roofy

105 East 128 Street

Manhattan, NY 10035BBL 1-01777-0005Map

Owner of record: NYC Housing Authority

105 East 128 Street is an elevator apartment building built in 1973 in Manhattan, 10035. It has 56 residential units across 9 floors. The owner of record is NYC Housing Authority. HPD has recorded 138 housing violations here, most recently on October 17, 2026. 28 of the 50 most recent violations are still open.

HPD violations
138
DOB violations
45
ECB violations
18
HPD complaints
263

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 138

  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Oct 17, 2026

    Open — Nov certified on time
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 7j, 7th story, 1st apartment from east at south

    Oct 17, 2026 · Apt 7J

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3n, 4th story, 5th apartment from east at south

    Sep 11, 2026 · Apt 3N

    Open — Defect letter issued
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3n, 4th story, 5th apartment from east at south

    Sep 11, 2026 · Apt 3N

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3n, 4th story, 5th apartment from east at south

    Sep 11, 2026 · Apt 3N

    Open — First no access to re- inspect violation
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at celing in the bathroom located at apt 3n, 4th story, 5th apartment from east at south

    Sep 11, 2026 · Apt 3N

    Open — Civ14 mailed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Sep 5, 2026

    Open — Nov certified on time
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 5h, 5th story, 7th apartment from west at north

    Aug 22, 2026 · Apt 5H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5h, 5th story, 7th apartment from west at north

    Aug 22, 2026 · Apt 5H

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at south wall in the bathroom located at apt 5h, 5th story, 7th apartment from west at north

    Aug 22, 2026 · Apt 5H

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5h, 5th story, 7th apartment from west at north

    Aug 22, 2026 · Apt 5H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5h, 5th story, 7th apartment from west at north

    Aug 22, 2026 · Apt 5H

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 5h, 5th story, 7th apartment from west at north

    Aug 22, 2026 · Apt 5H

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    Jul 26, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story

    Jul 26, 2026

    Open — Nov sent out
  • A

    Replace with new the defective flush pipe of water closet at south wall in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Jul 24, 2026 · Apt 5B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from west at north

    Jul 24, 2026 · Apt 5B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from west at north

    Jul 24, 2026 · Apt 5B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 5b, 5th story, 1st apartment from west at north

    Jul 24, 2026 · Apt 5B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 5b, 5th story, 1st apartment from west at north

    Jul 24, 2026 · Apt 5B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper at public hall, 8th story

    Jul 17, 2026

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 5b, 5th story, 1st apartment from west at north , section ''110''

    Jul 16, 2026 · Apt 5B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 5b, 5th story, 1st apartment from west at north , section ''110''

    Jul 16, 2026 · Apt 5B

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north , section ''110''

    Jul 16, 2026 · Apt 5B

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in drain line at bathtub in the 1st bathroom from north located at apt 2z, 2nd story, 4th apartment from west at north , section ''111''

    Jul 7, 2026 · Apt 2Z

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5l, 5th story, 3rd apartment from east at south , section ''110''

    Jul 7, 2026 · Apt 5L

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5l, 5th story, 3rd apartment from east at south , section ''110''

    Jul 7, 2026 · Apt 5L

    Closed — Violation closed
  • B

    Replace with new the missing upper wire mesh glass at fire door stairwell ''b'' at public hall, 3rd story, section ''110''

    Jul 7, 2026

    Open — Nov certified on time
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 5l, 5th story, 3rd apartment from east at south , section ''110''

    Jul 7, 2026 · Apt 5L

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at basement at public hall, section ''111''

    Jul 7, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at basement at public hall, section ''111''

    Jul 7, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective closer arm at vestibule , section ''111''

    Jul 7, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective closer arm at building entrance , section ''111''

    Jul 7, 2026

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at basement at public hall, section ''111''

    Jul 7, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 5b, 5th story, 1st apartment from north at east

    Jun 30, 2026 · Apt 5B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mortise lock and assembly at door in the entrance located at apt 5b, 5th story, 1st apartment from west at north

    Jun 9, 2026 · Apt 5B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north

    Jun 9, 2026 · Apt 5B

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north

    Jun 9, 2026 · Apt 5B

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 5b, 5th story, 1st apartment from west at north

    Jun 9, 2026 · Apt 5B

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at basin sink in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Jun 9, 2026 · Apt 5B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Jun 9, 2026 · Apt 5B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Jun 9, 2026 · Apt 5B

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latchset at door in the entrance located at apt 5b, 5th story, 1st apartment from west at north

    Jun 6, 2026 · Apt 5B

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1a, 1st story, 6th apartment from east at south , section ''110''

