Violations at 2055 3 Avenue
Manhattan, NY 10029 · BBL 1-01662-0001 · Back to the property
HPD housing violations
23 HPD violations, newest first.
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from north at west located at apt 10b, 10th story, 1st apartment from south at west
Nov 28, 2019 · Apt 10B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd bathroom from north at east located at apt 10b, 10th story, 1st apartment from south at west
Nov 28, 2019 · Apt 10B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd bathroom from north at east located at apt 10b, 10th story, 1st apartment from south at west
Nov 28, 2019 · Apt 10B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd bathroom from north at east located at apt 10b, 10th story, 1st apartment from south at west
Nov 28, 2019 · Apt 10B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the 1st bathroom from north located at apt 3a, 3rd story, 2nd apartment from south at west
Oct 18, 2019 · Apt 3A
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective at showerbody in the bathroom located at apt 10a, 10th story, 2nd apartment from north at east
May 31, 2018 · Apt 10A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 3a, 3rd story, 2nd apartment from south at west
Mar 26, 2010 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from west at north wall, south wall in the 1st room from east at north located at apt 3a, 3rd story, 2nd apartment from south at west
Mar 26, 2010 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at west
Mar 26, 2010 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from west at north wall wall, 2nd closet from east at south wall wall, floor, east wall in the private hallway located at apt 3a, 3rd story, 2nd apartment from south at west
Mar 26, 2010 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from north at east located at apt 3a, 3rd story, 2nd apartment from south at west
Mar 26, 2010 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from north at west located at apt 3a, 3rd story, 2nd apartment from south at west
Mar 26, 2010 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department (ceiling) in the bathroom located at apt 4b, 4th story, 1st apartment from north at east
Apr 11, 2005 · Apt 4B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department (all walls) in the bathroom located at apt 4b, 4th story, 1st apartment from north at east
Apr 11, 2005 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color (north wall) in the bathroom located at apt 4b, 4th story, 1st apartment from north at east
Apr 11, 2005 · Apt 4B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor at radiator in the 1st room from north at east located at apt 3c, 3rd story, 4th apartment from west at north
Mar 31, 2005 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3c, 3rd story, 4th apartment from west at north
Mar 31, 2005 · Apt 3C
Open — Nov sent out - BHazardous
§ 12 m/d law discontinue the storage of combustible material papers in the entire apartment located at apt 3c, 3rd story, 4th apartment from west at north
Mar 31, 2005 · Apt 3C
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 3c, 3rd story, 4th apartment from west at north
Mar 31, 2005 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock on apt. door in the entrance located at apt 3c, 3rd story, 4th apartment from west at north
Mar 31, 2005 · Apt 3C
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3c, 3rd story, 4th apartment from west at north
Mar 31, 2005 · Apt 3C
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3c, 3rd story, 4th apartment from west at north
Mar 31, 2005 · Apt 3C
Open — Nov sent out - ANon-hazardous
D26-10.01 adm code properly repair the broken or defective doors lock at 9th sty southwest apt 9d bathroom. , section '' ''
Mar 6, 1986 · Apt 9D
Open — Nov sent out
DOB building violations
The newest 50 of 62 DOB violations. The city keeps the complete history.
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 27, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 27, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 27, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 27, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 27, 2016
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Oct 24, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Oct 24, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Oct 24, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Oct 24, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jun 13, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jun 13, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jun 13, 2013
