5 East 62 Street
Manhattan, NY 10065BBL 1-01377-0007Map
Owner of record: Fifth Avenue Synagogu
5 East 62 Street is a religious facility built in 1956 in Manhattan, 10065. The owner of record is Fifth Avenue Synagogu. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 23
- ECB violations
- 7
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 23
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 28, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 3, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 22, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 6, 2011
Dob violation - resolved
Show 13 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 16, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 26, 2007
Dob violation - resolved - Elevator elevatorrequired
1p23933
May 15, 2000
Dob violation - resolved - Elevator elevatorrequired
1p23933
Aug 2, 1999
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Public assembly none
Pa-public assembly none
Mar 22, 1990
Dob violation - dismissed - Public assembly none
Pa-public assembly none
Mar 22, 1990
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 28, 1989
Dob violation - dismissed
ECB violations · 7
- Class - 2
Bc3307.6.4.7 passageway under shed less than 8 feet high.note:at time of inspection of 6 story building observed that sidewalk shed at exp #1 passageway under shed less than 8 ft clear height creating unsafe co
Sep 20, 2021 · Penalty $620
Resolve - Class - 2
Bc3309.10 protection of roof.note:at time of inspection of 6 story building aprox 7 feet over adjacent property roof at exp #3 observed no roof protection in place for adjacnet property as required.failure to p
Sep 20, 2021 · Penalty $620
Resolve - Class - 1
Work contrary to plan (material hoist)at time of inspection of active 6 story alt 1 with aprox 25 workers on site observed material hoist in use located 1 story to 5 story level.requested plans provided but ina
Sep 14, 2021 · Penalty $2,500
Resolve - Class - 1
Work doesnt conform to approved const docs &/or approved amendments.atoi of 6styalt1 active jobsite,observed working platform installed on 3fl.upon rev of approved design drawings observed that platform doesnt
Jul 7, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000000707 has been inspected,tested & disinfected & that a maintenance plan has been developed & implemented by november 1,2016. rem: file annual certifi
Jun 20, 2017
Resolve - Non-hazardous
Work w/o a permit:work noted:interior demolition of walls & ceiling atcellar level approx 2000 sqft work is approx 50% complete.remedy:stop all work except to make safe.obtain stop work rescind order(all proper
May 17, 2007
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o note supt & son living in room on 5th floor rear remedy remove illegal occupancy return to prior use
Apr 30, 1993
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Religious facility (M1)
- Year built
- 1956
- Floors
- 5
- Residential units
- —
- Building area
- 9,159 ft²
- Lot area
- 5,021 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 4
- Block / lot
- 1377 / 7
- Assessed value
- $6,261,300
- Landmark / historic district
- Upper East Side Historic District
Questions about 5 East 62 Street
Who owns 5 East 62 Street?
The owner of record in NYC Department of City Planning PLUTO data is Fifth Avenue Synagogu.
Does 5 East 62 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 5 East 62 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 5 East 62 Street built?
City records list 1956 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.