    Jun 2, 2026 · Apt 1A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 6th apartment from east at south , section ''110''

    Jun 2, 2026 · Apt 1A

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1a, 1st story, 6th apartment from east at south , section ''110''

    Jun 2, 2026 · Apt 1A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 1a, 1st story, 6th apartment from east at south , section ''110''

    Jun 2, 2026 · Apt 1A

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 6th apartment from east at south , section ''110''

    Jun 2, 2026 · Apt 1A

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3j, 3rd story, 3rd apartment from south at west

    Jun 1, 2026 · Apt 3J

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed

DOB building violations · 45

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Hazardous condition (facade) facade required

    Nycha cycle 9b unsafe report filed

    Aug 9, 2023

    Dob violation - active
Show 35 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Oct 15, 2019

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2017

    Mar 27, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Feb 20, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 20, 1999

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 6, 1998

    Dob violation - dismissed
  • Elevator elevatoroptional

    2

    Jun 28, 1993

    Dob violation - dismissed
  • Elevator elevatoroptional

    2

    Apr 7, 1992

    Dob violation - dismissed

ECB violations · 18

  • Class - 1

    Failure to take and provide adequate safety measures such as sidewalk shed fence ect.where required to protect and secure public safety fromdocumented unsafe facade as per 103.04.facade technical report file un

    Dec 19, 2019 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to maintain building exterior walls/facade and appurtenances.at the time of inspeciton exposure 1 north elevation at 105 128 street courtyard crack 8 floor and 1 floor at exposure 2 office area.roof loo

    Dec 19, 2019 · Penalty $1,250

    Active
  • Class - 1

    Defective manual reset hw control smoke alarm not working

    Nov 1, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Mobile boiler on street at this building is not registered with dob and is placed here without laa temporary boiler place permit=trailer#337/lic plate#667-183tl/va/ boiler;federal esp-400 date1995 btu16,800,000

    Aug 9, 2019

    Resolve
  • Class - 2

    Flame indication glass missing-doglegs missing-control covers missing-house pump leaking-king valve boiler #2 leaking-automatic damper defective-no compound gages on boilers-boiler room untidy-garbage stored in

    Aug 5, 2019

    Resolve
  • Class - 3

    Failure to maintain building wall(s) or appurtenances. noted:observed at north elevation(129 st),ramp leading to headstart program is missing approx 22ft length of handrail,(left railing north side). remedy:mai

    Jun 27, 2019

    Resolve
  • Class - 2

    B254 19, 441 10a, found rock mills boiler with the listed violation correct all listed violations and submited certificate of correction

    Jan 15, 2019

    Resolve
  • Class - 2

    B254 32a,50:debris in boiler room.correct all violation condition and submit certification of correction

    Oct 17, 2018

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #806226. rem: submit required technical report.

    Oct 15, 2018

    Resolve
  • Class - 2

    B254 as per class 2 (b254) 28-301.1 failure to maintain; 50a-leaking gasket on fire door at back of boiler; 50b-exposed electrical wires; 50c-doglegs missing at front and rear boiler accesses; 50d-no proving

    Apr 19, 2018

    Resolve
Show 8 more ↓
  • Class - 2

    28b,b254. 28b-on right side of boiler tubing are leaking on the front of boiler.

    Apr 17, 2017

    Resolve
  • Class - 2

    Failure to maintain building walls & appurtenances. noted:spalled concrete rebar and at underside of conc. eyebrow betwen 9f & roof parapet at south elvn (e 128 st)west section.rmdy: maintain bldg exteriors;rem

    May 4, 2013

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulations

    Jun 4, 2010

    Resolve
  • Class - 1

    Failure to maintain bldg exteriors. spalled concrete and (rebar) were found at front and rear elevn (e 129 st) at soffit of parapet overhangin front of 9/f lintels. remedy: make defective areas safe repair and

    May 12, 2009

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Dec 26, 2008

    Resolve
  • Class - 2

    05m07,100x10,52o02,56o02.05-kick blocks missing for car door provide.100-fireman's service phase ii inoperative repair.52-clean hoist rope.

