- HPD violations
- 0
- DOB violations
- 24
- ECB violations
- 38
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 24
- Construction other optional
Borough commissioner has issued a stop work order for job # 123812525 due to superintendent's withdrawal.
Apr 18, 2022
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 15, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 22, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 10, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2006
Dob violation - resolved
Show 14 more ↓
- Elevator elevatorrequired
1p8081
Apr 4, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2003
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p8081
Jan 31, 2002
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Elevator elevatorrequired
1p8081
Jan 2, 2001
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 1989
Dob violation - resolved - Zoning none
Z-zoning none
Nov 2, 1988
Dob violation - dismissed
ECB violations · 38
- Class - 1
28-110.2 phased site safety plan/ssp does not reflect street operations.at time of inspection of active 4 story building observed on street small man lift parked at left side of exp #1 not inside designated are
Dec 10, 2021 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved plans-supported scaffold.at time of inspection of active jobsite under alt permit #123812525 observed supported scaffolding at exp #3 aprox 60ft makeshift bicycle extension not
Dec 10, 2021 · Penalty $2,500
Resolve - Class - 1
Work does not conform to plans/suspended scaffold contrary to cd5.at time of inspection of active 4 story building observed suspended scaffold at exp #4 compared to approved plan hung scaffold did not conform
Dec 10, 2021 · Penalty $2,500
Resolve - Class - 1
Work contrary to plan (shoring) atoi of 5styalt1 active w/aprx25workers onsite requested for shoring plans/details,provided but inadequate plans show shoring on 2nd,3rd,4th,5th level.i observed shoring on 1sty
Oct 1, 2021 · Penalty $2,500
Resolve - Class - 2
Work does not conform to construction documents and/or approved amendments.at time of insepction of 5 story building observed configuration shoring that does not match approved drawings or documents also single
Jul 19, 2021
Resolve - Class - 2
Work does not conform to construction documents and/or approved amendments.at time of inspection of 5 story building observed sidewalk shed installed missing double junior beams below pip scaffold lags as per d
Jul 19, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specification.at time of inspection of 5 story building observed deteriorating planks on top of sidewalk shed deck.remedy:comply with code.
Jul 19, 2021 · Penalty $2,430
Resolve - Class - 1
Bc33144-supported pipe scaffold not installed,maintained as per code.at time of inspection of active 5 story alt2 job site,observed supported scaffold installed at exp#1,2 and 3 not as per code.supported scaffo
Jun 7, 2021 · Penalty $2,500
Resolve - Class - 1
Bc33152-platforms.at time of inspeciton of 5 story alt2 active job site observed platform at exp#1 to access the supported scaffold from building floor of multiple locations from 1st floor to 5th floor not as p
Jun 7, 2021 · Penalty $625
Resolve - Class - 1
Bc3301.13.13. log book not adequately maintained.at time of inspection of 5 story under alteration active job site observed over 20 workers on site.upon request of construction super intendent logs none were pr
Jun 7, 2021 · Penalty $2,500
Resolve
Show 28 more ↓
- Class - 2
Bc 3301.2 safety measures not in place. at time of inspection of 5 story active jobsite with over 20 workers on site observed not code compliant supported scaffold at exp #1,2,4 that leads to unsecured and unpr
Jun 7, 2021
Resolve - Class - 1
Failure to communicate required information to workers during pre-shift safety meeting.at time of inspection of 5 story building under alteration active jobsite with supported scaffold at exp #1,3,4 observed ac
Jun 7, 2021
Resolve - Class - 2
Housekeeping.at time of inspection of 5 story active jobsite observed construction materials,debris from demolition,equipment and wires garbage in multiple locations throughout including roof and supported scaf
Jun 7, 2021
Resolve - Class - 1
Failure to conduct a site-specific safety orientation program for all workers at time of inspection 6 story building observed active construction site upon request site safety orientation for worker valentin di
Apr 6, 2021 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction documents.at the time of my inspection of a 6 story building at 4 floor observed cut c-joist modified c-joist does not conform to approved detail design drawing fo
Apr 6, 2021 · Penalty $2,530
Resolve - Class - 1
3301.6 design sites and capacity of material structures temporary construction and equipment at time of my inspection of a 6 story building at ground level observed temporary staircase to basement and it's only
Apr 6, 2021 · Penalty $2,500
Resolve - Class - 2
3301.1 unsafe use of ladder note@time of insp i observed ladder in pitnot to osha standards.comply w/code-bring ladder to osha standards.