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Apr 19, 2010
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Apr 19, 2010
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Apr 5, 2010
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Feb 20, 2010
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed
ECB violations
37 ECB violations, newest first.
- Class - 1
Failure to maintain building facade walls and appurtenances.note:at the time of inspection i observed at ex#3,east elevation,cracked/broken glass window at 5th floor and 1st floor.at ex#1,west elevation,unsecur
Aug 5, 2026 · Penalty $5,000
Active - Class - 1
Failure to maintain bldg exterior facade and appurtenances.note:at time of inspection,i observed at exp#2 west(1)damaged/partially detached window guard at 7th floor(2)unsecured objects on windowsill(loose wood
May 20, 2026 · Penalty $5,000
Active - Class - 2
Failure to maintain bldg exterior facade and appurtenances.note:at time of inspection,i observed cracked/spalling brick,2nd floor above bldgentry ramp at exp#4 south.rem:maintain bldg exterior facade and appurt
May 20, 2026 · Penalty $2,500
Active - Class - 2
Failure to maintain bldg exterior facade and appurtenances.note:at time of inspection,i observed cracked/spalling brick at exp#1 south aboveby bldg entrance ramp,2065.rem:maintain bldg exterior facade and appur
May 20, 2026 · Penalty $2,500
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances. note: at the time of inspection observed at exp #2(north elev.) broken window glass at 2nd floor. remedy: maintain exterior building facade and ap
May 20, 2026 · Penalty $5,000
Active - Class - 1
I observed the service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec; comply with nyc ec
Dec 19, 2022 · Penalty $1,600
Active - Class - 1
Service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec; comply with nyc ec
Dec 19, 2022 · Penalty $1,600
Active - Class - 1
Service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec; comply with nyc ec
Dec 19, 2022 · Penalty $1,600
Active - Class - 1
Service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec; comply with nyc ec
Dec 19, 2022 · Penalty $1,600
Active - Class - 1
Service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec
Dec 19, 2022 · Penalty $1,600
Active - Class - 1
Unapproved/unsafe/unsuitable electrical equipments,apparatus,materials,devices,appliances or wiring in use. defective,unsafe,hazardous circuit breaker panels,w/ exposed live,bus bars,missing breakers,and knock
Nov 4, 2020 · Penalty $1,600
Resolve - Class - 2
59u15. (59-u-15) perform and tag device for annual brake maintenance.
Apr 5, 2017
Resolve - Class - 2
59u15, 11x10. (59-u-15) perform and tag device for annual brake maintenance (11-x-10) repair call cancel button.
Apr 5, 2017
Resolve - Class - 2
59-u15. (59-u-15) perform and tag device for annual brake maintenance.
Apr 5, 2017
Resolve - Class - 2
59bb15 brake maintenance tag expired, perform brake maintenance and tag device.
Mar 3, 2017
Resolve - Class - 2
Failure to maintain exterior bldg facade and appurtenantce. note: eastelevation,exp#3 (2nd av)observe inadequately installed/supported window a/c units. rmdy: maintain exterior bldg facade & appurtenances provi
Oct 25, 2016
Resolve - Class - 1
Failure to take & provide safety measures(sidewalk shed,netting,etc) ewhere required to protect & secure public safety from unsafe facade as per 1rcny 103-04. facade technical report file unsafe by pe/re on 6/1
Sep 23, 2016
Resolve - Class - 1
Failure to take & provide safety measures(sidewalk shed,netting,etc)where require to protect & secure public safety from documented unsafe facade as per 1rcny 103-04. facade technical report file unsafe by pe/r
Sep 23, 2016
Resolve - Class - 1
Failure to take & provide safety measures where require to protect & secure public safety from documented unsafe facade as per 1rcny 103-04.noted: safety measures in place inadequate. missing parapet panels on
Aug 18, 2016
Resolve - Class - 2
Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi
Jul 16, 2010
Resolve - Class - 2
Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi
Jul 16, 2010
Resolve - Class - 2
Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi
Jul 16, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
Jun 4, 2010
Resolve - Class - 1
Cease use/16-i-10repair/replace lobby hoistway dr handle/2-l-10-repairalarm system
Nov 15, 2009
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Non-hazardous
66o02.66-elevator pit for elevator #1p24051 is dirty/accumulated paper,and other debris.
Sep 3, 2004
Resolve - Non-hazardous
Work without a permit work noted:interior common area bldg walls opened exposed w/exposed interior bldg elements w/out a permit noted locations(1)common hallway south/east 2fl to 14th fls(2)adjacent hose lack 2
Nov 10, 2003
Resolve - Hazardous
Failure to maintain noted defect:corridor wall open w/loose broken fragmented detached masonary members exposed interior and exterior commonwall units w/out temp coverage panel/or protective barrier.noted locat
Nov 10, 2003
Resolve - Non-hazardous
5j1, 7302, 17r12, 50y14, 3i11. 17-with wire glass
Apr 19, 1995
Resolve - Non-hazardous
9b7, 3i11, 73o2
Apr 19, 1995
Resolve - Non-hazardous
30e, 74e. 74 remedy: noise in shaftway near top landing.
Sep 9, 1992 · Penalty $1,000
Resolve