1810 Adam C Powell Blvd
Manhattan, NY 10026BBL 1-01826-0036Map
Owner of record: New Horizons Preservation, L.p.
1810 Adam C Powell Blvd is an elevator apartment building built in 1920 in Manhattan, 10026. It has 48 residential units across 6 floors. The owner of record is New Horizons Preservation, L.p.. HPD has recorded 182 housing violations here, most recently on October 2, 2026. 19 of the 50 most recent violations are still open.
- HPD violations
- 182
- DOB violations
- 29
- ECB violations
- 11
- HPD complaints
- 197
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 182
- ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Oct 2, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
Oct 2, 2026 · Apt 6E
Open — Notice of issuance sent to tenant - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
Oct 2, 2026 · Apt 6E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Oct 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 6th story
Oct 2, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above ceiling at public hall, 6th story
Oct 2, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Oct 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st story
Oct 2, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall at public hall, 6th story
Aug 25, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at public hall, 6th story
Aug 25, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 6th story
Aug 25, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixtures at ceiling in the private hallway located at apt 6e, 6th story, 1st apartment from south at west
Aug 25, 2026 · Apt 6E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
Aug 25, 2026 · Apt 6E
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
May 14, 2026 · Apt 6E
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
May 14, 2026 · Apt 6E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges in the entrance located at apt 6e, 6th story, 1st apartment from south at west
May 4, 2026 · Apt 6E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective sloping wood floor in the kitchen located at apt 6e, 6th story, 1st apartment from south at west
May 4, 2026 · Apt 6E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
May 4, 2026 · Apt 6E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
May 4, 2026 · Apt 6E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 6e, 6th story, 1st apartment from south at west
May 4, 2026 · Apt 6E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
May 4, 2026 · Apt 6E
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
May 4, 2026 · Apt 6E
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective air valve at radiator at west wall in the 4th room from east located at apt 6e, 6th story, 1st apartment from south at west
May 4, 2026 · Apt 6E
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective air valve at radiator at west wall in the kitchen located at apt 6e, 6th story, 1st apartment from south at west
May 4, 2026 · Apt 6E
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3g, 3rd story, 1st apartment from north at east
Feb 14, 2026 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at celler at boiler room
Feb 14, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 6th apartment from south at west
Feb 14, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing -- door swipe at door in the entrance located at apt 1d, 1st story, 2nd apartment from north at east
Dec 18, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 3rd apartment from south at west
Dec 13, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at south wall in the bathroom located at apt 4a, 4th story, 3rd apartment from south at west
Dec 13, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall and ceiling in the 4th room from north located at apt 4a, 4th story, 3rd apartment from south at west
Dec 13, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective radiator shut-off knob in the 1st room from east at south located at apt 6d, 6th story, 3rd apartment from north at east
Jan 8, 2025 · Apt 6D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective radiator shut-off knob in the 3rd room from east located at apt 6d, 6th story, 3rd apartment from north at east
Jan 8, 2025 · Apt 6D
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 6d, 6th story, 3rd apartment from north at east
Dec 2, 2024 · Apt 6D
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 6d, 6th story, 3rd apartment from north at east
Dec 2, 2024 · Apt 6D
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at the entrance door to the building
Jul 15, 2023
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 2h, 2nd story, 1st apartment from east at south
Nov 17, 2022 · Apt 2H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2h, 2nd story, 1st apartment from east at south
Nov 17, 2022 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2h, 2nd story, 1st apartment from east at south
