roofy

Violations at 310 East 115 Street

Manhattan, NY 10029 · BBL 1-01684-0001 · Back to the property

HPD housing violations

38 HPD violations, newest first.

  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the 1st room from north at east, the 1st room from north at west, the bathroom , the private hallway , the foyer , the kitchen located at apt 9d, 9th story, 1st apartment from north at east

    Jan 29, 2022 · Apt 9D

    Closed — Violation closed
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 9d, 9th story, 1st apartment from north at east

    Jan 29, 2022 · Apt 9D

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt 9d, 9th story, 1st apartment from north at east

    Jan 29, 2022 · Apt 9D

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak through ceiling in the bathroom located at apt 9d, 9th story, 1st apartment from north at east

    Jan 29, 2022 · Apt 9D

    Closed — Violation closed
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 9d, 9th story, 1st apartment from north at east

    Jan 29, 2022 · Apt 9D

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from east located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at west wall in the 1st room from east located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall inside closet at north wall in the foyer located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at north wall inside closet at north wall in the foyer located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color north and east walls. in the 3rd room from east located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling, south and east walls. in the bathroom located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • CImmediately hazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling, south and east walls. approx = 70 sq.ft. in the bathroom located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at north and east walls. approx. = 16 sq.ft. in the 3rd room from east located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color south and east walls in the bathroom located at apt 4a, 4th story, 2nd apartment from south at west

    Oct 9, 2015 · Apt 4A

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at west

    Oct 24, 2012 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective mortise lock to the door in the entrance located at apt 4d, 4th story, 1st apartment from north at east

    Apr 26, 2010 · Apt 4D

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east

    Apr 26, 2010 · Apt 4D

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective the bell , return buzzer and the intercom sysytem in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east

    Apr 26, 2010 · Apt 4D

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective wood cabinets below the sink in the kitchen located at apt 4d, 4th story, 1st apartment from north at east

    Apr 26, 2010 · Apt 4D

    Open — Nov sent out
  • ANon-hazardous

    Refit the door in the entrance located at apt 4d, 4th story, 1st apartment from north at east

    Apr 26, 2010 · Apt 4D

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east

    Apr 26, 2010 · Apt 4D

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 13d, 13th story, 2nd apartment from south at west

    Jan 21, 2010 · Apt 13D

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 13d, 13th story, 2nd apartment from south at west

    Jan 21, 2010 · Apt 13D

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets wash/basin, in the bathroom located at apt 3a, 3rd story, 2nd apartment from north at east

    Jan 29, 2008 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling, in the bathroom located at apt 3a, 3rd story, 2nd apartment from north at east

    Jan 29, 2008 · Apt 3A

    Open — Nov sent out
  • BHazardous

    M/d law abate the nuisance consisting of moisture, penetrating ceiling & walls, in the bathroom located at apt 3a, 3rd story, 2nd apartment from north at east

    Jan 29, 2008 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective rubber/gaskits, around doors, of refrigerator, in the kitchen located at apt 3a, 3rd story, 2nd apartment from north at east

    Jan 29, 2008 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color (south wall) in the bathroom located at apt 1a, 1st story, apartment at north

    Apr 6, 2005 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective closet door in the 3rd room from east at south located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 6, 2005 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Replace with new the missing closet (door) in the 1st room from north at west located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 6, 2005 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective (windows) so they can open & close properly in the entire apartment located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 6, 2005 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the entire apartment located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 6, 2005 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Replace with new the missing closet (doors) in the foyer located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 6, 2005 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective (base cabinet draw) in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 6, 2005 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Provide adequate supply of hot water for the fixtures (tub & basin) in the bathroom located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 6, 2005 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Provide adequate supply of cold water for the fixtures (tub & basin) in the bathroom located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 6, 2005 · Apt 1A

    Open — Nov sent out
  • BHazardous

    D26-10.01, 10.05 adm code arrange and make self-closing the doors incinerator hopper pub hall all stys.

    Jun 20, 1977

    Open — Nov sent out

DOB building violations

The newest 50 of 148 DOB violations. The city keeps the complete history.

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 27, 2018

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Feb 16, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)

    Jun 1, 2016

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jan 27, 2016

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jan 27, 2016

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4

    Dec 31, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Nov 1, 2013

    Dob violation - active
  • Facade facade optional

    Cycle 7 unsafe report filed

    Oct 24, 2013

    Dob violation - dismissed

ECB violations

The newest 50 of 78 ECB violations. The city keeps the complete history.

  • Class - 1

    Failure to maintain building in code-compliant manner. as noted at time of inspection on a 1 story building using for materials storage by nyc housing authority. observed cracked/spalled brick masonry facade al

    Sep 29, 2026 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner.as noted at timeof inspection on a 1 story building using for materials storage by nychousing authority.observed cracked/spalled brick masonry facade.also,c

    Jun 24, 2026 · Penalty $2,500

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906120.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906111.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906112.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906113.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906114.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906115.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906116.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906117.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906119.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906118.rem:submit acceptable required t

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Ftm b254 boiler johnson model#pftx-400 with these violating conditions broken steam pressure gauge, corroded &leaking handholes correct all violations and submit cert.of corrections

    Jul 6, 2022 · Penalty $625

    Resolve
  • Class - 2

    Oil fuseable links not connected. possible oil leak at tank coming thru wall.(tank test needed) hand holes corroded. boiler numbers not posted. steam solonoid constandly open.

