1841 Broadway
Manhattan, NY 10023BBL 1-01113-0018Map
Owner of record: Global 1845 Broadway LLC
1841 Broadway is an elevator apartment building built in 2021 in Manhattan, 10023. It has 123 residential units across 27 floors. The owner of record is Global 1845 Broadway LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 88
- ECB violations
- 45
- HPD complaints
- 5
Available now in this building
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 88
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - dismissed
Show 40 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2020
Dob violation - resolved - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 2018
Dob violation - resolved - Construction other optional
Borough commissioner ordered all work stopped for job # 140650356 due to revocation of filing privileges of applicant on record
May 10, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)
Jun 1, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2014
May 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 12, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 12, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 12, 2015
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2011
Dob violation - resolved
ECB violations · 45
- Class - 1
Vf... cease used... door restrictor not working. repair and arrange inspection with d o b ...
Feb 19, 2026 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #903373. remedy: submit acceptable requ
Apr 8, 2025
Resolve - Class - 2
Observed pipe scaffold erected at cellar level missing guardrail system. failure to provide guardrails as required creates a fall hazard to workers and persons accessing pipe scaffold. stop all use of pipe scaf
Oct 19, 2022 · Penalty $1,250
Resolve - Class - 1
At time of inspection i observed missing circuit breaker cover panel at 22 story creating a hazardous condition to workers and persons accessing that area from potential electrical shock resulting in injury or
Oct 19, 2022 · Penalty $2,500
Resolve - Class - 2
Observed holes larger than 2 inches on concrete slabs throughout jobsite at different locations creating a hazard to workers and persons below from falling material and or debris resulting in injury.provide and
Oct 19, 2022 · Penalty $1,250
Resolve - Class - 1
No competent person(cp)with 32hr suspended scaffold(ss) card designated by the engineer(pe) i observed 27st nb with active use of the multipoint ss at exp 1+2 on the 26fl. upon many requests to see who is the d
Oct 12, 2022
Resolve - Class - 2
Inadequate designs drawings(dd)-clarity of plans-multipoint suspended scaffold(mss) i observed active use of mss on 26fl. mechanical turnbuckle(inboard)and cable rings(outboard) no detail on the plans(size of a
Oct 12, 2022
Resolve - Class - 2
I observed 27st nb with active use of multipoint suspended scaffold(mss). upon request to view daily preshift report(bc3314.4.3.4), pre installation(3314.4.3.1) and post installation(3314.4.3.2) letter, none wa
Oct 12, 2022 · Penalty $1,250
Resolve - Class - 2
Corner scaffold(csf)not inspected by dob prior to use i observed 27st nb with active use of multipoint suspended scaffold(mss). at corner of exp1,2 mss has been configured to be used as a csf. no inspection by
Oct 12, 2022
Resolve - Class - 1
Inspection of a 27 story nb. i observed corner angle suspended scaffolding in place/use at exp1,4. upon research in bis/dobnow department record it was observed that the contractor failed to have a department i
Sep 26, 2022 · Penalty $2,500
Resolve
Show 35 more ↓
- Class - 2
Failure to institute&maintain safety measure note:atoi in response to incident where aluminum panel set for deck fell (aprx)10'ht from 4fl deck&struck worker on head when he was stripping column on 3fl,ambulanc
Feb 2, 2022
Resolve - Class - 2
Failure to institute&maintain safety measure note:atoi in response to incident where aluminum panel set for deck fell from 4fl deck (aprx10'h)&struck worker on head when he was stripping column on 3fl ambulance
Feb 2, 2022 · Penalty $5,000
Resolve - Class - 2
Nycac 28-116.2.3 failure to provide an adequate inspection program tr1. as noted:at time of audit the proposed tr1 special inspection report,we observed desimone consulting engineer performed concrete-cast-in-p
Oct 7, 2021
Resolve - Class - 2
Bc3305.3.2.1 failure to provide approved p.e. stay form details for major building.noted:at time of inspection of active construction site at foundation phase observed stay form erected aprox 23 ft for supporti
Sep 22, 2021
Resolve - Class - 2
Bc3303.14.2-standing water (drainage of excavation) at the time of my inspection of an active jobsite observed excavation operation in progress and all excavation shall be drained and the drainage shall be main
Apr 15, 2021 · Penalty $1,250
Resolve - Class - 1
Bc3310.5.1-notification onto the department of the primary manager or coordinator at the time of a active jobsite at 27 story new building observed excavation operation on progress and when i reviewed the site
Apr 15, 2021 · Penalty $625
Resolve - Class - 1
Bc3309.0-weatherproofing integrity of adjoining building at the time of my inspection of an active jobsite observed at exposure #2 excavation operation in progress and teh adjacent building foundation in approx
Apr 15, 2021
Resolve - Class - 2
27-929.1 ac27-929.1,failure to complete installation of full system ofautomatic sprinklers&file sprinkler report prepared by registered design professional in office bldg 100' or more in ht in existence on10/22
Mar 30, 2021
Resolve - Class - 2
3307.6.4.4-vertical post of sidewalk shed at vehicular access point not identified with high visibility markings note at the time of my inspection of an active jobsite jobsite observed dump truck backing up thr
Sep 29, 2020
Resolve - Class - 2
Bc3314.3.4-loads imposed letter(supported scaffold on a sidewalk shed) at the time of inspection of an activ jobsitt observed sidewalk shed at exposure #1 & 2 on top of sidewalk shed pipe scaffold was installed
Sep 29, 2020 · Penalty $625
Resolve - Class - 2
Temporary construction equipment onsite-expired permit.note:at time ofinspection observed permit expired at above permises.permit number m00135427-11-sh expired 02/27/2020.rem:renew permit.
