Violations at 90 Lenox Avenue
Manhattan, NY 10026 · BBL 1-01596-0001 · Back to the property
HPD housing violations
28 HPD violations, newest first.
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the bathroom located at apt 13f, 13th story, 3rd apartment from north at east
Jul 14, 2016 · Apt 13F
Open — Nov sent out - BHazardous
Properly repair the broken or defective base cabinet at sink in the kitchen located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north, south and east walls in the kitchen located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the foyer located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the private hallway located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroom located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north, west and east walls in the 5th room from north located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 5th room from north located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south and east walls in the 4th room from north located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from north located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and east walls in the 1st room from north located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at south wall. approx. = 20 sq.ft. in the kitchen located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak at ceilings in the entire apartment located at apt 13g, 13th story, 4th apartment from north at east
Aug 13, 2015 · Apt 13G
Closed — Violation closed - ANon-hazardous
Properly secure the loose ceramic floor tile at radiator in the 3rd room from east located at apt 4g, 43rd story, 4th apartment from north at east
Nov 20, 2013 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings in the entire apartment located at apt 4g, 43rd story, 4th apartment from north at east
Nov 20, 2013 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4g, 43rd story, 4th apartment from north at east
Nov 20, 2013 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 4th room from east at south, the 3rd bathroom from east, the 4th room from east at north, the 1st room from east located at apt 13h, 13th story, 5th apartment from south at west
May 13, 2009 · Apt 13H
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 13h, 13th story, 5th apartment from south at west
May 13, 2009 · Apt 13H
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling in the 3rd bathroom from east located at apt 13h, 13th story, 5th apartment from south at west
May 13, 2009 · Apt 13H
Open — Nov sent out - BHazardous
Replace with new the broken or defective rotted wood base cabinets in the kitchen located at apt 2h, 2nd story, 1st apartment from west at north
Jan 19, 2006 · Apt 2H
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2h, 2nd story, 1st apartment from west at north
Jan 19, 2006 · Apt 2H
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 2h, 2nd story, 1st apartment from west at north
Jan 19, 2006 · Apt 2H
Open — Nov sent out - BHazardous
Properly repair the broken or defective south wall light fixture in the 1st room from north at west located at apt 2h, 2nd story, 1st apartment from west at north
Jan 19, 2006 · Apt 2H
Open — Nov sent out - BHazardous
Replace with new the broken or defective door in the 1st room from east at north located at apt 2h, 2nd story, 1st apartment from west at north
Jan 19, 2006 · Apt 2H
Open — Nov sent out - BHazardous
Properly repair the broken or defective window couter balance lower sash in the 1st room from north located at apt 2h, 2nd story, 1st apartment from west at north
Jan 19, 2006 · Apt 2H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 2h, 2nd story, apartment at north
Jan 19, 2006 · Apt 2H
Open — Nov sent out
DOB building violations
The newest 50 of 127 DOB violations. The city keeps the complete history.
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jan 24, 2020
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jan 24, 2020
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Oct 18, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jul 23, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jul 22, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jul 22, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jul 22, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jun 17, 2019
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Construction other optional
Changed approx 70% of joist beams on 2nd fl, on 3rd fl changed approx 30% of joist beam & removed fire rating of wall & ceilings
Oct 3, 2014
Vpw*-violation unserved ecb-work without permit-dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Nov 1, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed
ECB violations
The newest 50 of 89 ECB violations. The city keeps the complete history.
- Class - 2
Failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. at the time of inspection observed noted at 1st fl upk, near main entra
Aug 3, 2026 · Penalty $1,250
Resolve - Class - 2
@mechanical steam room in cellar the condensate tank is corroded+leaking+condensate tank vent is incorrect+steam trap is defective+steam coil gasket is defective, maintain boiler; correct violation+submit certi
Jun 11, 2026 · Penalty $1,250
Active - Class - 2
Condensate tank room in basement of 40 w 115 st has a gate valve that is leaking at the stem., maintain boiler; correct violating condition & submit a certificate of correction.
Mar 4, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905921.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905918.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905919.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905922.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905920.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905923.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905924.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905925.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905926.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#905927.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to take and provide safety measures such as sidewalk shed fence where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-04. facade technical report file unsafe
Mar 12, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to take and provide safety measures such as sidealk shed fence etc where required to protect and secure public safety from documented (unsafe) facade at the time of inspection observed no sfatey measure
Jul 13, 2020 · Penalty $10,000
Resolve - Class - 2
Failure to maintain building exterior walls/facade and appurtenances note at the tiem fo inspection observed at exposure 1 a/c unit supprot inadequate also observed viewing at pre school play ground exit area
Jul 13, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to take & provide safety measures such as sidewalk shed fence etc. where required to protect & secure public safety from documented unsafe facade as per 1rcny 103.04 facade technical report file unsafe
Feb 22, 2020 · Penalty $10,000
Resolve - Class - 2
Failure to maintain exterior bldg facade & appurtenances. note: exp#1,west elevation & exp#3 east elevation display 3 window air conditioning units installed w/improper support ie;wood pieces,tin cans etc.
