roofy

307 East 14 Street

Manhattan, NY 10003BBL 1-00921-0006Map

Owner of record: Unavailable Owner

307 East 14 Street is a hotel built in 1910 in Manhattan, 10003. It has 13 residential units across 5 floors. The owner of record is Unavailable Owner. HPD has recorded 40 housing violations here, most recently on April 1, 2021. 25 of the 40 most recent violations are still open.

HPD violations
40
DOB violations
8
ECB violations
19
HPD complaints
68

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 1, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 40

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenette located at b-room 3b, 3rd story, 1st b-room from north at east

    Nov 6, 2019 · Apt 3B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenette located at b-room 3b, 3rd story, 1st b-room from north at east

    Nov 6, 2019 · Apt 3B

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at b-room 3b, 3rd story, 1st b-room from north at east

    Nov 6, 2019 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing located at b-room 3b, 3rd story, 1st b-room from north at east

    Nov 6, 2019 · Apt 3B

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors at entrance door located at b-room 3b, 3rd story, 1st b-room from north at east

    Nov 6, 2019 · Apt 3B

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective entrance door lock. located at b-room 3b, 3rd story, 1st b-room from north at east

    Nov 6, 2019 · Apt 3B

    Open — Nov sent out
  • C

    Remove the illegal fastening padlockable lock installed at bulkhead door. at public hall, 6th story

    Nov 6, 2019

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. at community bathroom, 2nd story

    Mar 8, 2019

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the room located at b-room 3ab, 2nd story, 1st b-room from north at east

    Mar 8, 2019 · Apt 3AB

    Closed — Violation dismissed
Show 30 more ↓
  • C

    Abate the infestation consisting of roaches in the room located at b-room 3ab, 2nd story, 1st b-room from north at east

    Mar 8, 2019 · Apt 3AB

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection waste line at bathtub. at community bathroom, 2nd story

    Mar 8, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 1, 2015

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor buckling at public hall, 4th story

    Jul 24, 2015

    Open — Invalid certification
  • B

    Properly repair with similar material the broken or defective the sub-wood floor at public hall, 3rd story

    Jul 24, 2015

    Open — Invalid certification
  • B

    Arrange and make self-closing the doors at roof

    Jul 24, 2015

    Open — Invalid certification
  • C

    Remove the illegal fastening lockable slide bolt at roof door

    Jul 24, 2015

    Closed — Violation dismissed
  • C

    Properly secure the loose wood tread 1st. from bottom up at public hall stairs, 3rd story

    Jul 24, 2015

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at front of building entrance , 1st story

    Sep 17, 2012

    Closed — Violation dismissed
  • A

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum 100 watts at front of building entrance , 1st story

    Sep 17, 2012

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts required.

    Jun 10, 2009

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective walls in the 1st room from north located at apt 2b, 2nd story, 1st apartment from north at east

    Sep 7, 2005 · Apt 2B

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceilings in the 1st room from north located at apt 2b, 2nd story, 1st apartment from north at east

    Sep 7, 2005 · Apt 2B

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceilings in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east

    Sep 7, 2005 · Apt 2B

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling water closet at community bathroom, 2nd story

    Sep 7, 2005

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 2b, 2nd story, 1st apartment from north at east

    Sep 7, 2005 · Apt 2B

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective north wall at community bathroom, 2nd story

    Sep 7, 2005

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of exposed electric wire at ceiling in the 2nd room from north at east located at apt 2b, 2nd story, 1st apartment from north at east

    May 13, 2005 · Apt 2B

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of painted sprinkler head in the kitchenette located at apt 3b, 3rd story, 1st apartment from north at east

    May 13, 2005 · Apt 3B

    Open — Nov sent out
  • B

    Properly repair the broken or defective upper and lower sash window in the 2nd room from east at north located at apt 3b, 3rd story, 1st apartment from north at east

    May 13, 2005 · Apt 3B

    Open — Nov sent out
  • A

    Provide a water closet, wash basin, bathtub or shower for each six persons or remainder thereof for any room used for class b occupancy. work must be completed under permit.

    May 13, 2005

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls located at b-room 5b, 3rd story, 1st b-room from north at east

    May 7, 2003 · Apt 5B

    Open — First no access to re- inspect violation
  • A

    Properly repair the broken or defective window sash located at b-room 5b, 3rd story, 1st b-room from north at east

    May 7, 2003 · Apt 5B

    Open — First no access to re- inspect violation
  • B

    Replace with new the broken or defective glassat lower window sash located at b-room 5b, 3rd story, 1st b-room from north at east

    May 7, 2003 · Apt 5B

    Open — First no access to re- inspect violation
  • A

    Properly repair the broken or defective floor located at b-room 5b, 3rd story, 1st b-room from north at east

    May 7, 2003 · Apt 5B

    Open — First no access to re- inspect violation
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling located at b-room 5b, 3rd story, 1st b-room from north at east

    May 7, 2003 · Apt 5B

    Open — First no access to re- inspect violation
  • B

    Provide adequate supply of cold water for the fixtures washbasin located at b-room 5b, 3rd story, 1st b-room from north at east

    May 7, 2003 · Apt 5B

    Open — First no access to re- inspect violation
  • A

    D26-10.01 adm code properly repair with similar material the broken or defective wood floor on 3 sty room 5b.

