apt 2C
Close - Plumbing
Water-leaks
Aug 8, 2011 · Apt 2C
Close - General
Floor
Aug 8, 2011 · Apt 2C
Close - Electric
Wiring
Jun 28, 2011 · Apt 2C
Close - General
Floor
Jun 28, 2011 · Apt 2C
Close - General
Floor
Jun 28, 2011 · Apt 2C
Close - Nonconst
Smoke detector
Jun 28, 2011 · Apt 2C
Close - Nonconst
Carbon monoxide
Jun 28, 2011 · Apt 2C
Close - Electric
Wiring
Jun 28, 2011 · Apt 2C
Close - General
Floor
Jun 28, 2011 · Apt 2C
Close - General
Windows
Jun 28, 2011 · Apt 2C
Close - General
Doors
Jun 28, 2011 · Apt 2C
Close - General
Mold
Jun 6, 2011 · Apt 1
Close - General
Mold
Jun 6, 2011 · Apt 1
Close - Plumbing
Water-leaks
Jun 6, 2011 · Apt 1
Close - Nonconst
Vermin
May 1, 2011 · Apt 3H
Close - Heating
Heat related
Jan 24, 2011 · Apt 3H
Close - Heating
Heat related
Jan 15, 2011 · Apt 3H
Close - Heating
Heat related
Dec 22, 2010 · Apt 3H
Close - Heating
Heat related
Mar 3, 2009 · Apt 3F
Close - Heating
Heat related
Jan 8, 2009 · Apt 3F
Close - Electric
Electric-supply
Jan 8, 2009 · Apt 3F
Close - Heating
Heat related
Dec 22, 2008 · Apt 3F
Close - Heating
Heat related
Dec 21, 2008 · Apt 3F
Close - Heating
Heat related
Dec 5, 2008 · Apt 3F
Close - Heating
Heat related
Nov 22, 2008 · Apt 3F
Close - Heating
Heat related
Nov 22, 2008 · Apt 3F
Close - Heating
Heat related
Nov 22, 2008 · Apt 3F
Close - Nonconst
Rubbish
Oct 17, 2007 · Apt 2G
Close - Nonconst
Rubbish
Oct 17, 2007 · Apt 1G
Close - Nonconst
Rubbish
Oct 16, 2007 · Apt NA
Close - Heating
Heat related
Feb 5, 2007 · Apt 2H
Close - Heating
Heat related
Jan 27, 2007 · Apt 2H
Close - Heating
Heat related
Jan 21, 2007 · Apt 2H
Close - Plumbing
Radiator
Jan 21, 2007 · Apt 2H
Close - Heating
Heat related
Nov 5, 2006 · Apt 2H
Close - Paint/plaster
Ceiling
Oct 9, 2006 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1900
- Floors
- 11
- Residential units
- 88
- Building area
- 88,258 ft²
- Lot area
- 15,142 ft²
- Zoning
- R8A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1829 / 7501
- Assessed value
- $10,278,438
- Landmark / historic district
- No
HPD registration #124126, last renewed Aug 30, 2025.
Questions about 2098 Fredrick Douglass Bl
Who owns 2098 Fredrick Douglass Bl?
The owner of record in NYC Department of City Planning PLUTO data is The Gateway Condominium.
Does 2098 Fredrick Douglass Bl have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 2098 Fredrick Douglass Bl rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2098 Fredrick Douglass Bl built?
City records list 1900 as the year it was built.
How many apartments are in 2098 Fredrick Douglass Bl?
It has 88 residential units and 91 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.