241 West 57 Street
Manhattan, NY 10019BBL 1-01029-7501Map
Owner of record: Devash LLC
241 West 57 Street is a condominium built in 1927 in Manhattan, 10019. The owner of record is Devash LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 171
- ECB violations
- 161
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 171
- Construction other optional
Summons issued for structure rendered non compliant due motor vehicle impacting building damaging metal panel at lower right side of building.
May 18, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed
Show 40 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Nov 21, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2019
Dob violation - resolved - Elevator elevatorrequired
Cease use
Oct 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2019
Dob violation - resolved - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 30, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 30, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2013
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2013
Dob violation - resolved
ECB violations · 161
- Class - 2
Failure to maintain exterior bldg facade and appurtenances.note:observed 1)multiple cracks on bulkhead at rooftop level,2)missing bricks on bulkhead at rooftop level.rem:maintain exterior facade.take/provide sa
Nov 6, 2020 · Penalty $625
Resolve - Class - 1
I observed no sprinkler heads and/or no fire protection for loading dock on 8th avenue which prohibited and not code-complaint, provide a system of automatic sprinklers where required
Aug 4, 2020
Resolve - Class - 1
I observed no sprinkler heads and/or no fire protection for loading dock on 8th avenue which prohibited and not code-complaint, provide a system of automatic sprinklers where required
Aug 4, 2020 · Penalty $2,500
Resolve - Class - 2
A.c. 27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019 in an office building 10
Jul 13, 2020 · Penalty $3,125
Resolve - Class - 2
Sec. 27-929.1 failure to complete the installation of a full system ofautomatic sprinklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldg 100 feet or mo
Nov 15, 2019 · Penalty $1,250
Resolve - Class - 2
59bb7, 99bb7. 59bb7-machine brake tag expired provide; 99bb7-one yeartag expired provide.
Jun 4, 2019
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: at 2nd sty,doing demolition operations,1 worker on atype'a'ladder,8ft height,was cutting a cast iron pipe when pipes fell
Oct 31, 2016
Resolve - Class - 1
Work w/o a permit. noted: at 2nd sty doing demolition work throughout.cutting & removing cast iron drain pipes from ceiling. resulting on a injured worker who fell from working type'a'ladder onto floor of 2nd
Oct 31, 2016 · Penalty $800
Resolve - Class - 1
Work does not conform to approved construction doucments and/or approved amendments. -2scaffolds approx 30'high on 25th flr setback does notconform to approved drawing.the approved drawings call for a stair sys
Oct 31, 2013 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons and prop affected by const operationsnote:installing fixture lighting approx 3'l x 2"w fixture fell & stru ck a car.remedy:provide safe means of operation/installation.
Jun 24, 2013
Resolve
Show 40 more ↓
- Class - 1
3310.3 fail to have site safety plan & program as req.note:while installing led lighting along inside panel of facade one of the fixtures fell onto street & hit a vehicle fixture(said)rem:secure all fixtures-st
Jun 24, 2013 · Penalty $400
Resolve - Class - 1
Work w/o permit.note:facade work @4 sides of bldg.installing 3' fixt ures.no permit obtained.fixture fell & hit a vehicle.remedy:stop all exterior work. obtain permit.