    Jan 21, 1986

    Open — Nov sent out
  • A

    D26-10.01 adm code paint metal in accordance with dept. regulation the cornice at roof at front.

    Jan 21, 1986

    Open — Nov sent out

DOB building violations · 8

  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Sep 15, 2010

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 7, 2007

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 31, 2007

    Dob violation - dismissed
  • Plumbing none

    P-plumbing none

    Oct 3, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 19

  • Class - 1

    Occupancy contrary to that allowed by c of o tco #103096310t020. illegal occupancy noted: 1 fl occupied as: transient primary use hotel/noted 3 rooms,luggage room,reception desk,2 fl: 2 sro rooms 2 transient

    Sep 14, 2010 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to provide 2 means of egress from (room) or space as required. noted: building occupied as a primary transient use hotel/noted with up to 8 beds in each room w/o providing 2 means of egress.

    Sep 14, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain building walls or appurtenances. defects noted: front brown stone exterior facade wall have diagonal vertical cracks throughout,bulging & spalling pieces in danger to collapse onto sidewalk.

    Sep 14, 2010 · Penalty $1,000

    Resolve
  • Class - 1

    Sec. 1004.2.1 failure to comply with maximum floor area allowed per occupant. noted rooms #101,102,103,203,204,303,304,401,402,403,404.occupied as(primary transient use hotel) less than 200sq ft being occupied

    Sep 14, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to comply with direction of swing. noted: exit door at lobby swing against the direction of egress travel. remedy: comply with direction of swing.

    Sep 14, 2010 · Penalty $1,600

    Resolve
  • Class - 2

    Work w/o permit. work noted: at front of premises erected: building canopy,awning sign for dfci & double face sign open 24hrs candy & deli" at 1st flr level. remedy: obtain permit or restore to prior legal cond

    Sep 14, 2010 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner. exhaust discharge mst be no closer than 10' from another bldg or window as per rs 13 (2-2.1.4) & mc 401.5.2. remedy: comply w/code.

    Sep 14, 2010 · Penalty $800

    Resolve
  • Class - 2

    Sign in specified c district extends beyond street line limitation. noted: double sign projects more than 18" across street line and projected sign on awning (deli) projects more than 12". remedy: remove sign.

    Sep 14, 2010 · Penalty $1,200

    Resolve
  • Class - 2

    Prohibited sign on awning, canopy or marquee in c district. noted: projected sign on deli awning 1) height of letters exceeding 12". 2) exceeding limit of identification. remedy: remove sign.

    Sep 14, 2010 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner : failre to comply with law for drainage system per pc 702 1, 27-911 upon inspection witnessed on 1st fl from above a jazz on the town leaking from bathroom int

    Jul 9, 2008 · Penalty $2,500

    Resolve
Show 9 more ↓
  • Non-hazardous

    Altered bldg occupied w/o valid cofo tco # 1030963107012 exp.10/29/07 remedy: obtain valid cofo or discontinue illegal occupancy

    Nov 7, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    Drainage system not in accordance with rs-16 upon physical inspec.found in knit store bathroom lav- does not have a over flow req 2" trap & piping. remedy:modify drainage system to conform to rs-16.

    Oct 31, 2007 · Penalty $400

    Resolve
  • Non-hazardous

    Drainage system not in accordance with rs-16 upon physical inspec.founillegal jim cap on the drainage system & sink in basement not vented.remedy: modify drainage system to conform with rs-16.

    Oct 31, 2007

    Resolve
  • Hazardous

    Occupancy contraryt to that allowed by the certificate of occupancy. noted: 4 story vldg c of o #103096310 states occupancy 4 class "b" apts per floor. being illegally used as youth hostel with laundry rooms at

    Sep 29, 2005 · Penalty $800

    Resolve
  • Hazardous

    Work without a permit. work noted (a) at rooftop installation of an approx 8'x 6' metal storage shed approx 6' high at north east corner of roof. (b) at 4th fl & 2nd fl at common bath tub-room installation of s

    Sep 29, 2005 · Penalty $500

    Resolve
  • Hazardous

    Failure to comply w ith combustible materials for construction code & purposes. note: at base level access (base) to cellar (cellar primary egress) stair stringers, risers, & treads are built of combustible

    Sep 29, 2005 · Penalty $400

    Resolve
  • Non-hazardous

    Failure to provide approved plans at premises at time of inspection under application # 103096310 as required failure to maintain adequate housekeeping during construction operation in that debris is being stor

    Apr 2, 2004 · Penalty $630

    Resolve
  • Non-hazardous

    Work without a permit noted roll up gates entry door & plate glass windows install at ground floor basement without approvals all work completed remedy obtain permit or restore premises to prior legal condit

    Jun 7, 1999 · Penalty $250

    Resolve
  • Non-hazardous

    Work without a permit: work noted: 1st floor ground floor roll up gate new entry door's & windows no permit at site. remedy: obtain a permit if feasible (or) restore to prior legal use.