Nov 17, 2022 · Apt 2H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east located at apt 2h, 2nd story, 1st apartment from east at south
Nov 17, 2022 · Apt 2H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 2h, 2nd story, 1st apartment from east at south
Nov 17, 2022 · Apt 2H
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 2h, 2nd story, 1st apartment from east at south
Nov 17, 2022 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective heavy duty lockset assembly at building front entrance door at public hall, 1st story
Oct 9, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at east and west walls, at bulkhead
Aug 6, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east and west walls, at bulkhead
Aug 6, 2021
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6c, 6th story, 2nd apartment from north at east
Aug 6, 2021 · Apt 6C
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Aug 6, 2021
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Jun 8, 2021 · Apt 3G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 3rd room from east located at apt 3g, 3rd story, 1st apartment from north at east
May 11, 2021 · Apt 3G
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from east located at apt 3g, 3rd story, 1st apartment from north at east
May 11, 2021 · Apt 3G
Open — Defect letter issued
DOB building violations · 29
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2016
Apr 6, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2016
Dob violation - resolved
Show 19 more ↓
- Construction other optional
Due to fire
Feb 6, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 30, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 13, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2004
Dob violation - resolved - Elevator elevatorrequired
1p9406
Dec 13, 2002
Dob violation - resolved - Elevator elevatorrequired
Device #1p9406
Aug 7, 1991
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
(52)not opening (33)skylight (33)wall (60)counterweight cease use until item 1 & 52 are comply with (35)post name of elev co
May 29, 1990
Dob violation - resolved - Elevator elevatorrequired
45/cover, 37/file and obtain unit for installation of the control ler
Oct 24, 1989
Dob violation - resolved - Elevator elevatorrequired
(5)glass (35)loose motor, broken feet cease use
Oct 24, 1989
Dob violation - resolved - Elevator elevatorrequired
(51) replace or repair car flr (52) remove bolt lock from basement (53) date and tag for 5yr safety b) provide capacity plate (1) basement contact
Feb 22, 1989
Dob violation - resolved - Elevator elevatorrequired
(11)restore (12)bells
Oct 24, 1988
Dob violation - resolved
ECB violations · 11
- Class - 2
Emergency communication in car not working; repair; elevator pit dirty, clean pit
Dec 22, 2022 · Penalty $3,125
Active - Class - 2
Failure to provide sidewalk shed parapet sign all to3301.9.noted:@timeof inspection sidewalk shed @ exp#1 missing parapet sign all to 3301.9.rem:provide sidewalk shed parapet sign all to 3301.9.
Aug 4, 2016
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: no approved drawings for sidewalk shed installed at exp2 at job site at time of inspection. remedy: provide plans
Dec 15, 2010
Resolve - Class - 1
Sec bc 3314.4.3 misc viol: no record of daily inspection of supported scaffold performed by authorized person at site. noted: no daily inspection record of supported scaffold at exp 1 & 2 at job site at time of
Dec 15, 2010 · Penalty $1,600
Resolve - Class - 2
Sidewalk shed does not meet code specs. noted: sidewalk shed at exp 2 1) shed posts installed approx 6" from sidewalk curb 2) shed post out of plumb approx 3" 3) missing wood plank under shed post. partial swo
Dec 15, 2010 · Penalty $2,400
Resolve - Non-hazardous
5e11-8v1-22d6-46k10-46h12-48u13-49u13-46b15. 22-d-6 sccure to code.
Nov 2, 2001 · Penalty $2,500
Resolve - Non-hazardous
18l11-2202-22d6-3502-48b15-5702-60m12-15e11-73x11 stops car when door is pulled 3rd fl. secure to the code make repairs & restore to service.
Dec 1, 2000
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifying to the installation of required fire protection systems .remedy; file report
Jun 7, 2000 · Penalty $200
Resolve - Non-hazardous
Failure to provide elevator landing signs in case of fire,use stairs unless other wise instructed on all flors. failure to provide "3" floor number signs at stair landing on all floors .remedy: provide signage
Jun 7, 2000 · Penalty $400
Resolve - Non-hazardous
17i,21x,28l,30i,33i,33z,47h,48r,49r,58o,73o,57o,52l,55b,35l. 17 4th fl30i walls. 33i, walls. 33z skylight. 48,49r,provide proper runby. 35 exposed wiring.
Nov 5, 1993
Resolve
Show 1 more ↓
- Non-hazardous
02l,11q,17q,18l,18l,31m,32m,33i,57o,15m,33w,28l,29m. 02 inaudible. 18 1st floor. 31 32 covers. 33i,sky light rotten. 15 floor #'s . 29m pit shield guard.
