roofy

Violations at 222 East 104 Street

Manhattan, NY 10029 · BBL 1-01652-7501 · Back to the property

HPD housing violations

30 HPD violations, newest first.

  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Aug 25, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Aug 25, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Aug 25, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Aug 25, 2026

    Open — Nov sent out
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 25, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Aug 25, 2026

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • BHazardous

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 25, 2025

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 13, 2025

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2024

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective connection drain pipe at sink in the kitchen located at apt 401, 4th story, 1st apartment from west at north

    Nov 2, 2024 · Apt 401

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 401, 4th story, 1st apartment from west at north

    Nov 2, 2024 · Apt 401

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 17, 2024

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair or replace the broken or defective rubber gasket seal at refrigerator and freezer doors. in the kitchen located at apt 902, 9th story, 2nd apartment from east at south

    Jun 28, 2023 · Apt 902

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 902, 9th story, 2nd apartment from west at north

    Jun 28, 2023 · Apt 902

    Open — Notice of issuance sent to tenant
  • BHazardous

    Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 902, 9th story, 2nd apartment from west at north

    Jun 28, 2023 · Apt 902

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 902, 9th story, 2nd apartment from west at north

    May 22, 2023 · Apt 902

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 28, 2022

    Open — Nov sent out
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Sep 28, 2022

    Open — Nov sent out
  • ANon-hazardous

    Replace with new the broken or defective rubber gasket seal at referigerator door in the kitchen located at apt 902, 9th story, 1st apartment from north at east

    Aug 10, 2022 · Apt 902

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 902, 9th story, 1st apartment from north at east

    Aug 10, 2022 · Apt 902

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1103, 11th story, 3rd apartment from north at east

    Jan 2, 2020 · Apt 1103

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 1103, 11th story, 3rd apartment from north at east

    Jan 2, 2020 · Apt 1103

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 26, 2018

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 11, 2017

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2016

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 20, 2015

    Closed — Violation dismissed

DOB building violations

23 DOB violations, newest first.

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2022

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 20, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 20, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 10, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 27, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 27, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 19, 2013

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 19, 2013

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 28, 2013

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed

ECB violations

30 ECB violations, newest first.

  • Class - 2

    Vf...hoist machine brake maintenance tag expired provide... a 17. 1.2013. 8.6.4.20..and 8.6.1.2.1.. maintenance log update missing. provide (mcp under 8.6.1..)

    Apr 24, 2026

    Resolve
  • Class - 2

    Vf.. hoist machine braeake maintenance tag expied.a17.1.2013. .8.6.4.20. and 8.6.1.2.1.. maintenance log update missing. provide..mcp 8.6.1...

    Apr 24, 2026

    Resolve
  • Class - 1

    5/l/10 car cease use class 1, car door restrictor is not working defective repair.

    Feb 18, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #917016. remedy: submit acceptable requ

    Apr 8, 2025 · Penalty $10,000

    Active
  • Class - 1

    Failure to have site safety manager present as required."partial stop work order"on all construciton work issued pursuant to 28-207.2 & posted at premises. upon inspection as noted no ssm available" general

    Apr 14, 2015 · Penalty $1,200

    Resolve
  • Class - 1

    Work w/o permit.at time of inspection observed, active job site.workers found performing construction operations at apprx 7:45am on saturdaymorning.the after hours variance permit states work allowance from 9am

    Feb 28, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Holes/opening not covered upon. inspection as noted at active construciton site up to roof level. there are holes & penetrations in both stairwells a & b of various sizes all levels: some holes measure approx

    Feb 26, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. upon inspection as noted at active construction site up to roof level there is an excessive amount of debris approx 30(3yds) accumulated throu

    Feb 26, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construciton: no guard rails:"partial stop work order" on all work w/i 10ft of interior elevator enclosure panels(curtain wall)exp#1 all leve

    Feb 26, 2015 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations "partial stop work order" on all electric panels hooked up to heaters bldg'a' issued pursuant to 28-207.2 & posted at premises.