Feb 16, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specification note:at the time of inspection observed 3 sty occupied building have a sidewalk shed at exp1.but sidewalk shed does not cover full width of sidewalk in fro
Feb 16, 2021
Resolve - Class - 1
Failure to maintain display onsite documents required by bc chapter 33-design drawings(no approved drawing for temporary shoring) at basement level. noted:at time of inspection of a 5 story alteration active jo
Feb 9, 2021 · Penalty $2,500
Resolve - Class - 1
Work doesn't conform to approved const docs &/r approved amendments-temp shoring noted:@time of inspection of 5styalt/active jobsite i observed temp shoring installed@2ndfl level.14" steel ibeams bracing on exi
Feb 9, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3303.9 failure to maintain required means of egress&other elements in existing bldg under construction alts-egress obstructed noted:@time of inspection of 5styalt active jobsite i observed scaffolding stairca
Feb 9, 2021 · Penalty $2,500
Resolve - Class - 2
Bc3303.7.2 failure to comply w/nyc fire code-fire extinguishers/inadequate tags/locations on fls noted:@time of inspection of 5styalt activejobsite i observed multiple fire extinguishers thruout bldg&on support
Feb 9, 2021
Resolve - Class - 1
3309.2license to enter adjoining property.@time of insp of an active josbite observed,there was scaffold @exp #2erected in adj bldg @225east51 street.mh w/o legal documents to accessing or use the adj bldg,when
Sep 23, 2020 · Penalty $2,500
Resolve - Class - 1
3301.1failure to maintain site document required by bc chapter 33@timeof insp of an active jobsite observed @exp 1 on the street there were (jersey)barriers around storage area,upon request by design drawing,no
Sep 23, 2020 · Penalty $2,500
Resolve - Class - 1
Sec. 3303.9 existing standpipe not in state of readiness. note: at time of my inspection of on 5 stys bldg under partial demo & interior removation i observed an existing standpipe system in place not in the
Jul 29, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persosn and property affected by construction operations note at time of my inspection of a 5 stoyr building under facade repair in response to complaint of incident when a worker on su
Jul 15, 2020 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction document note at time of my inspection of a 5 story building under facade permit i observed supproted scaffold with debris neeting and additional (white) tarp used
Jul 15, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3301.2-failure to maintain overhead protection note at time of inspection of 5 story building under facade repair i observed a worer using suspended scaffold 10 feet above ground when a pipe scaffold 10 feet
Jul 15, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3301.6= no design drawings-platform.noted at time of my inspection of an alteration-2, 5 strroy building construction in progress i observed is wood platform on the 4th floor approx 15ft x10 ft made of plywoo
Mar 9, 2020 · Penalty $2,530
Resolve - Class - 1
Failure to maintain/display on site docuemnts required by chapter -33 site safety plan noted at time of inspection of s 5 story alteration construction in progress i aksed the superientdnent if i could review t
Mar 9, 2020 · Penalty $2,530
Resolve - Class - 2
Bc3314.1-supported scaffold not as per code.noted at time of my inspection of an lateration-2,5 story building construction in progress i observed a supported scaffold at exposure #1 whcih had a gap .space appr
Mar 9, 2020 · Penalty $1,280
Resolve - Class - 2
Bc3303.16=contractors shed fire reardant treated noted at time of inspection of an alteration-2.5 story building constuction in progress i observed 2 contractor shed on the ground adn 2nd floors whcih were no
Mar 9, 2020 · Penalty $1,280
Resolve - Class - 1
Bc3309.1=failure to protetct adjoining structures noted at time of inspection of an alteration-2, 5 story building construction in progress i observed teh adjoining properties at exposure #2 + 4 were not adequ
Mar 9, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3314.1-suspended scaffold not as per code noted at time of my inspection of an alteration type-2. 5 story buidling construction in progress i observed a suspended scaffold at exposure #4 which had the cable d
Mar 9, 2020
Resolve - Class - 2
Failure to file annual cert that cooling tower 1000001168 has been inspected, tested, & disinfected, & that a maintenance plan has been developed & implemented, by november 1,2016.rem:file annual cert.
Jun 20, 2017 · Penalty $2,000
Resolve - Non-hazardous
66z09. 66- remove oil & water from pit. also properly secure sub pumpin pit.
Apr 27, 2006
Resolve - Non-hazardous
17b 40o 40b 22m 74m 17 b 03 install vision panel grill on hl doors were needed 40 b 15 shorten gov rope 22 m 07 provide top exit cover 74 m 07 cross head data plate provide
Feb 9, 1999
Resolve - Hazardous
Sidewalk shed does not meet building cob specification permit. noted: no lights. erected at finish. remedy:conform to building dept. code specification.
Aug 16, 1993 · Penalty $1,000
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O2)
- Year built
- 1920
- Floors
- 5
- Residential units
- —
- Building area
- 18,600 ft²
- Lot area
- 3,682 ft²
- Zoning
- R8B
- Community board
- 106
- Council district
- 4
- Block / lot
- 1325 / 17
- Assessed value
- $4,485,150
- Landmark / historic district
- No
Questions about 231 East 51 Street
Who owns 231 East 51 Street?
The owner of record in NYC Department of City Planning PLUTO data is 231 E. 51st Street LLC.
Does 231 East 51 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 231 East 51 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 231 East 51 Street built?
City records list 1920 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.