roofy

Violations at 2055 3 Avenue

Manhattan, NY 10029 · BBL 1-01662-0001 · Back to the property

HPD housing violations

23 HPD violations, newest first.

  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from north at west located at apt 10b, 10th story, 1st apartment from south at west

    Nov 28, 2019 · Apt 10B

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd bathroom from north at east located at apt 10b, 10th story, 1st apartment from south at west

    Nov 28, 2019 · Apt 10B

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd bathroom from north at east located at apt 10b, 10th story, 1st apartment from south at west

    Nov 28, 2019 · Apt 10B

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd bathroom from north at east located at apt 10b, 10th story, 1st apartment from south at west

    Nov 28, 2019 · Apt 10B

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the 1st bathroom from north located at apt 3a, 3rd story, 2nd apartment from south at west

    Oct 18, 2019 · Apt 3A

    Closed — Violation closed
  • ANon-hazardous

    Properly repair the broken or defective at showerbody in the bathroom located at apt 10a, 10th story, 2nd apartment from north at east

    May 31, 2018 · Apt 10A

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 3a, 3rd story, 2nd apartment from south at west

    Mar 26, 2010 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from west at north wall, south wall in the 1st room from east at north located at apt 3a, 3rd story, 2nd apartment from south at west

    Mar 26, 2010 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at west

    Mar 26, 2010 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from west at north wall wall, 2nd closet from east at south wall wall, floor, east wall in the private hallway located at apt 3a, 3rd story, 2nd apartment from south at west

    Mar 26, 2010 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from north at east located at apt 3a, 3rd story, 2nd apartment from south at west

    Mar 26, 2010 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from north at west located at apt 3a, 3rd story, 2nd apartment from south at west

    Mar 26, 2010 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department (ceiling) in the bathroom located at apt 4b, 4th story, 1st apartment from north at east

    Apr 11, 2005 · Apt 4B

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department (all walls) in the bathroom located at apt 4b, 4th story, 1st apartment from north at east

    Apr 11, 2005 · Apt 4B

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color (north wall) in the bathroom located at apt 4b, 4th story, 1st apartment from north at east

    Apr 11, 2005 · Apt 4B

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood floor at radiator in the 1st room from north at east located at apt 3c, 3rd story, 4th apartment from west at north

    Mar 31, 2005 · Apt 3C

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3c, 3rd story, 4th apartment from west at north

    Mar 31, 2005 · Apt 3C

    Open — Nov sent out
  • BHazardous

    § 12 m/d law discontinue the storage of combustible material papers in the entire apartment located at apt 3c, 3rd story, 4th apartment from west at north

    Mar 31, 2005 · Apt 3C

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 3c, 3rd story, 4th apartment from west at north

    Mar 31, 2005 · Apt 3C

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective lock on apt. door in the entrance located at apt 3c, 3rd story, 4th apartment from west at north

    Mar 31, 2005 · Apt 3C

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 3c, 3rd story, 4th apartment from west at north

    Mar 31, 2005 · Apt 3C

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3c, 3rd story, 4th apartment from west at north

    Mar 31, 2005 · Apt 3C

    Open — Nov sent out
  • ANon-hazardous

    D26-10.01 adm code properly repair the broken or defective doors lock at 9th sty southwest apt 9d bathroom. , section '' ''

    Mar 6, 1986 · Apt 9D

    Open — Nov sent out

DOB building violations

The newest 50 of 62 DOB violations. The city keeps the complete history.

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2023

    Jun 23, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jan 27, 2016

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jan 27, 2016

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jan 27, 2016

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jan 27, 2016

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jan 27, 2016

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Oct 24, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Oct 24, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Oct 24, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Oct 24, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Jun 13, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Jun 13, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Jun 13, 2013

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Apr 19, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Apr 19, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Apr 5, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Feb 20, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed

ECB violations

37 ECB violations, newest first.

  • Class - 1

    Failure to maintain building facade walls and appurtenances.note:at the time of inspection i observed at ex#3,east elevation,cracked/broken glass window at 5th floor and 1st floor.at ex#1,west elevation,unsecur

    Aug 5, 2026 · Penalty $5,000

    Active
  • Class - 1

    Failure to maintain bldg exterior facade and appurtenances.note:at time of inspection,i observed at exp#2 west(1)damaged/partially detached window guard at 7th floor(2)unsecured objects on windowsill(loose wood

    May 20, 2026 · Penalty $5,000

    Active
  • Class - 2

    Failure to maintain bldg exterior facade and appurtenances.note:at time of inspection,i observed cracked/spalling brick,2nd floor above bldgentry ramp at exp#4 south.rem:maintain bldg exterior facade and appurt