Jun 24, 2013 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments for alt 2 job #110416103 of which permit is active and applicant of record is requesting a letter of completion. non conformin
Dec 16, 2011 · Penalty $250
Resolve - Class - 2
Work does not conform to approved construction documents note bldg owner removed shoring for mastclimber while mast climbers were still in use w/o notifying user of mastclimber of engineer of record
Aug 18, 2010 · Penalty $2,500
Resolve - Class - 1
Failure to inistitue maintain safety equipment measures.no guard rails. @ time ogf insp work in progress 27th flr thru bulkead observed worker @ bulkhead level w/o any ppg or tied off, & no fall protection guar
Aug 18, 2010 · Penalty $1,200
Resolve - Class - 1
Sec 33106 misc viol: designated site safety manager: at time of inspection alt work in progress under permit 104834315 on 26 stories bldg w.o pw2 file for a designated site safety manger as required. site safet
Aug 17, 2010 · Penalty $1,600
Resolve - Class - 2
Sec. bc 3307.4.3 failure to provide warning lights/lanterns for vehicular traffic. upon inspection as noted on alteration site there was approx 100ft of jersey barriers on 8th ave side of job site with only 1#
May 18, 2010
Resolve - Class - 2
Sec. bc 3307.2.1 failure to provide artificial lighting: upon inspection as noted on alteration site there 2# lights on the sidewalk shed that were non-functioning at a very busy intersection 57th & broadway
May 18, 2010
Resolve - Class - 1
Fail to protect public & property during construction operations.noted:approx 20' of sidewalk shed parapet dislodged & struck city bus before falling to st @ south elevation of bldg-handrail from 19th fl dislog
May 8, 2010
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations upon inspection as noted there were cigarette butts approx 20 plus disguarded cigarette boxes.rem-safeguard public & properly by e
May 8, 2010 · Penalty $1,200
Resolve - Class - 2
Sec-bc3301.2-failure to institute & maintain safety equipment or temporary construction:holes in floor!upon inspection as noted on the 19th fl set back there were 6" holes on the roof(west side)8" holes(east si
May 8, 2010
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements:upon inspection as noted on active alteration site there was an excessiveamount of debris approx 20yds on 25th fl set back 19th fl set back & i
May 8, 2010 · Penalty $2,400
Resolve - Class - 2
Siamese not marked with a red light:upon inspection as noted on activealteration site the 2"siamese connections on west side(8 ave)were not marked with a functioning red light.rem-provide functioning red light.
May 8, 2010
Resolve - Class - 1
Sec-bc3308.1-failure to provide vertical netting:upon inspection as noted on the 25th fl set back the vertical netting was missing @ many locations approx 10" & in very poor condition on both set backs.rem-stop
May 8, 2010 · Penalty $1,600
Resolve - Class - 2
Smoking refuse at construction site. as noted: at time of inspection @above active construction site observed smoking refuse w/i construction site on 3,19 & 26 flrs. remedy: comply w/nov & bldg code.
Apr 12, 2010 · Penalty $1,200
Resolve - Class - 1
Bc3320.2)operation of defective hoisting equipment(mast climber)stop work order 21430 cd#3929 cn#019/08 pos#11 serial#m77-07.manufacturer:acces. as per witness statement mastclimber didn't stop when button was
Apr 9, 2010 · Penalty $8,000
Resolve - Class - 1
Inadequate safety measures operation of hoisting equipment in a unsafe manner (mast climber)cd#3929 cn#019/08 pos#11 serial#m77-07 manufacturer:acces.as a result of operator error possible (lack of communicatio
Apr 9, 2010
Resolve - Class - 1
Sec. bc 3319.5 cd3943 cn665/08 the owner of a mast climber/work platform covered by the certificate of operation each year. *note: 3 month extension inspection was done after cd expired. * must have inspection
Feb 25, 2010 · Penalty $1,600
Resolve - Class - 1
Sec. bc 3319.5 cd3945 cn 1031/08 the owner of a mast climber/work platform covered by the certificate of operation shall renew the certificate of operation each year. *note: 3 month extension was done after cd
Feb 25, 2010 · Penalty $1,600
Resolve - Class - 1
Sec. bc 3319.5 cd3944 cn 666/08 the owner of a (mast climber) work plat form covered by the certificate of operation shall renew the certificate of operation each year. *note: inspection was done after cd expir
Feb 25, 2010 · Penalty $1,600
Resolve - Class - 1
3314.5 scaffold does not meet bldg code. a worker welding on a 7' high scaffold. no guard rail or tall protection has been provided. working planks are not fully planked as per code. - comply the code for scaff
Feb 9, 2010 · Penalty $1,600
Resolve - Class - 2
Failed to notify dept prior to use/inst off outrigger beams. noted: nonotification for outrigger beams. remedy: notify the dept.
Feb 4, 2010 · Penalty $400
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: no approved/accepted plans for supported scaffold installed at setbacks. remedy: provide plans.
