202 East 29 Street
Manhattan, NY 10016BBL 1-00909-0053Map
Owner of record: 202 East 29th Street Trust
202 East 29 Street is a store building built in 1915 in Manhattan, 10016. The owner of record is 202 East 29th Street Trust. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 57
- ECB violations
- 75
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 57
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed
Show 40 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 8, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 5, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - active - Elevator elevatorrequired
This pvt replaces pvt 495328
Jan 22, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2011
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 9, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 9, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - active - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2010
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 3, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2007
Dob violation - resolved - Construction other optional
C-construction other optional
Jun 15, 2007
Dob violation - active - Construction other optional
C-construction other optional
Jun 15, 2007
Dob violation - active - Construction other optional
C-construction other optional
May 19, 2007
Vw-violation work without permit - active - Construction other optional
C-construction other optional
May 19, 2007
Dob violation - active - Construction other optional
C-construction other optional
May 15, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Elevator elevatorrequired
1p2425
Jun 18, 2002
Dob violation - resolved - Construction other optional
C-construction other optional
Apr 18, 2002
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Apr 18, 2002
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Construction other optional
C-construction other optional
Apr 17, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 17, 2001
Dob violation - active - Construction other optional
C-construction other optional
Mar 15, 2001
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Oct 16, 2000
Dob violation - dismissed - Elevator elevatorrequired
1p2425
Jun 20, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active
ECB violations · 75
- Class - 2
Failure to comply with commissioner's order contained in summons/violation #35585839j issued on 7/29/21 and file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain building wall
Sep 27, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted:at time of inspection at 6th, 5th, 3rd and 1st floors stair hallway (main) with construction items,boxes and other misc items creating hazardous condi
Jul 29, 2021 · Penalty $312
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances note:at time of inspection on exp #1 facing 29 street.at first floor observed missing brick mortar pointing at left side of building at exp #4 observed on
Jul 29, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to comply with commissioner's order to file certificate of correction with dept of buildings for ecb violation #35221033n issued on 04/25/2017 purusuant to section 28-204.2.remedy:file certificate of co
Jul 29, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to compy with commissioner's order to file certificate of correction with dept of buildings for ecb violation #35221034p issued 04/25/2017 pursuant to section 28-204.2.remedy:file certificate of correct
Jul 29, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply with commissioner's order to file certificate of correction with dept of buildings for ecb violation #35221032l issued on 04/25/2017 pursuant to section 28-204.2.remedy:file certificate of cor
Jul 29, 2021 · Penalty $1,250
Active - Class - 1
Premises 6-story commercial building occupied as office and hardware store. at time of inspection observed stair egress and emergency exit partially obstructed with construction materials storage. also observed
Jun 21, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain. at time of inspection,in response to complaint#1518961,observed sidewalk shed in place w/ missing caps on protruding bolts/sharp edges,creating hazardous conditions for pedestrians. remedy:
Aug 15, 2019 · Penalty $2,400
Resolve - Class - 2
Expired support scaffold permit.note:at time of inspection in response to complaint #1518961,i observed support scafold in place with expired perit on 07/10/2019 temporary construction equipment require a permi
Aug 15, 2019 · Penalty $625
Resolve - Class - 2
Expired sidewalk shed permit.note:at time of inspection of compliant #1518961,i observed sidewalk shed in place with expired permit on 07/10/19.temporary construction equipment requires a permit at all times to
Aug 15, 2019 · Penalty $625
Resolve
Show 40 more ↓
- Class - 2
Pedestrian does not meet code specifications note: @time of inspectionobserved unprotected sharp edges @clapms for horizontal braces with nocaps or protection installed on 1/2 studs as per code. creating hazard
Aug 15, 2019 · Penalty $625
Resolve - Class - 1
Bc3314.8.1/failure to maintain supported scaffold at time of inspection in response to compliant #1518961 observed supported pipe scaffold in place with missing guardrails and toe boards on the sides of working
Aug 15, 2019 · Penalty $2,500
Resolve - Class - 2
Temporary construction equipment on site expired permit for sidewalk shed. note: at the time of my inspection, i observed a sidewalk shed erected at exp1. upon review of dept records, it appears that the side
Jul 22, 2019 · Penalty $1,250
Resolve - Class - 2
Temporary construction equipment on site expired permit for supported pipe scaffold. note: at the time of my inspection i observed a supported pipe scaffold erected on sidewalk shed at exp1. upon review the de
Jul 22, 2019 · Penalty $1,250
Resolve - Class - 1
5m7 cease use item missing door zone restrictor. this is a safety device to ensure elevator passenger safety. provide and contact nycdob at [email protected] and 212-393-2435 to return device to service.