Mar 2, 2020 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction documents.at time of inspection 12 story commercial building observed sidewalk shed was not installed as per approved documents.sidewalk shed was missing for entir
Feb 25, 2020 · Penalty $1,250
Resolve - Class - 2
Pedestrian protection does not meet code specifications.at time of inspection of above premsises obsereved sidewalk shed erected under permit #m00135427 expiration 02/27/2020 with no lights working.remedy:compl
Jan 6, 2020
Resolve - Class - 2
Pedestrian protection does not meet code specifications. at time of inspection of above premises,observed sidewalk shed erected under permit#m00135427 expiration 2/27/20 missing standpipe light(red) to indicate
Dec 23, 2019 · Penalty $5,000
Resolve - Class - 2
Sec. 27-929.1 failure to complete the installation of a full system ofautomatic sprinklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldg 100 feet or mo
Nov 15, 2019
Resolve - Class - 1
05a10,05e01 05a10 door zone restrictor has been tampered. this is a safety device to ensure elevator passengers safety, 05e01 adjust clutch, rubbing floor 7-8.
Dec 12, 2018 · Penalty $3,125
Resolve - Class - 2
Fail to file an acceptable tech report in compliance w/code provisions:nov #36026820p periodic inspection of exterior walls & appurtenances as req by dob.rem:file required report to dob.
Nov 23, 2015 · Penalty $2,000
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Dec 22, 2014 · Penalty $800
Resolve - Non-hazardous
86v05.84i11 86v provide 2yr test tag on governor 84i replace damage gfi in mr
May 21, 2008
Resolve - Non-hazardous
84l10.84l10-repair car communication device (phone).
Dec 18, 2007 · Penalty $180
Resolve - Non-hazardous
84l10,40d06,40t07.84l10-repair cab communication(phone).40d06-properlysecure machine room door.40t07-label machine room door.
Dec 18, 2007 · Penalty $180
Resolve - Hazardous
Failure to file a amended round five report acceptable to this depatment indicating correction of unsafe conditions described in inital ll11/98 report. remedy: file an amended report following remedial repairs
May 23, 2003
Resolve - Non-hazardous
22x10/2x7/74x11/5702/55x11/35x9. 22 as per code and secure 2 as per code 74 woek light 35 bay buck of contreller.
Jul 16, 2002
Resolve - Hazardous
Failure to maintain exterior of building loose & cracked decorative stone on the head od the 11th floor window on the s/e corner remedy : make area safe erect sidewalk shed obtain all necessarly permits. erect
Jul 15, 2002 · Penalty $800
Resolve - Hazardous
Failure to maintian exterior building wall defect us broken & defective concrete ornament has collapsed from 11 sty of south east corner down to street level also at east portion top floor in dnager of collapsi
Jul 15, 2002
Resolve - Non-hazardous
37d6,47b15. -37 properly mount transformer to controller, -47 shorten governor safety cable
Mar 31, 1999
Resolve - Non-hazardous
44d,50y,50x,52d,74i,30o,57o.44 secure duct pipes on gen set 32 secure duet pipes from main machine to controller 74 replace broken skylight over controller
Sep 9, 1998
Resolve - Non-hazardous
50y,50y,44m,32m,35o,30o,743,57o,22d.44 duct cover missing gen set 32 exposed wire in motor rm provide cover 74 secure cover on fan outlet top car and repair fan
Sep 9, 1998
Resolve - Non-hazardous
22d,50x,35o,35d,14m,57o,30o.22 provide the right car top 35 secure ladder to motor rm at the top of ladder 14 glass missing from frame 35 clean car top
Sep 9, 1998
Resolve - Non-hazardous
50y,44d,05e,20b, 50- properly seal machine 44-secure generator wiring connections 05-adjust car door 29- shorten cwt safety cable and adjust tension.
Jul 15, 1998
Resolve - Non-hazardous
03m,50y,57o, 03- install gurad under fan in cab ceiling 50- properly seal machine 57- clean pit.
Jul 15, 1998
Resolve - Non-hazardous
Failure ro provide correct elevator landing sign instructions. failure to provide durable material for elevator signs (no paper) i.e. 2nd flr. remedy: provide signage as per local law 16/84.
Oct 7, 1996 · Penalty $800
Resolve - Non-hazardous
47#, 47- shorten governor cable.
Apr 29, 1992
Resolve - Non-hazardous
74#, 74- review governor cut cable.
Apr 29, 1992
Resolve - Non-hazardous
60i, 60i, 74#, 47#, 74- provide proper clearance between the cut and the buffer. 47- shorten governor cable.
Apr 29, 1992
Resolve
Complaints
- Heat/hot water
Entire building
Oct 29, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2015 · Apt BLDG
Close - Heating
Heat related
Jan 15, 2014 · Apt BLDG
Close - General
Locks
May 13, 2013 · Apt BLDG
Close - Heating
Heat related
Feb 24, 2011 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2021
- Floors
- 27
- Residential units
- 123
- Building area
- 184,411 ft²
- Lot area
- 17,398 ft²
- Zoning
- C4-7
- Community board
- 107
- Council district
- 6
- Block / lot
- 1113 / 18
- Assessed value
- $33,558,750
- Landmark / historic district
- No
HPD registration #145134, last renewed Jul 25, 2025.
Questions about 1841 Broadway
Who owns 1841 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Global 1845 Broadway LLC.
Does 1841 Broadway have violations?
NYC HPD has no housing violations on record for this property.
Is 1841 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1841 Broadway built?
City records list 2021 as the year it was built.
How many apartments are in 1841 Broadway?
It has 123 residential units and 124 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.
