roofy

Violations at 2 Avenue

Manhattan · BBL 1-00939-0006 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

No DOB violations on record

ECB violations

13 ECB violations, newest first.

  • Class - 2

    B254/16/50/50a/50b/50c/50-boiler flue,not built with manufacters spected material/50a-boiler combustir air pipe outside missing bird screen/50b-boiler condensate line missing neutalizer befu flr drain/50c-bl se

    Aug 16, 2010

    Resolve
  • Class - 2

    B254/16/50/50a/50b/50c/50-boiler flue not built with manufacters spected material./50a-boiler combustir air pipe outisde missing bird screen50b-boiler condensate line missing netalizer befo flr drain/50c-boiler

    Aug 16, 2010

    Resolve
  • Class - 2

    B254/16/50/50a/50b/50c/50-boiler flue rear & boiler not built with amufactor,spected material/50a-boiler combustir air intake pipe outside missing bird screen.50b-boiler condensate line missing neutalizer,befor

    Aug 16, 2010

    Resolve
  • Class - 2

    B254/16/50/50a/50b/50c/50-gas regulators on both hot water heaters notvented to outside.50a-boiler flues on rear of boiler not built with material spected by boiler manufacter/50b-boiler installers book not ons

    Aug 16, 2010 · Penalty $250

    Resolve
  • Class - 1

    3314.6.2 no protection of ropes & or cables around sharp bends, corners etc. ropes & cables shall not be made fast. to sharp objects or surfaces . note: ropes (lifelines) & tie back cables secured to steel beam

    Jul 15, 2010

    Resolve
  • Class - 2

    Work does not conform to approved const. documents & / or approved amendments. note : installed equipment contrary to approved cd5 plans. remedy : conform to approved documents or amendments

    Nov 25, 2009

    Resolve
  • Class - 2

    Failed to notify dept. / obtain permit prior to use / installation of out rigger beams in connection w/ suspended scaffold. note : outriggerbeams/ suspended scaffolds installed w/o notification. remedy : notify

    Nov 25, 2009 · Penalty $400

    Resolve
  • Class - 2

    Work does not conform to approved plans. noted: at the time of inspection splicing of re-bar & hooks, lack of engagment gaps between vertical steel & vertical reinforcement at sw #732 & cols. 15 spacing of

    Oct 30, 2008 · Penalty $2,500

    Resolve
  • Class - 2

    Work does not conform to design documents and/or approved amendments. upon inspection to active job site form work as per drawing was not installed. tension wires on perimeter of north & south side on the 8th

    Oct 14, 2008 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to provide approved plans at premises at time of inspection. noted: alt type 1 application #102248239 for 1st floor gym & addition of 2 floors to bldg. without plans in site. remedy: stop all work!

    Aug 23, 2000 · Penalty $130

    Resolve
  • Non-hazardous

    Failure to provide adequate directional signs in "east" and "west"staircase remedy:provide adequate signage as per local law 16/84.

    Jan 31, 1991 · Penalty $200

    Resolve
  • Non-hazardous

    Failure to provide adequate emergency power exit lights in "east" and "west" staircases throughout floors. remedy-provide adequate emerg posr exit lights per repective stair cases,as per ll16/84

    Jan 31, 1991 · Penalty $200

    Resolve
  • Non-hazardous

    Failure to provide adequate protection for side walks and walkways clearing construction operations. note installing windows above 40ft. without a side walk shed. remedy: erect a side walk shed and obtain perm

    Sep 1, 1988 · Penalty $1,000

    Resolve