Feb 4, 2010
Resolve - Class - 1
No record of daily inspection of supported scaffold performed by authorized person on site. noted: no daily inspection log book for supported scaffold at job site at time of inspection. remedy: maintain daily
Feb 4, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg in code compliant manner lack of a system of automatic appl sprinklers where required per pc 903.2 27-954 observed that the temp sprinkler system that is used while construction are in
Jan 12, 2010 · Penalty $1,000
Resolve - Class - 1
Failure to safe guard all persons and property affected by construction operations suspended scaffold adt system workers cracked & broken a window glass @ 24 floor safeguard public & property.
Dec 21, 2009 · Penalty $2,400
Resolve - Class - 2
Expired cd contractor using mastclimber w/ expired cd 11/7/09 swo#21419 rem: obtain new cd 3883
Dec 17, 2009 · Penalty $10,000
Resolve - Class - 1
97#3 c.u 97## due to cease use elevagtor pending accident investigation
Dec 16, 2009 · Penalty $5,000
Resolve - Class - 1
Operation of hoisting equipment in unsafe manner. noted: tiebacks for suspended equipment (adt system) not perpendicular to the bldg face. no drawings for anchor plates use for tiebacks and no pull test.
Nov 13, 2009
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations noted at 2nd fl and 3rd fl perimeters nets is loose missingremoved many locations openings at fl not covered toe boards are not s
Oct 26, 2009 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations noted: at 2nd floor at northside larger section open- no safeguard provided-approx 12' long nets are dont, no guardrail or toe
Oct 7, 2009 · Penalty $2,400
Resolve - Class - 2
Maintenance of sidewalk sheds-noted: at least 8 lights are out at w 58 street and at 8th ave side of street-back areas dangerous to public. rem: maintian lights underneath sidewalk shed.
Oct 7, 2009
Resolve - Class - 2
Operation of crane/derick w/o certificate of approval/certificate of operation. operation of shyhook model exp 130,serial #ssp 130601792,yr 1992 with cd #2985 with expiration date of 7/20/09. cd expired approx
Jul 22, 2009 · Penalty $2,400
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirement: upon in section as noted on active construction site. there was excessive amount of debris(disguarded) building material,disguarded food,approx
Jul 8, 2009 · Penalty $4,000
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations: upon inspection on active construction site as noted there were many cigarette butts approx 25 spread throughout the entire 3rd
Jul 8, 2009 · Penalty $1,200
Resolve - Class - 2
Sec. 3308.1,27-1022 failure to provide required vertical netting. upon inspection as noted on active construction site the vertical netting on the 3rd flr was in poor condition with large holes,some locations
Jul 8, 2009 · Penalty $4,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. on inspection on above active site mass climber on job sheet side overloaded with debris (stones,brick,pieces,mortar piece) taxi cab driver
Jul 2, 2009 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation. as noted: upon inspection at above active construction site as reported by site safety manager during concrete pour at ground flr.
May 13, 2009 · Penalty $2,400
Resolve - Class - 2
Operation of crane/derrick w/o certificate of onsite inspection. mast climber cd # 3943 cn # 665/08. equipment user withdrew from cn appl asper evidence. remedy: obtain a certificate on site. swo # 21370.
Apr 9, 2009 · Penalty $2,400
Resolve - Class - 2
Operation of a mastclimber w/o a cert of on site inspection mastclimber cb 3883 swo #21258 equipment user withdrew from cn application as per letter see evidence. remedy: obtain cert of on site.
Apr 7, 2009 · Penalty $2,400
Resolve
Complaints
- Heat/hot water
Entire building
Mar 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 10, 2018 · Apt BLDG
Close - Heating
Heat related
Aug 16, 2003 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RC)
- Year built
- 1927
- Floors
- 25
- Residential units
- —
- Building area
- 529,883 ft²
- Lot area
- 32,375 ft²
- Zoning
- C5-3
- Community board
- 105
- Council district
- 6
- Block / lot
- 1029 / 7501
- Assessed value
- $140,624,090
- Landmark / historic district
- No
Questions about 241 West 57 Street
Who owns 241 West 57 Street?
The owner of record in NYC Department of City Planning PLUTO data is Devash LLC.
Does 241 West 57 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 241 West 57 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 241 West 57 Street built?
City records list 1927 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.