Violations at 240 East 76 Street
Manhattan, NY 10021 · BBL 1-01430-7501 · Back to the property
HPD housing violations
5 HPD violations, newest first.
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at 1st story public hall and outside door of the boiler room
Aug 11, 2020
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 11, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 11, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 11, 2020
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 11, 2020
Open — Nov sent out
DOB building violations
32 DOB violations, newest first.
- Plumbing none
Based on commissioners suspension notification on 2/28/2024 intends to revoke all plumbing approvals and permit issued under job #m00910772 due to suspension of license master plumber # 002245 stop all plumbing work under above mentioned permit immediately
Mar 11, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Plumbing none
The dob intends to revoke all approvals and permits under plumbing laa #140026914 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Nov 23, 2018
Dob violation - active - Plumbing none
The dob intends to revoke all approvals and permits under plumbing laa #140442224 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Aug 12, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 16, 2009
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2005
Dob violation - resolved
ECB violations
20 ECB violations, newest first.
- Class - 2
28-323.1. failure to maintain parking structure in safe condition. note: at time of inspection on an occupied parking structure consisting aof 1 level below grade level, i observed (1)crakced brick/loose materi
Feb 22, 2025 · Penalty $3,125
Resolve - Class - 1
28-201.1 tenant protection plan inadequate for scope of work.note at time of inspection at above premise observed workers working under job#m08054993 however not enough information on tpp to protect tenants for
Mar 9, 2023 · Penalty $2,500
Resolve - Class - 1
3303.10 tenant protection plan not being complied with.note at time ofinspection at above premise observed construction activity in unit 15kand 15l.no drop cloth door barriers and wet mats in front of unit and
Mar 9, 2023 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection does not meet code specification at time of inspection of active jobsite observed sidewalk shed erected at exp #1 #3 #4 & exposed bolts not capped creating unsafe condition for pedestrians
Apr 5, 2022 · Penalty $2,400
Resolve - Class - 2
Pedestrian protection does not meet code specification at time of inspection of active jobsite 17 story building observed sidewalk shed erected at exp #1 #2 #4 sws not tight to building facade & not sealed as r
Apr 5, 2022 · Penalty $2,400
Resolve - Class - 1
Failure to designate or have site safety manager or coordinator as required.at time of inspection of active jobsite at 17 story building observed not site safety manager was designated in dept records building
Apr 5, 2022
Resolve - Class - 1
Failure to notify the dept. of an accident/incident that resulted in afatality or an injury.note:a worker on the top of the sidewalk shed lost control of a clip.the clip hit the head of a pedestrian who suffere
Nov 24, 2021 · Penalty $2,500
Resolve - Class - 1
Sec. 3310.4 site safety monitoring. at time of inspection on a facade jobsite inspection reveal,jobsite was not filed as a site safety job. failure to file on the write permit for the job create an unsafe condi
Oct 12, 2021
Resolve - Class - 1
3310.3 site safety plan at time of inspection responding to an incident where a pedestrian got injure when a fist grip fell of the sws bridge and hit the pedestrian on her head inspection reveal.site safety pla
Oct 12, 2021
Resolve - Class - 1
Failure to have site safety manager when required to be designated. attime of inspection responding to an incident where a pedestrian got injure when a fist grip fell of the sws bridge & hit the pedestrian on
Oct 12, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specification. at time of inspection responding to an incident where a pedestrian got injure when afist grip fell of the sws bridge & hit the pedestrian on her head. ins
Oct 12, 2021
Resolve - Class - 1
Failure to institute & maintain safety equipment measure & temporary construction. note: at time of inspection responding to an incident where a pedestrian got injure when a fist grip fell of the sws bridge &
Oct 12, 2021
Resolve - Class - 1
As per one federal boiler, fst-250. serial no. 10658. boiler cease used: excessive soot and smoke from boiler at chimney.
Aug 13, 2021 · Penalty $1,250
Active - Class - 2
As per one federal boiler fst-250. boiler no. 15781-01. boiler smoking and emitting soot.
Aug 13, 2021 · Penalty $625
Active - Class - 2
Failure to submit an acceptable 6th round technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules & regulations.
Dec 12, 2008
Resolve - Non-hazardous
50 columbia vt boiler 20hp, nb138991 50 no drain line on the gauge glass assembly install a drain line & pipe to a safe point of discharge
Oct 20, 2007
Resolve - Hazardous
Failure to cmply with exhaust location reference standart 13-2.1.4 must be installed min 10' above sidewalk noted exhaust from bldg location@ sidewalk approx 3' from ground.remedy:comply exhaust location
Oct 6, 2006
Resolve - Non-hazardous
38,48b,40. 1988 columbia natl bd 138991
May 10, 2004
Resolve - Non-hazardous
16, 49, submit proof of registration (approved 900-a) for this high pressure boiler columbia nb 138991 year 1998
Oct 16, 2001 · Penalty $180
Resolve - Non-hazardous
Handholes slleve severely corroded flames and fumes escaping in the boiler room. certificate of boiler inspection was not displayed and was not produced.
Feb 6, 1990 · Penalty $250
Resolve