    May 20, 2026 · Penalty $2,500

    Active
  • Class - 2

    Failure to maintain bldg exterior facade and appurtenances.note:at time of inspection,i observed cracked/spalling brick at exp#1 south aboveby bldg entrance ramp,2065.rem:maintain bldg exterior facade and appur

    May 20, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain exterior building facade and appurtenances. note: at the time of inspection observed at exp #2(north elev.) broken window glass at 2nd floor. remedy: maintain exterior building facade and ap

    May 20, 2026 · Penalty $5,000

    Active
  • Class - 1

    I observed the service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec; comply with nyc ec

    Dec 19, 2022 · Penalty $1,600

    Active
  • Class - 1

    Service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec; comply with nyc ec

    Dec 19, 2022 · Penalty $1,600

    Active
  • Class - 1

    Service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec; comply with nyc ec

    Dec 19, 2022 · Penalty $1,600

    Active
  • Class - 1

    Service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec; comply with nyc ec

    Dec 19, 2022 · Penalty $1,600

    Active
  • Class - 1

    Service and electrical equipment in the main service room is extremely deteriorated and has to be repaired or replaced, comply with ec

    Dec 19, 2022 · Penalty $1,600

    Active
  • Class - 1

    Unapproved/unsafe/unsuitable electrical equipments,apparatus,materials,devices,appliances or wiring in use. defective,unsafe,hazardous circuit breaker panels,w/ exposed live,bus bars,missing breakers,and knock

    Nov 4, 2020 · Penalty $1,600

    Resolve
  • Class - 2

    59u15. (59-u-15) perform and tag device for annual brake maintenance.

    Apr 5, 2017

    Resolve
  • Class - 2

    59u15, 11x10. (59-u-15) perform and tag device for annual brake maintenance (11-x-10) repair call cancel button.

    Apr 5, 2017

    Resolve
  • Class - 2

    59-u15. (59-u-15) perform and tag device for annual brake maintenance.

    Apr 5, 2017

    Resolve
  • Class - 2

    59bb15 brake maintenance tag expired, perform brake maintenance and tag device.

    Mar 3, 2017

    Resolve
  • Class - 2

    Failure to maintain exterior bldg facade and appurtenantce. note: eastelevation,exp#3 (2nd av)observe inadequately installed/supported window a/c units. rmdy: maintain exterior bldg facade & appurtenances provi

    Oct 25, 2016

    Resolve
  • Class - 1

    Failure to take & provide safety measures(sidewalk shed,netting,etc) ewhere required to protect & secure public safety from unsafe facade as per 1rcny 103-04. facade technical report file unsafe by pe/re on 6/1

    Sep 23, 2016

    Resolve
  • Class - 1

    Failure to take & provide safety measures(sidewalk shed,netting,etc)where require to protect & secure public safety from documented unsafe facade as per 1rcny 103-04. facade technical report file unsafe by pe/r

    Sep 23, 2016

    Resolve
  • Class - 1

    Failure to take & provide safety measures where require to protect & secure public safety from documented unsafe facade as per 1rcny 103-04.noted: safety measures in place inadequate. missing parapet panels on

    Aug 18, 2016

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedi

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations

    Jun 4, 2010

    Resolve
  • Class - 1

    Cease use/16-i-10repair/replace lobby hoistway dr handle/2-l-10-repairalarm system

    Nov 15, 2009

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Dec 19, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Dec 19, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Dec 19, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Dec 19, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Dec 19, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Dec 19, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Dec 19, 2008

    Resolve
  • Non-hazardous

    66o02.66-elevator pit for elevator #1p24051 is dirty/accumulated paper,and other debris.

    Sep 3, 2004

    Resolve
  • Non-hazardous

    Work without a permit work noted:interior common area bldg walls opened exposed w/exposed interior bldg elements w/out a permit noted locations(1)common hallway south/east 2fl to 14th fls(2)adjacent hose lack 2

    Nov 10, 2003

    Resolve
  • Hazardous

    Failure to maintain noted defect:corridor wall open w/loose broken fragmented detached masonary members exposed interior and exterior commonwall units w/out temp coverage panel/or protective barrier.noted locat

    Nov 10, 2003

    Resolve
  • Non-hazardous

    5j1, 7302, 17r12, 50y14, 3i11. 17-with wire glass

    Apr 19, 1995

    Resolve
  • Non-hazardous

    9b7, 3i11, 73o2

    Apr 19, 1995

    Resolve
  • Non-hazardous

    30e, 74e. 74 remedy: noise in shaftway near top landing.

    Sep 9, 1992 · Penalty $1,000

    Resolve