Jan 26, 1993
Resolve
Complaints
- Unsanitary condition
Pests
Sep 30, 2026 · Apt 6E
Close - Unsanitary condition
Pests
Sep 30, 2026 · Apt 6E
Close - Door/window
Door
Aug 21, 2026 · Apt 6E
Close - Plumbing
Radiator
Aug 21, 2026 · Apt 6E
Close - Paint/plaster
Wall
Aug 21, 2026 · Apt 6E
Close - Plumbing
Bathtub/shower
Aug 21, 2026 · Apt 6E
Close - Paint/plaster
Wall
Aug 21, 2026 · Apt 6E
Close - Flooring/stairs
Floor
Aug 21, 2026 · Apt 6E
Close - Unsanitary condition
Pests
Aug 21, 2026 · Apt 6E
Close - Unsanitary condition
Pests
Aug 21, 2026 · Apt 6E
Close
Show 40 more ↓
- Unsanitary condition
Pests
May 7, 2026 · Apt 6E
Close - Plumbing
Water supply
May 7, 2026 · Apt 6E
Close - Flooring/stairs
Floor
May 7, 2026 · Apt 6E
Close - Plumbing
Bathtub/shower
May 7, 2026 · Apt 6E
Close - Unsanitary condition
Pests
May 7, 2026 · Apt 6E
Close - Unsanitary condition
Pests
May 7, 2026 · Apt 6E
Close - Plumbing
Radiator
May 7, 2026 · Apt 6E
Close - Paint/plaster
Wall
May 7, 2026 · Apt 6E
Close - Unsanitary condition
Pests
Apr 24, 2026 · Apt 6E
Close - Flooring/stairs
Floor
Apr 24, 2026 · Apt 6E
Close - Door/window
Door
Apr 24, 2026 · Apt 6E
Close - Plumbing
Bathtub/shower
Apr 24, 2026 · Apt 6E
Close - Paint/plaster
Wall
Apr 24, 2026 · Apt 6E
Close - Plumbing
Radiator
Apr 24, 2026 · Apt 6E
Close - Paint/plaster
Wall
Apr 24, 2026 · Apt 6E
Close - Unsanitary condition
Pests
Apr 24, 2026 · Apt 6E
Close - Paint/plaster
Ceiling
Apr 24, 2026 · Apt 6E
Close - Plumbing
Radiator
Apr 24, 2026 · Apt 6E
Close - Paint/plaster
Wall
Apr 23, 2026 · Apt 6G
Close - Plumbing
Basin/sink
Apr 23, 2026 · Apt 6G
Close - Unsanitary condition
Pests
Apr 23, 2026 · Apt 6G
Close - Plumbing
Toilet
Apr 23, 2026 · Apt 6G
Close - Unsanitary condition
Pests
Apr 16, 2026 · Apt 6E
Close - Paint/plaster
Wall
Apr 16, 2026 · Apt 6E
Close - Plumbing
Radiator
Apr 16, 2026 · Apt 6E
Close - Paint/plaster
Wall
Apr 16, 2026 · Apt 6E
Close - Flooring/stairs
Floor
Apr 16, 2026 · Apt 6E
Close - Unsanitary condition
Pests
Apr 16, 2026 · Apt 6E
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt ANONYM
Close - Heat/hot water
Entire building
Feb 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt BUILDI
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt 2H
Close - Heat/hot water
Apartment only
Dec 12, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Dec 5, 2025 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1920
- Floors
- 6
- Residential units
- 48
- Building area
- 65,286 ft²
- Lot area
- 15,138 ft²
- Zoning
- R8A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1826 / 36
- Assessed value
- $5,745,600
- Landmark / historic district
- No
HPD registration #126780, last renewed Aug 13, 2025.
Questions about 1810 Adam C Powell Blvd
Who owns 1810 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is New Horizons Preservation, L.p..
Does 1810 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 182 housing violations at this property.
Is 1810 Adam C Powell Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1810 Adam C Powell Blvd built?
City records list 1920 as the year it was built.
How many apartments are in 1810 Adam C Powell Blvd?
It has 48 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.