Violations at 222 East 104 Street
Manhattan, NY 10029 · BBL 1-01652-7501 · Back to the property
HPD housing violations
30 HPD violations, newest first.
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 25, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Aug 25, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Aug 25, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Aug 25, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 25, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 25, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 25, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection drain pipe at sink in the kitchen located at apt 401, 4th story, 1st apartment from west at north
Nov 2, 2024 · Apt 401
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 401, 4th story, 1st apartment from west at north
Nov 2, 2024 · Apt 401
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective rubber gasket seal at refrigerator and freezer doors. in the kitchen located at apt 902, 9th story, 2nd apartment from east at south
Jun 28, 2023 · Apt 902
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 902, 9th story, 2nd apartment from west at north
Jun 28, 2023 · Apt 902
Open — Notice of issuance sent to tenant - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 902, 9th story, 2nd apartment from west at north
Jun 28, 2023 · Apt 902
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 902, 9th story, 2nd apartment from west at north
May 22, 2023 · Apt 902
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 28, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 28, 2022
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective rubber gasket seal at referigerator door in the kitchen located at apt 902, 9th story, 1st apartment from north at east
Aug 10, 2022 · Apt 902
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 902, 9th story, 1st apartment from north at east
Aug 10, 2022 · Apt 902
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1103, 11th story, 3rd apartment from north at east
Jan 2, 2020 · Apt 1103
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 1103, 11th story, 3rd apartment from north at east
Jan 2, 2020 · Apt 1103
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 11, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 20, 2015
Closed — Violation dismissed
DOB building violations
23 DOB violations, newest first.
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 20, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 20, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 10, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 19, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 19, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed
ECB violations
30 ECB violations, newest first.
- Class - 2
Vf...hoist machine brake maintenance tag expired provide... a 17. 1.2013. 8.6.4.20..and 8.6.1.2.1.. maintenance log update missing. provide (mcp under 8.6.1..)
Apr 24, 2026
Resolve - Class - 2
Vf.. hoist machine braeake maintenance tag expied.a17.1.2013. .8.6.4.20. and 8.6.1.2.1.. maintenance log update missing. provide..mcp 8.6.1...
Apr 24, 2026
Resolve - Class - 1
5/l/10 car cease use class 1, car door restrictor is not working defective repair.
Feb 18, 2026 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #917016. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $10,000
Active - Class - 1
Failure to have site safety manager present as required."partial stop work order"on all construciton work issued pursuant to 28-207.2 & posted at premises. upon inspection as noted no ssm available" general
Apr 14, 2015 · Penalty $1,200
Resolve - Class - 1
Work w/o permit.at time of inspection observed, active job site.workers found performing construction operations at apprx 7:45am on saturdaymorning.the after hours variance permit states work allowance from 9am
Feb 28, 2015 · Penalty $1,600
Resolve - Class - 1
Holes/opening not covered upon. inspection as noted at active construciton site up to roof level. there are holes & penetrations in both stairwells a & b of various sizes all levels: some holes measure approx
Feb 26, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. upon inspection as noted at active construction site up to roof level there is an excessive amount of debris approx 30(3yds) accumulated throu
Feb 26, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construciton: no guard rails:"partial stop work order" on all work w/i 10ft of interior elevator enclosure panels(curtain wall)exp#1 all leve
Feb 26, 2015 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations "partial stop work order" on all electric panels hooked up to heaters bldg'a' issued pursuant to 28-207.2 & posted at premises.
Feb 26, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to provide sitesafety manager at time of inspection.note obse rved active construction site work in progress under permit #1211811582st flr thru 11th flr and no site safety manager present.last entry fo
Dec 4, 2014 · Penalty $1,200
Resolve - Class - 2
3310.6misc.vio.faiure to have designated site safety mgr. as indicate don pw-2 present at stie at a minimum of once very two weeks.exam.of site safety log for dates 9/29/14 to 11/05/14 indicates that site safet
Nov 5, 2014
Resolve - Class - 2
3310.6misc.vio.failure to ahve designated site safety mgr as indicated on pw-2 present on site at a minimum of once every 2weeks.examination of site safety log for dates 9/29/14 to present 11-05-14indicates tha
Nov 5, 2014 · Penalty $400
Resolve - Class - 1
Sec. 3314.5.5 platforms are not tied down as per code requirements. observed - approx 60' to 110'high scaffold erected at exp 1,2,3,& 4. loose planks at different level of scaffold. platforms are not tied down
Sep 22, 2014 · Penalty $1,600
Resolve - Class - 1
Work does not conform to approved construction documents/amendments,observed pipe scaffold been erected approx 70' at exp 1 approx 110' at exp 2 & at exp 3 & 4 approx 70'h). no stair tower installed as per appr
Sep 22, 2014 · Penalty $1,000
Resolve - Class - 1
Failure to have site safety manager/coordinator prsent as required."full stop work order" issued pursuant to 28-207.2 and posted at premisesupon inspection as noted various trades on site variance permit#005415
Aug 30, 2014 · Penalty $12,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. remedy: conform to code.
May 27, 2014
Resolve - Class - 1
Inadequate safety measures operation of a crane in an unsafe manner. at time of inspection mr. saul c. herrera ny dl # 529184678 was operatiing a crane cd # 4409 that was configured to extend more than 200' wit
May 27, 2014 · Penalty $4,800
Resolve - Class - 1
Inadequate safety measures operation of crane in an unsafe manner.@ time of insp.mr.saul c.herrera ny dl #529184678 was operating a crane cd#4409 that was configured to extend more than 200'w/o a nyc hmo licens
May 27, 2014
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations.@ time of insp.mr.saul c.herrera ny dl#529184678(id) was operating crane(b)that was configured to extend over 200'w/o a n.y.c lice
May 27, 2014
Resolve - Class - 1
Work does not conform to approved plans at time of inspec.observed pipe scaffolding erected at various locations of jose site.approved plans for supported pipe scaffold state guardrails,toeboards & netting are
May 13, 2014 · Penalty $1,000
Resolve - Class - 3
Inspection of equipment - unable to produce inspection logs at time ofinspection. at time of inspection, i requested daily logs from operator license #8003 lifting and erecting steel, operator could not present
Sep 19, 2013 · Penalty $150
Resolve - Class - 1
Inadequate safety measures operation of a crane in an unsafe manner, overloading crane, crictical pick. swo #09193rh01 at the time of inspection, operator lic #9024 used crane to lift known weight of 67201 lbs
Sep 19, 2013 · Penalty $4,800
Resolve - Class - 1
Inadequate safety measures operation of a crane in an unsafe manner. overloading crane. (critical pick). swo #091913rh01 at time of inspection, crane was being used to lift known weight of 67,201 lbs when the
Sep 19, 2013 · Penalty $4,800
Resolve - Class - 2
Sec. bc 3310.6 failure to have designated concrete safety manager at site - upon inspection noted the designated concrete safety manager (csm) for this job by signing pw-2 is fotis kiropoulos, lic #2201-cs.
Aug 7, 2013 · Penalty $400
Resolve - Class - 2
Sec. bc 3310.6. failure to have designated site safety manager - @ site - upon inspection, construction of nb is in progress. at time of inspection noted the designated site safety manager for this jobbysigning
Aug 7, 2013 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperation - upon inspection and information obtained from the site safety manager of the job, a worker while moving a steel beam w/the help
Aug 7, 2013 · Penalty $2,400
Resolve - Class - 1
Work contrary to approved plan - upon inspection construction work of new bldg in progress. at time of inspection noted mobile crane at site& in use for erecting structural steel members.also noted the location
Aug 7, 2013 · Penalty $1,000
Resolve - Class - 1
Work does not conform to approved partition documents or amendments. at time of inspection,observed job site fence not constructed as per site safety plans - approved site safety plans shows solid 8'fence with
May 21, 2013 · Penalty $1,000
Resolve - Class - 1
Sec. 3307.7 failed to provide solid job site fence - at time of inspection observed approx 32' of chain link removable fence installed at exp 1 on e 104 st. this allows access onto site at any giving time.
May 21, 2013 · Penalty $1,600
Resolve