    Jun 27, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building exterior walls/facade and appurtenances. note:at the time of inspection observed at exposure 4,east elevation of main bldg.(entrance of upk)broken/damaged masonry spalled concrete a

    Jun 24, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain ext bldg at exp#2 and various locations,rusting lintels, can supporting a/c elev33 2nd fl-missing brackets 3fl.rem:maintain ext bldg-provide safety measures-make sure as per 1rcny 103-04

    Jan 16, 2020 · Penalty $1,250

    Active
  • Class - 1

    Failure to take & provide safety measures such as sidewalk shed fence etc. where required to protect & secure public safety from documented unsafe facade as per 1rcny 103-04. facade technical report file unsafe

    Jan 6, 2020 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to maintain building facade.a-flower pots on window sill.b-general note-rusting of lintels.c-corner brick broken.remedy:maintain exterior facade.provide safety measures make facade safe as per 1rcny 103

    Aug 15, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain exterior building facade. 1-roof door detached (bulk head 2235b) 2-black attached to lower floors-black wires 3-new roof ponding 4-misc. domestic debre on roof (inop 5-broken windo

    Jul 18, 2019

    Resolve
  • Class - 2

    Failure to maintain exterior facade. roof-rusting roof bulk ladder. missing exhaust hood-door hardware. rusting-2 antenna on bulkhead. elevations-eroded grout. general note:ac units missing brackets. remedy:mai

    Jun 4, 2019

    Resolve
  • Class - 2

    Failure to maintain exterior facade. roof-vent hood defective-elevatormachine room. stair b door hardware-door hitting frame. entrance rusting lintels-various locations. a/c missing brackets. remedy:maintain ex

    Jun 4, 2019

    Resolve
  • Class - 2

    32a.50a.50b.50c.50d.50e.50f.50g.50h.50i:as per class 2(b254)28.301.1 failure to maintain.32a:exposed electrical boilers #1,3,4& 5 50e:doglegs missing boiler #'s2&5.50a:(solenoied)valve leak ,boiler #1.50f:corro

    Oct 23, 2018

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #806113. rem: submit required technical report

    May 18, 2018

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #806117. rem: submit required technical report

    May 18, 2018

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #806115. rem: submit required technical report

    May 18, 2018

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #806116. rem: submit required technical report

    May 18, 2018

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #806111. rem: submit required technical report

    May 18, 2018

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #806112. rem: submit required technical report

    May 18, 2018

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #806114. rem: submit required technical report

    May 18, 2018

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #806120. rem: submit required technical report

    May 18, 2018

    Resolve
  • Class - 2

    (b254)32a:wiring exposed on lwlo and pressuretrol.correct all vioating conditions.

    Jan 16, 2018

    Resolve
  • Class - 2

    100h10, 64u15. (100) fine key comes out on phase ii. (64-u-15) nyc id missing on gov.

    Apr 5, 2017

    Resolve
  • Class - 2

    70o02, 16j01, 100b10. (16-j-01) adjust 7th floor door (100-b-10) repair phase ii.

    Apr 5, 2017

    Resolve
  • Class - 2

    01b10, 59u15. (02-b-10) repair in care fire light. (59-u-15) annual brake. maintenance tag.

    Apr 5, 2017

    Resolve
  • Class - 2

    59bb15 brake maintenance tag expired replace.

    Mar 3, 2017

    Resolve
  • Class - 2

    Failure to maintain exterior bldg facade and appurtenantce. note: westelevation,exp#3 (2nd av) obseve inadequately installed/supported window a/c units at various location. rmdy: maintain exterior bldg facade &

    Oct 25, 2016

    Resolve
  • Class - 1

    3310.10.2 "osha 10" noted: at time of inspection with "doi" the following workers, were in recession of a fraudelent "osha 10" card. 1-francisco a lopez; 2-jorge sol; 3-sandeep singh-comply with code.

    Oct 14, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner: lack of emergency lighting for exits, exit discharges & public corridors per bc 1006.1; 27-542. at 1st story exit lights designated #3 & #4 failed to illuminat

    May 12, 2015

    Resolve
  • Class - 2

    Exit door not self closing. at north elevation main entry/exit door not closing. remedy: comply with notice of violation. repair &/or replace door.

    May 12, 2015

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner: use of prohibited door &/or hardware per bc 1008.1.8; 27-371(j). at all upk classrooms screen doors at exit discharges swing against the flow of egress obstruc

    May 12, 2015

    Resolve
  • Class - 2

    3307.10. failure to maintain sidewalk shed in good order. noted: at time of inspection several mud sills for sidewalk shed at exp #1 & #4 are rotten / broken. remedy: comply with code.

    Sep 2, 2014

    Resolve
  • Class - 1

    Cu 97x10 cu97x10 cease use due to water damage from fire.before returning back to service call dob for a full inspection. 212-566-5544.

    Mar 26, 2011

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve