roofy

2160 Broadway

Manhattan, NY 10024BBL 1-01168-0021Map

Owner of record: 2160 Broadway LLC

2160 Broadway is a store building built in 1920 in Manhattan, 10024. The owner of record is 2160 Broadway LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
23
ECB violations
34
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 23

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Construction other optional

    Vehicle impacting sidewalk shed

    Jul 29, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 28, 2019

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 29, 2015

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 3, 2013

    Dob violation - resolved
Show 13 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 24, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 22, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 28, 2010

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Mar 9, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p17995

    Nov 7, 2002

    Dob violation - active
  • Elevator elevatorrequired

    1p17999

    May 30, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    1p17995

    May 30, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    1p17996

    May 30, 2000

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 6, 1998

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 27, 1991

    Vp-violation unserved ecb-active

ECB violations · 34

  • Class - 1

    At time of inspection, observed foundation wall at exposure #3 partially demolished. upon review of approved construction documents, no details were provided for the demolition work performed, contrary to ac 28

    Oct 20, 2026 · Penalty $2,500

    Active
  • Class - 1

    Observed proposed 13 story nb in excavation/demo phase, at time of inspection drilling operations were taking place on exp 2. vibration monitoring that exceeded threshold was not notified to the dept. these con

    Oct 13, 2026 · Penalty $2,500

    Active
  • Class - 1

    Observed proposed 13 story nb in excavation/demo phase, at time of inspection drilling operations were taking place on exp 2. upon request of approved plans, no approved plans were provided to reflect drilling

    Oct 13, 2026 · Penalty $2,500

    Active
  • Class - 2

    At time of inspection, observed an office trailer installed at the construction site that was not indicated on the approved site safety plan, potentially interfering with planned site safety measures and creati

    Oct 12, 2026 · Penalty $1,250

    Active
  • Class - 2

    At time of inspection, observed standing water within active excavation during foundation and drilling operations, creating potential soil instability, contrary to bc 3303.14.3. remove accumulated water from e

    Oct 12, 2026 · Penalty $2,500

    Active
  • Class - 2

    At time of inspection, observed a hose lying directly across the public sidewalk at the construction site entrance without protective covering or a pedestrian bridge, obstructing the pedestrian walkway and crea

    Oct 12, 2026 · Penalty $2,500

    Active
  • Class - 1

    Failure to comply with 15 rcny 20-08. demolition operation connected split and hoses to the fire hydrant on west 76 street without backflow prevention equipment in contrary with dep's rules and requirements for

    Apr 15, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Full demolition of a 4 story building active site, partially demolished. observed adjoining property wall with 4 ft step crack loose exterior wall/voids cracks without crack monitoring gauges existing 2 yellow

    Apr 2, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Demolition of a 4 story building active site. partially demolished. observed workers on steel beams at exp#4 performing torching/cutting sparks flames without hot work permits issued onsite contrary to fdny fir

    Apr 2, 2026 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to comply and maintain as per code specifications 3314.1, 3314.4.3.2, 3314.9.2, 3314.8.1. observed supported scaffold on 3rd floor interior level was missing essential components "mudsills, guardrails,

    Mar 4, 2026 · Penalty $5,000

    Resolve
Show 24 more ↓
  • Class - 2

    Observed supported scaffold with multiple planked platforms at expo# 1 & 4 the scaffold was not tied to the structure as per plan , this condition warrants an ecb violation , comply with code stop all use of th

    Feb 25, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Observed snow on top of sidewalk shed at expo's # 1 & 4 this condition poses a potential hazard walking pedestrians that are walking underneath the sidewalk shed ( weight of the snow can cause collapse of sca

    Feb 25, 2026 · Penalty $2,400

    Resolve
  • Class - 2

    Observed at a demolition 4 story building a sidewalk shed installed at the perimeter of the building. at exposure #4, a fire hydrant/standpipe connection was present with no red light or required illumination i

    Jan 12, 2026 · Penalty $2,400

    Resolve
  • Class - 1

    At time of inspection of a 4-story building,active demolition jobsite i observed jobsite using fire hydrant on west 76 street upon requesting permit for use of fire hydrant none was found or available as per co

    Oct 30, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection, observed work zone beneath sidewalk shed missing required fencing and barriers; and barriers not interlocked and area accessible to public. contrary to bc 3307.4.7, failure to provide req

    Oct 28, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection of a 4 stories building under demolition activities i observed debri chute installed and mounted on supported scaffold and cross over sidewalk shed into the container on the street upon re

    Oct 27, 2025 · Penalty $625

    Resolve
  • Class - 1

    Note: at time of inspection, i observed demolition operations had been commenced without the required notification to the department, also inadequate notification was giving to the adjoining property, (descript

    Oct 17, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Note: at time of inspection ongoing demolition operations, i observed a supported pipe scaffold erected on top of the sidewalk shed, upon request for the pe load-imposed letter to verify structural adequacy of

    Oct 17, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    Note: at the time of inspection, i observed that demolition operations had commenced without the prior removal of glass from windows and doors, contrary to code 3306.9.8.3. this poses significant safety hazards

    Oct 17, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    Note: at the time of inspection, construction debris and materials were observed scattered throughout the floor areas on levels 1, 2, and 3. this condition creates multiple safety hazards including increased ri

    Oct 17, 2025

    Resolve
  • Class - 3

    Work does not conform to aproved construction documents &/or approved amendments. work noted 2 a/c units compressors installed on roof underpermit #122830482 locations of these 2 units are not conforming to app

    Nov 29, 2016 · Penalty $100

    Resolve
  • Class - 2

    Work does not conform to approved plans.(supported scaffold)noted: at time of my inspection plans show that exp 4 of the scaffold shall haveonly 1 full planked. main level & only 6 planked bracket main level &

    Jan 21, 2015

    Resolve
  • Class - 1

    Sec. 3314.8.1 pswo issued & posted at service entrance were permits are posted. supported scaffold does not meet code specifications. noted:at time of my inspection the scaffold was missing end rails,midrails,

    Jan 21, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Partial swo issued for over the sidewalk chute ursuant 28-207.2 and posted on premises failed to obtain permit for temporary construction equipment. noted: at time of inspection over the sidewalk chute is insta

    Sep 9, 2014 · Penalty $830

    Resolve
  • Class - 1

    Failure to safeguard public and property effected by construction operations noted pump truck hose on sidewalk person also fell tripping on hose no flagperson no dot permits to occupy street no safeguard in pla

    Sep 22, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard public and property affected by construction operations concrete truck blocking 2 lanes of street no dot permits no flag person at street diceeting traffic concrete being poured into concre

    Sep 22, 2009 · Penalty $2,400

    Resolve
  • Non-hazardous

    73m#. device no 1p8910 is under dismantle status dept of build record shows however my inspection rieveals device was removed illegally propelly file weth the dept of building.

    May 20, 2002

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall noted:west parapet wall at 4th floor elevation has step cracks begining at the corners and ascending towards center and leveling off approximately 2'0'from top of pa

    Mar 1, 2001 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain bldg wall (hazardous)(exterior)noted:west parapet at the 4th floor elevation has step cracks beginning at the corners and ascending upward toward the center of bldg and leveling off approx 2

    Oct 16, 2000 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain exterior bldg. wall.noted:west parapet at the 4th fl. elevation has step cracks beginning at the corners and ascending upward toward the center of bldg. and leveling off. approx. 2' down fro

    Jun 14, 2000

    Resolve
  • Non-hazardous

    Failure to maintain: failure to provide self closing fire-rated doors at open elevator shaft at 1st floor. remedy: seal, open elevator shaft or provide fire-rated self closing doors.

    Aug 27, 1991 · Penalty $1,000

    Resolve
  • Non-hazardous

    Pa contrary to approved plan. remedy: obtain approved plans.

    Jan 24, 1990 · Penalty $400

    Resolve
  • Non-hazardous

    Pa contrary to approved plan. remedy: amend pa palns shows changes.

    Dec 1, 1989 · Penalty $400

    Resolve
  • Unknown

    Work without a permit installation of a fire extinguishing system firststory kitchen rear basement kitchen center location alameda restaurant remedy obtain a permit & approvals

    Dec 1, 1988 · Penalty $250

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K7)
Year built
1920
Floors
4
Residential units
—
Building area
8,820 ft²
Lot area
2,210 ft²
Zoning
C4-6A
Community board
107
Council district
6
Block / lot
1168 / 21
Assessed value
$3,827,700
Landmark / historic district
No

Questions about 2160 Broadway

Who owns 2160 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is 2160 Broadway LLC.

Does 2160 Broadway have violations?

NYC HPD has no housing violations on record for this property.

Is 2160 Broadway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2160 Broadway built?

City records list 1920 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.