105 East 128 Street
Manhattan, NY 10035BBL 1-01777-0005Map
Owner of record: NYC Housing Authority
105 East 128 Street is an elevator apartment building built in 1973 in Manhattan, 10035. It has 56 residential units across 9 floors. The owner of record is NYC Housing Authority. HPD has recorded 138 housing violations here, most recently on October 17, 2026. 28 of the 50 most recent violations are still open.
- HPD violations
- 138
- DOB violations
- 45
- ECB violations
- 18
- HPD complaints
- 263
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 138
- CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Oct 17, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7j, 7th story, 1st apartment from east at south
Oct 17, 2026 · Apt 7J
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3n, 4th story, 5th apartment from east at south
Sep 11, 2026 · Apt 3N
Open — Defect letter issued - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3n, 4th story, 5th apartment from east at south
Sep 11, 2026 · Apt 3N
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3n, 4th story, 5th apartment from east at south
Sep 11, 2026 · Apt 3N
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at celing in the bathroom located at apt 3n, 4th story, 5th apartment from east at south
Sep 11, 2026 · Apt 3N
Open — Civ14 mailed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 5, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 5h, 5th story, 7th apartment from west at north
Aug 22, 2026 · Apt 5H
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5h, 5th story, 7th apartment from west at north
Aug 22, 2026 · Apt 5H
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the bathroom located at apt 5h, 5th story, 7th apartment from west at north
Aug 22, 2026 · Apt 5H
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5h, 5th story, 7th apartment from west at north
Aug 22, 2026 · Apt 5H
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5h, 5th story, 7th apartment from west at north
Aug 22, 2026 · Apt 5H
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 5h, 5th story, 7th apartment from west at north
Aug 22, 2026 · Apt 5H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Jul 26, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Jul 26, 2026
Open — Nov sent out - ANon-hazardous
Replace with new the defective flush pipe of water closet at south wall in the bathroom located at apt 5b, 5th story, 1st apartment from west at north
Jul 24, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from west at north
Jul 24, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from west at north
Jul 24, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 5b, 5th story, 1st apartment from west at north
Jul 24, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 5b, 5th story, 1st apartment from west at north
Jul 24, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper at public hall, 8th story
Jul 17, 2026
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 5b, 5th story, 1st apartment from west at north , section ''110''
Jul 16, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 5b, 5th story, 1st apartment from west at north , section ''110''
Jul 16, 2026 · Apt 5B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north , section ''110''
Jul 16, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain line at bathtub in the 1st bathroom from north located at apt 2z, 2nd story, 4th apartment from west at north , section ''111''
Jul 7, 2026 · Apt 2Z
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5l, 5th story, 3rd apartment from east at south , section ''110''
Jul 7, 2026 · Apt 5L
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5l, 5th story, 3rd apartment from east at south , section ''110''
Jul 7, 2026 · Apt 5L
Closed — Violation closed - BHazardous
Replace with new the missing upper wire mesh glass at fire door stairwell ''b'' at public hall, 3rd story, section ''110''
Jul 7, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 5l, 5th story, 3rd apartment from east at south , section ''110''
Jul 7, 2026 · Apt 5L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at basement at public hall, section ''111''
Jul 7, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at basement at public hall, section ''111''
Jul 7, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm at vestibule , section ''111''
Jul 7, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm at building entrance , section ''111''
Jul 7, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at basement at public hall, section ''111''
Jul 7, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 5b, 5th story, 1st apartment from north at east
Jun 30, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock and assembly at door in the entrance located at apt 5b, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 5b, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at basin sink in the bathroom located at apt 5b, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at door in the entrance located at apt 5b, 5th story, 1st apartment from west at north
Jun 6, 2026 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1a, 1st story, 6th apartment from east at south , section ''110''
Jun 2, 2026 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 6th apartment from east at south , section ''110''
Jun 2, 2026 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1a, 1st story, 6th apartment from east at south , section ''110''
Jun 2, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 1a, 1st story, 6th apartment from east at south , section ''110''
Jun 2, 2026 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 6th apartment from east at south , section ''110''
Jun 2, 2026 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3j, 3rd story, 3rd apartment from south at west
Jun 1, 2026 · Apt 3J
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed
DOB building violations · 45
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Aug 9, 2023
Dob violation - active
Show 35 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Oct 15, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2017
Mar 27, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Feb 20, 2010
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Elevator elevatoroptional
2
Jun 28, 1993
Dob violation - dismissed - Elevator elevatoroptional
2
Apr 7, 1992
Dob violation - dismissed
ECB violations · 18
- Class - 1
Failure to take and provide adequate safety measures such as sidewalk shed fence ect.where required to protect and secure public safety fromdocumented unsafe facade as per 103.04.facade technical report file un
Dec 19, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to maintain building exterior walls/facade and appurtenances.at the time of inspeciton exposure 1 north elevation at 105 128 street courtyard crack 8 floor and 1 floor at exposure 2 office area.roof loo
Dec 19, 2019 · Penalty $1,250
Active - Class - 1
Defective manual reset hw control smoke alarm not working
Nov 1, 2019 · Penalty $1,250
Resolve - Class - 2
Mobile boiler on street at this building is not registered with dob and is placed here without laa temporary boiler place permit=trailer#337/lic plate#667-183tl/va/ boiler;federal esp-400 date1995 btu16,800,000
Aug 9, 2019
Resolve - Class - 2
Flame indication glass missing-doglegs missing-control covers missing-house pump leaking-king valve boiler #2 leaking-automatic damper defective-no compound gages on boilers-boiler room untidy-garbage stored in
Aug 5, 2019
Resolve - Class - 3
Failure to maintain building wall(s) or appurtenances. noted:observed at north elevation(129 st),ramp leading to headstart program is missing approx 22ft length of handrail,(left railing north side). remedy:mai
Jun 27, 2019
Resolve - Class - 2
B254 19, 441 10a, found rock mills boiler with the listed violation correct all listed violations and submited certificate of correction
Jan 15, 2019
Resolve - Class - 2
B254 32a,50:debris in boiler room.correct all violation condition and submit certification of correction
Oct 17, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #806226. rem: submit required technical report.
Oct 15, 2018
Resolve - Class - 2
B254 as per class 2 (b254) 28-301.1 failure to maintain; 50a-leaking gasket on fire door at back of boiler; 50b-exposed electrical wires; 50c-doglegs missing at front and rear boiler accesses; 50d-no proving
Apr 19, 2018
Resolve
Show 8 more ↓
- Class - 2
28b,b254. 28b-on right side of boiler tubing are leaking on the front of boiler.
Apr 17, 2017
Resolve - Class - 2
Failure to maintain building walls & appurtenances. noted:spalled concrete rebar and at underside of conc. eyebrow betwen 9f & roof parapet at south elvn (e 128 st)west section.rmdy: maintain bldg exteriors;rem
May 4, 2013
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulations
Jun 4, 2010
Resolve - Class - 1
Failure to maintain bldg exteriors. spalled concrete and (rebar) were found at front and rear elevn (e 129 st) at soffit of parapet overhangin front of 9/f lintels. remedy: make defective areas safe repair and
May 12, 2009
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 26, 2008
Resolve - Class - 2
05m07,100x10,52o02,56o02.05-kick blocks missing for car door provide.100-fireman's service phase ii inoperative repair.52-clean hoist rope.