Jan 6, 2020 · Penalty $1,250
Active - Class - 1
Failure to take & provide safety measures where required;ie sidewalk shed,fence protection,etc. to protect & secure public safety from a documented"unsafe"facade as per 1rcny 103-04. facade as per 1rcny 103-01
Jan 6, 2020 · Penalty $10,000
Resolve - Class - 1
Failure to take and provide safety measures-sidewalk shed,netting,etc where required to protect and secure public safety from documented "unsafe" facade as per 1rcny 103-04. facade technical report filed "unsaf
Jan 6, 2020 · Penalty $10,000
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. note:exposure 1,south elevation displays 3 window a/c units installed w/ improper support=wood,brick,tin cans etc. exposure 3,north elevation has
Jan 6, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building exterior walls/facades and appurtenances.exposure 1,west elevation:air conditioners supported by brick(4th story) and by plywood(9th story). exposure 4,south elevation:a/c supported
Oct 24, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide adequate safety measures,such as,shed,netting,etc-where required to protect and secure public safety from a documented unsafe facade-reported by the qewi on 10/15/19-as per 1rcny 103-04 note:
Oct 24, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to take and provide safety measures sidewalk shed netting etc.where required to protect and secure public safety from documented unsafe facade as per 1rcny.103-04 facade unsafe report tecnical filed by
Oct 23, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to maintain exterior facade. various location: 1-flower pots hanging form window sill (2nd fl, exp3) 2.a/c units missing brackets; 3-lintels rustings. rmdy: maintain exterior building provide
Jun 28, 2019
Resolve - Class - 2
Failure to maintain building in code compliant manner illumination forexits, exit discharges and public corridors per bc 1006.1; 27-381 at first floor room wo2 exit light box no.8, in room no.1 exit light box
Jun 10, 2019
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. *northelevation exp4, observed bent a/c units bracket on 13 fl; *observed inadequate a/c units on various locations on exp1; *observed damaged chi
May 2, 2019
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances. north elevation exposure 4,observed cracked masonry facade between 10th&11thfloors;bent a/c bracket on 13th fl. observed inadequate a/c units supp
Feb 14, 2019
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. east elevation exposure 1 observed inadequate a/c units supports on 2nd and8th floors. south elevation exposure 2 observed inadequate a/c units
Oct 31, 2018
Resolve - Class - 2
Failure to submit acceptable 8th found report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 control #805925. rmdy: submit required technical report.
May 18, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to submit acceptable 8th found report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 control #805924. rmdy: submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to submit acceptable 8th found report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 control #805918. rmdy: submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to submit acceptable 8th found report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 control #805927. rmdy: submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to submit acceptable 8th found report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 control #805920. rmdy: submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to submit acceptable 8th found report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 control #805923. rmdy: submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to submit acceptable 8th found report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 control #805921. rmdy: submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to submit acceptable 8th found report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 control #805919. rmdy: submit required technical report.
May 18, 2018
Resolve - Class - 2
Unapproved, unsafe, unsuitable electrical equipments, apparatus, materials, devices, appliances on wiring in use. apt 12k kitchen: open wiring one in use, box is not secured. "please note" this is not a final i
Nov 3, 2017
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: high rise to provide exit sign requirements. noted: @ exits, labling missing, exits not properly labeled. rem: comply w/ code.
Sep 21, 2016
Resolve - Class - 1
Sec. 3314.4.5.4 training for suspended scaffold fraudulent training card. noted: at time of inspection following worker: andrzej skoczek working on suspended scaffold w/fraudulent training card. remedy: discont
Jul 23, 2015 · Penalty $1,600
Resolve - Class - 2
3314.16.4 partial swo issued for angie suspended scaffolds pursuant 28-207.2 & posted on premises.failed to have angie scaffold insp.by the dept prior to use.noted:@ time of insp.2,angie scaffolds are being use
Dec 4, 2014 · Penalty $400
Resolve - Class - 2
Sidewalk shed does not meet code specification. noted: at time of inspection: approx 9:30pm,shed has inoperable/not lit light fixtures underneath of shed. at exp #1. remedy: conform shed to code specifications.
Aug 1, 2013 · Penalty $2,400
Resolve - Class - 2
67-m-07/67-m-07-provide communication as per code"k3"3.11.1(b)
Aug 23, 2011
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial repa
Dec 17, 2010
Resolve - Class - 2
Failure to file an amnded sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. 36011372z remedy: file an amended report follow
Jun 25, 2010
Resolve - Class - 1
29i10,07l10. 29i- repair door operator. drive area of chain. secure drive arm & replace chain. 07l- repair safety edge call dob 212-566-5544for reinspection.
Jun 23, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
May 10, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
May 10, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
May 10, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
May 10, 2010
Resolve