301 First Avenue
Manhattan, NY 10003BBL 1-00923-7501Map
Owner of record: 301 First Owner LLC (De)
301 First Avenue is a condominium built in 1969 in Manhattan, 10003. The owner of record is 301 First Owner LLC (De). HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 9
- ECB violations
- 9
- HPD complaints
- 15
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 9
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Aug 19, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 1988
Dob violation - resolved
ECB violations · 9
- Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #902870. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #39023338m issued on 6/2/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no c of c on file.remedy:comp
May 1, 2021
Resolve - Class - 2
Project info panels sign/sidewalk shed parapet panel construction signnot provided or in compliance w/ section. at the time of my inspectionof a proposed 24 story facade alteration i observe a sws at exposure#2
Sep 25, 2020
Resolve - Class - 1
Inspection conducted, at cellar of unoccupied parking garage. observed eroded fire retarding ceiling, and exposed rebar's entire area., repair and/replace
Jun 2, 2020
Resolve - Class - 2
Bc 3307.6.5.4 sidewalk shed storage.note:at the time of inspection it was observed scaffold beaces,frances and other material stored on sidewalk shed along the perimtere at the 1st avenue side contrary to code
May 27, 2020
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#802870.rem:submit acceptable required t
Feb 13, 2020 · Penalty $3,125
Resolve - Class - 1
Failure to notify the department of an accident or incident that resulted in a fatality or injury.a worker cut his thumb while moving a metal stud worker walked to hospital.as per a check of dept records permit
Feb 3, 2020 · Penalty $1,250
Resolve - Class - 1
Bc33104-failure to provide site safety monitoring plan.note at time ofinspection i observed window replacement job in process when asked forsite safety plan was given a plan not for job#123799915.remedy:comply
Dec 26, 2019 · Penalty $625
Resolve - Class - 1
3303.7.2 fire extinguishers. at time of my inspection at a 24story building under construction,i observed not enough fire extinguishers on each floor,not the right size also not properly tagged.remedy:provide f
Nov 21, 2019
Resolve
Complaints
- Unsanitary condition
Pests
Mar 23, 2026 · Apt 401
Close - Unsanitary condition
Pests
Mar 16, 2026 · Apt 401B
Close - Heat/hot water
Apartment only
Jan 20, 2025 · Apt 6E
Close - Plumbing
Water supply
Nov 27, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 27, 2023 · Apt 306B
Close - Heat/hot water
Apartment only
Jan 24, 2016 · Apt 21G
Close - Heat/hot water
Entire building
Feb 25, 2015 · Apt 10A
Close - Heat/hot water
Entire building
Feb 25, 2015 · Apt BLDG
Close - Heating
Heat related
Jan 22, 2014 · Apt 9A
Close - Heating
Heat related
Nov 4, 2012 · Apt 5B
Close
Show 5 more ↓
- General
Mold
Oct 12, 2011 · Apt 22G
Close - General
Ventilation system
Oct 12, 2011 · Apt 22G
Close - General
Ventilation system
Oct 12, 2011 · Apt 22G
Close - Heating
Heat related
Dec 18, 2008 · Apt MB
Close - Plumbing
Water supply
Dec 12, 2007 · Apt 25B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RH)
- Year built
- 1969
- Floors
- 24
- Residential units
- —
- Building area
- 173,766 ft²
- Lot area
- 13,186 ft²
- Zoning
- C1-8
- Community board
- 106
- Council district
- 2
- Block / lot
- 923 / 7501
- Assessed value
- $17,964,900
- Landmark / historic district
- No
Questions about 301 First Avenue
Who owns 301 First Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 301 First Owner LLC (De).
Does 301 First Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 301 First Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 301 First Avenue built?
City records list 1969 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.