    Feb 26, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to provide sitesafety manager at time of inspection.note obse rved active construction site work in progress under permit #1211811582st flr thru 11th flr and no site safety manager present.last entry fo

    Dec 4, 2014 · Penalty $1,200

    Resolve
  • Class - 2

    3310.6misc.vio.faiure to have designated site safety mgr. as indicate don pw-2 present at stie at a minimum of once very two weeks.exam.of site safety log for dates 9/29/14 to 11/05/14 indicates that site safet

    Nov 5, 2014

    Resolve
  • Class - 2

    3310.6misc.vio.failure to ahve designated site safety mgr as indicated on pw-2 present on site at a minimum of once every 2weeks.examination of site safety log for dates 9/29/14 to present 11-05-14indicates tha

    Nov 5, 2014 · Penalty $400

    Resolve
  • Class - 1

    Sec. 3314.5.5 platforms are not tied down as per code requirements. observed - approx 60' to 110'high scaffold erected at exp 1,2,3,& 4. loose planks at different level of scaffold. platforms are not tied down

    Sep 22, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Work does not conform to approved construction documents/amendments,observed pipe scaffold been erected approx 70' at exp 1 approx 110' at exp 2 & at exp 3 & 4 approx 70'h). no stair tower installed as per appr

    Sep 22, 2014 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to have site safety manager/coordinator prsent as required."full stop work order" issued pursuant to 28-207.2 and posted at premisesupon inspection as noted various trades on site variance permit#005415

    Aug 30, 2014 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. remedy: conform to code.

    May 27, 2014

    Resolve
  • Class - 1

    Inadequate safety measures operation of a crane in an unsafe manner. at time of inspection mr. saul c. herrera ny dl # 529184678 was operatiing a crane cd # 4409 that was configured to extend more than 200' wit

    May 27, 2014 · Penalty $4,800

    Resolve
  • Class - 1

    Inadequate safety measures operation of crane in an unsafe manner.@ time of insp.mr.saul c.herrera ny dl #529184678 was operating a crane cd#4409 that was configured to extend more than 200'w/o a nyc hmo licens

    May 27, 2014

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations.@ time of insp.mr.saul c.herrera ny dl#529184678(id) was operating crane(b)that was configured to extend over 200'w/o a n.y.c lice

    May 27, 2014

    Resolve
  • Class - 1

    Work does not conform to approved plans at time of inspec.observed pipe scaffolding erected at various locations of jose site.approved plans for supported pipe scaffold state guardrails,toeboards & netting are

    May 13, 2014 · Penalty $1,000

    Resolve
  • Class - 3

    Inspection of equipment - unable to produce inspection logs at time ofinspection. at time of inspection, i requested daily logs from operator license #8003 lifting and erecting steel, operator could not present

    Sep 19, 2013 · Penalty $150

    Resolve
  • Class - 1

    Inadequate safety measures operation of a crane in an unsafe manner, overloading crane, crictical pick. swo #09193rh01 at the time of inspection, operator lic #9024 used crane to lift known weight of 67201 lbs

    Sep 19, 2013 · Penalty $4,800

    Resolve
  • Class - 1

    Inadequate safety measures operation of a crane in an unsafe manner. overloading crane. (critical pick). swo #091913rh01 at time of inspection, crane was being used to lift known weight of 67,201 lbs when the

    Sep 19, 2013 · Penalty $4,800

    Resolve
  • Class - 2

    Sec. bc 3310.6 failure to have designated concrete safety manager at site - upon inspection noted the designated concrete safety manager (csm) for this job by signing pw-2 is fotis kiropoulos, lic #2201-cs.

    Aug 7, 2013 · Penalty $400

    Resolve
  • Class - 2

    Sec. bc 3310.6. failure to have designated site safety manager - @ site - upon inspection, construction of nb is in progress. at time of inspection noted the designated site safety manager for this jobbysigning

    Aug 7, 2013 · Penalty $400

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperation - upon inspection and information obtained from the site safety manager of the job, a worker while moving a steel beam w/the help

    Aug 7, 2013 · Penalty $2,400

    Resolve
  • Class - 1

    Work contrary to approved plan - upon inspection construction work of new bldg in progress. at time of inspection noted mobile crane at site& in use for erecting structural steel members.also noted the location

    Aug 7, 2013 · Penalty $1,000

    Resolve
  • Class - 1

    Work does not conform to approved partition documents or amendments. at time of inspection,observed job site fence not constructed as per site safety plans - approved site safety plans shows solid 8'fence with

    May 21, 2013 · Penalty $1,000

    Resolve
  • Class - 1

    Sec. 3307.7 failed to provide solid job site fence - at time of inspection observed approx 32' of chain link removable fence installed at exp 1 on e 104 st. this allows access onto site at any giving time.

    May 21, 2013 · Penalty $1,600

    Resolve