    Dec 26, 2008

    Resolve
  • Class - 2

    52k11,53i11,56o02,40o02,64a15,100x10,100d05,10h11.53-governor rope ( ) replace.56 & 40-clean all rouge from machine & floor.64-wrong nyc id #on machine.100-fireman's service phase ii inoperative.100-car

    Dec 26, 2008

    Resolve
  • Hazardous

    Failure to maintain exterior of bdlg.spalling and loose concrete on the concrete roof over hang at the roof level at the 8th flr on the south elev. remedy:make area safe.erect sidewalk shed remove and repair

    Jun 12, 2003

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 18, 2026 · Apt 7H

    Close
  • Heat/hot water

    Apartment only

    Oct 15, 2026 · Apt 7H

    Close
  • Paint/plaster

    Ceiling

    Sep 9, 2026 · Apt 3N

    Close
  • Plumbing

    Bathtub/shower

    Aug 27, 2026 · Apt 4N

    Close
  • Door/window

    Door

    Aug 16, 2026 · Apt 5H

    Close
  • Plumbing

    Water supply

    Aug 14, 2026 · Apt 7H

    Close
  • Plumbing

    Water supply

    Aug 12, 2026 · Apt 6K

    Close
  • Plumbing

    Water supply

    Aug 12, 2026 · Apt 7H

    Close
  • Plumbing

    Water supply

    Aug 12, 2026 · Apt 6B

    Close
  • Flooring/stairs

    Floor

    Aug 7, 2026 · Apt 1K

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Aug 7, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Aug 7, 2026 · Apt 6B

    Close
  • Appliance

    Refrigerator

    Aug 7, 2026 · Apt 6B

    Close
  • Plumbing

    Toilet

    Aug 7, 2026 · Apt 6B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 7, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Jul 28, 2026 · Apt 5B

    Close
  • Door/window

    Door

    Jul 28, 2026 · Apt 5B

    Close
  • General

    Ventilation system

    Jul 28, 2026 · Apt 5B

    Close
  • Unsanitary condition

    Pests

    Jul 28, 2026 · Apt 5B

    Close
  • Unsanitary condition

    Pests

    Jul 28, 2026 · Apt 5B

    Close
  • Plumbing

    Toilet

    Jul 28, 2026 · Apt 5B

    Close
  • General

    Ventilation system

    Jul 23, 2026 · Apt 5B

    Close
  • Door/window

    Door

    Jul 23, 2026 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Jul 23, 2026 · Apt 5B

    Close
  • Door/window

    Door

    Jul 21, 2026 · Apt 5B

    Close
  • Plumbing

    Toilet

    Jul 21, 2026 · Apt 5B

    Close
  • General

    Ventilation system

    Jul 21, 2026 · Apt 5B

    Close
  • Paint/plaster

    Ceiling

    Jul 21, 2026 · Apt 5B

    Close
  • Water leak

    Heavy flow

    Jul 15, 2026 · Apt 8K

    Close
  • Water leak

    Slow leak

    Jul 12, 2026 · Apt 5D

    Close
  • Elevator

    Maintenance

    Jul 7, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 7, 2026 · Apt BLDG

    Close
  • Plumbing

    Toilet

    Jul 6, 2026 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Jul 6, 2026 · Apt 5B

    Close
  • Unsanitary condition

    Pests

    Jul 6, 2026 · Apt 5B

    Close
  • General

    Ventilation system

    Jul 6, 2026 · Apt 5B

    Close
  • General

    Ventilation system

    Jul 6, 2026 · Apt 5B

    Close
  • Door/window

    Door

    Jul 6, 2026 · Apt 5B

    Close
  • Plumbing

    Water supply

    Jun 26, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 26, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jun 25, 2026 · Apt 5BTHER

    Close
  • Door/window

    Door

    Jun 25, 2026 · Apt 5BTHER

    Close
  • Plumbing

    Toilet

    Jun 25, 2026 · Apt 6B

    Close
  • Plumbing

    Water supply

    Jun 25, 2026 · Apt 6B

    Close
  • General

    Cabinet

    Jun 23, 2026 · Apt 6F

    Close
  • Plumbing

    Toilet

    Jun 22, 2026 · Apt 6K

    Close
  • Door/window

    Door

    Jun 5, 2026 · Apt 5B

    Close
  • Unsanitary condition

    Pests

    Jun 5, 2026 · Apt 5B

    Close
  • Unsanitary condition

    Pests

    Jun 5, 2026 · Apt 5B

    Close
  • Appliance

    Electric/gas range

    Jun 5, 2026 · Apt 5B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D3)
Year built
1973
Floors
9
Residential units
56
Building area
199,884 ft²
Lot area
64,945 ft²
Zoning
R7-2
Community board
111
Council district
9
Block / lot
1777 / 5
Assessed value
$6,923,250
Landmark / historic district
No

HPD registration #145391, last renewed Jul 31, 2026.

Questions about 105 East 128 Street

Who owns 105 East 128 Street?

The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.

Does 105 East 128 Street have violations?

Yes. NYC HPD has recorded 138 housing violations at this property.

Is 105 East 128 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 105 East 128 Street built?

City records list 1973 as the year it was built.

How many apartments are in 105 East 128 Street?

It has 56 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.