    Aug 22, 1996 · Penalty $350

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Jul 29, 2026 · Apt 102

    Close
  • Unsanitary condition

    Pests

    Jul 29, 2026 · Apt 102

    Close
  • Plumbing

    Radiator

    Feb 2, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Dec 20, 2023 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Aug 15, 2023 · Apt 404

    Close
  • Unsanitary condition

    Pests

    Aug 15, 2023 · Apt 404

    Close
  • Heat/hot water

    Entire building

    Nov 17, 2020 · Apt 3AB

    Close
  • Heat/hot water

    Apartment only

    Jan 5, 2020 · Apt 3AB

    Close
  • Outside building

    Roofing

    Oct 31, 2019 · Apt 3B

    Close
  • Plumbing

    Toilet

    Oct 31, 2019 · Apt 3B

    Close
Show 40 more ↓
  • Plumbing

    Radiator

    Oct 31, 2019 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Mar 6, 2019 · Apt 3AB

    Close
  • Unsanitary condition

    Pests

    Mar 6, 2019 · Apt 3AB

    Close
  • Plumbing

    Bathtub/shower

    Mar 6, 2019 · Apt 3AB

    Close
  • Water leak

    Slow leak

    Mar 6, 2019 · Apt 3AB

    Close
  • Plumbing

    Toilet

    Mar 6, 2019 · Apt 3AB

    Close
  • Unsanitary condition

    Mold

    Sep 6, 2017 · Apt 303

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 15, 2017 · Apt 3AD

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 15, 2017 · Apt 3AD

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 15, 2017 · Apt 3AD

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2015 · Apt 2AB

    Close
  • Flooring/stairs

    Floor

    Jul 20, 2015 · Apt 402

    Close
  • Paint/plaster

    Wall

    Jul 20, 2015 · Apt 402

    Close
  • Unsanitary condition

    Pests

    Jul 20, 2015 · Apt 402

    Close
  • Outside building

    Roof door/hatch

    Jul 20, 2015 · Apt 402

    Close
  • Outside building

    Roof door/hatch

    Jul 20, 2015 · Apt 402

    Close
  • Flooring/stairs

    Stairs

    Jul 20, 2015 · Apt 402

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2014 · Apt 2

    Close
  • General

    Doors

    Aug 25, 2012 · Apt 401

    Close
  • Nonconst

    Vermin

    Aug 25, 2012 · Apt 401

    Close
  • Nonconst

    Vermin

    Aug 25, 2012 · Apt 401

    Close
  • Heating

    Heat related

    Dec 30, 2011 · Apt 2B

    Close
  • Nonconst

    Janitor/super

    Nov 12, 2011 · Apt 3AB

    Close
  • Electric

    Electric-supply

    Nov 12, 2011 · Apt 3AB

    Close
  • Electric

    Electric-supply

    May 16, 2011 · Apt 3AB

    Close
  • Heating

    Heat related

    May 16, 2011 · Apt 3AB

    Close
  • Heating

    Heat related

    Jan 10, 2011 · Apt 3AB

    Close
  • Heating

    Heat related

    Jan 8, 2011 · Apt 2B

    Close
  • Heating

    Heat-plant

    Jan 8, 2011 · Apt 2B

    Close
  • Heating

    Heat related

    Nov 9, 2010 · Apt 3AB

    Close
  • General

    Doors

    Nov 16, 2007 · Apt 3AB

    Close
  • Plumbing

    Bathtub/shower

    Nov 16, 2007 · Apt 3AB

    Close
  • Plumbing

    Bathtub/shower

    Nov 16, 2007 · Apt 3AB

    Close
  • Nonconst

    Smoke detector

    Nov 6, 2007 · Apt 1

    Close
  • Heating

    Heat related

    Nov 5, 2007 · Apt 1

    Close
  • General

    Floor

    Sep 6, 2005 · Apt 2B

    Close
  • General

    Doors

    Sep 6, 2005 · Apt 2B

    Close
  • General

    Floor

    Sep 6, 2005 · Apt 2B

    Close
  • Plumbing

    Shower-stall

    Sep 6, 2005 · Apt 2B

    Close
  • Nonconst

    Rubbish

    Sep 6, 2005 · Apt 2B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H3)
Year built
1910
Floors
5
Residential units
13
Building area
4,256 ft²
Lot area
1,145 ft²
Zoning
C1-6A
Community board
106
Council district
2
Block / lot
921 / 6
Assessed value
$607,050
Landmark / historic district
No

HPD registration #127960, last renewed Jul 16, 2025.

Questions about 307 East 14 Street

Who owns 307 East 14 Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 307 East 14 Street have violations?

Yes. NYC HPD has recorded 40 housing violations at this property.

Is 307 East 14 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 307 East 14 Street built?

City records list 1910 as the year it was built.

How many apartments are in 307 East 14 Street?

It has 13 residential units and 14 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.