Dec 26, 2008
Resolve - Class - 2
52k11,53i11,56o02,40o02,64a15,100x10,100d05,10h11.53-governor rope ( ) replace.56 & 40-clean all rouge from machine & floor.64-wrong nyc id #on machine.100-fireman's service phase ii inoperative.100-car
Dec 26, 2008
Resolve - Hazardous
Failure to maintain exterior of bdlg.spalling and loose concrete on the concrete roof over hang at the roof level at the 8th flr on the south elev. remedy:make area safe.erect sidewalk shed remove and repair
Jun 12, 2003
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 18, 2026 · Apt 7H
Close - Heat/hot water
Apartment only
Oct 15, 2026 · Apt 7H
Close - Paint/plaster
Ceiling
Sep 9, 2026 · Apt 3N
Close - Plumbing
Bathtub/shower
Aug 27, 2026 · Apt 4N
Close - Door/window
Door
Aug 16, 2026 · Apt 5H
Close - Plumbing
Water supply
Aug 14, 2026 · Apt 7H
Close - Plumbing
Water supply
Aug 12, 2026 · Apt 6K
Close - Plumbing
Water supply
Aug 12, 2026 · Apt 7H
Close - Plumbing
Water supply
Aug 12, 2026 · Apt 6B
Close - Flooring/stairs
Floor
Aug 7, 2026 · Apt 1K
Close
Show 40 more ↓
- Unsanitary condition
Pests
Aug 7, 2026 · Apt 6B
Close - Unsanitary condition
Pests
Aug 7, 2026 · Apt 6B
Close - Appliance
Refrigerator
Aug 7, 2026 · Apt 6B
Close - Plumbing
Toilet
Aug 7, 2026 · Apt 6B
Close - Unsanitary condition
Garbage/recycling storage
Aug 7, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Jul 28, 2026 · Apt 5B
Close - Door/window
Door
Jul 28, 2026 · Apt 5B
Close - General
Ventilation system
Jul 28, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jul 28, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jul 28, 2026 · Apt 5B
Close - Plumbing
Toilet
Jul 28, 2026 · Apt 5B
Close - General
Ventilation system
Jul 23, 2026 · Apt 5B
Close - Door/window
Door
Jul 23, 2026 · Apt 5B
Close - Unsanitary condition
Mold
Jul 23, 2026 · Apt 5B
Close - Door/window
Door
Jul 21, 2026 · Apt 5B
Close - Plumbing
Toilet
Jul 21, 2026 · Apt 5B
Close - General
Ventilation system
Jul 21, 2026 · Apt 5B
Close - Paint/plaster
Ceiling
Jul 21, 2026 · Apt 5B
Close - Water leak
Heavy flow
Jul 15, 2026 · Apt 8K
Close - Water leak
Slow leak
Jul 12, 2026 · Apt 5D
Close - Elevator
Maintenance
Jul 7, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 7, 2026 · Apt BLDG
Close - Plumbing
Toilet
Jul 6, 2026 · Apt 5B
Close - Unsanitary condition
Mold
Jul 6, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jul 6, 2026 · Apt 5B
Close - General
Ventilation system
Jul 6, 2026 · Apt 5B
Close - General
Ventilation system
Jul 6, 2026 · Apt 5B
Close - Door/window
Door
Jul 6, 2026 · Apt 5B
Close - Plumbing
Water supply
Jun 26, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jun 26, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 25, 2026 · Apt 5BTHER
Close - Door/window
Door
Jun 25, 2026 · Apt 5BTHER
Close - Plumbing
Toilet
Jun 25, 2026 · Apt 6B
Close - Plumbing
Water supply
Jun 25, 2026 · Apt 6B
Close - General
Cabinet
Jun 23, 2026 · Apt 6F
Close - Plumbing
Toilet
Jun 22, 2026 · Apt 6K
Close - Door/window
Door
Jun 5, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jun 5, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jun 5, 2026 · Apt 5B
Close - Appliance
Electric/gas range
Jun 5, 2026 · Apt 5B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1973
- Floors
- 9
- Residential units
- 56
- Building area
- 199,884 ft²
- Lot area
- 64,945 ft²
- Zoning
- R7-2
- Community board
- 111
- Council district
- 9
- Block / lot
- 1777 / 5
- Assessed value
- $6,923,250
- Landmark / historic district
- No
HPD registration #145391, last renewed Jul 31, 2026.
Questions about 105 East 128 Street
Who owns 105 East 128 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 105 East 128 Street have violations?
Yes. NYC HPD has recorded 138 housing violations at this property.
Is 105 East 128 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 105 East 128 Street built?
City records list 1973 as the year it was built.
How many apartments are in 105 East 128 Street?
It has 56 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.