May 13, 2019 · Penalty $1,280
Resolve - Class - 2
Temporary equipment on site expired permit.temporary construction equipment on site requires a valid permit to remain installed.note:at timeof inspection i observed supported scaffold installed on exposure #1 a
Jul 6, 2018
Resolve - Class - 2
Expired permit. temporary construction equipment requirs a valid permit at all times to remain installed. note: at time of inspection, i obsserved sidewalk shed in place on exp #1 with permit of sidewalk shed e
Jul 6, 2018
Resolve - Class - 2
Temporary construction equipment on site: expired permit. note: at time of inspection i observed sidewalk shed on site w/an expired permit. permit status is "in progress". remedy: renew permit.
Apr 17, 2018 · Penalty $1,560
Resolve - Class - 2
Temporary construction equipment in site: exp permit. note: at time of inspection i observed supportrd scaffold on site w/an expired permit. permit status is "in progress". remedy: renew permit.
Apr 17, 2018 · Penalty $620
Resolve - Class - 2
Expired permit.temporary construction equipment on site requires a valid permit to remain.noted: at time of inspection i observed suppor ted scaffold installed on exposure #1 and permit of supported scaffold
Feb 21, 2018 · Penalty $800
Resolve - Class - 2
Expired permit. temporary construction equipment required a permit at all times to remain installed. note: at time of inspection i observed sidewalk in place with permit at sidwalk shed expired permit expire
Feb 21, 2018 · Penalty $800
Resolve - Class - 2
Temporary construction equipment on site.expired permit.note:at time of inspection i observed sidewalk shed on exposure #1 with an expired permit.permit expired as of date 07/08/17. remedy:renew permit.
Jul 28, 2017 · Penalty $2,000
Resolve - Class - 2
Temporary construction equipment on site:expired permit.note:at time of inspection i observed supported scaffold on exposure #1 with an expired permit.permit expired as of date 4/28/17.remedy:renew permit.
Jul 28, 2017 · Penalty $4,000
Resolve - Class - 2
Temporary construction equipment on site:expried permit note: at time of inspeciton i observed supported scaffold on site with expired per mit. permit expired 04/28/17. rmdy: renew permit.
Jun 5, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to provide sidewalk shed parapet panel job site sign. note: at time of inspection i observed sidewalk shed on site without job site parapet panel sign. rmdy: comply with code.
Jun 5, 2017 · Penalty $2,000
Resolve - Class - 1
Failure to maintain sidewalk shed lighting in code compliant manner note: at time of inspection i observed electrical wires for sidewalk shed lights,loose, hanging,disconnected, electrical wires out of metal
Jun 5, 2017 · Penalty $4,000
Resolve - Class - 1
Wokr w/o a permit. noted: at 6th fl erected full height partitions creating rooms installed water & waste lines for bathroom toilet,kitchen also sink & roughing in bathroom for sink w/new electrical installed
Apr 25, 2017 · Penalty $8,000
Active - Class - 1
Failure to maintain bldg in code complliant manner no fire stopping per bc712.3 & 27-345. noted: fire stopping none/missing in various locations throughout 6th fl. remedy: provide/maintain fire stopping.
Apr 25, 2017 · Penalty $2,500
Resolve - Class - 2
Occupancy contrary to that allowed by the c of o#71562 illegal occupancy noted: at 6th fl converted occupied as office/business. remedy: discontinue illegal use/or amend c of o.
Apr 25, 2017 · Penalty $6,000
Active - Class - 1
Failure to provide unobstructed exit passageway. noted: at 1st fl right side front elevator & corridor exit door blocked obstructed by boxes,palets & other various items. remedy: remove obstruction.
Apr 25, 2017 · Penalty $3,000
Resolve - Class - 2
Partial stop work order for supported scaffold issued pursuant to 28-207.2 & posted at premise. work does not conform to approved construction documents &/or approved amendments. note: observed supported scaffo
Jul 16, 2015
Resolve - Class - 1
Sec. 3314.8.2 partial stop work order for supported scaffold issued pursuant to 28-207.2 & posted at premises. debris netting noted: observed supported scaffold erected at exp#1(e 29dt)some places a debris nett
Jul 16, 2015
Resolve - Class - 2
Occupancy contrary to that allowed by the c of o or building dept records. note c/o #71562 states that 2nd fl to be use as storage warehouseat time of inspection 2nd floor been use as part of 1st fl store of
Aug 13, 2012 · Penalty $6,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34918495l issued on 6.20.11 pursuant to creating a new opening at 2nd flr rear. remedy: file a c/c.
Aug 30, 2011 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34593601n issued on 8.24.07 installing ac units on 3rd flr on the east side. remedy: comply w/the commissioner's code.
Aug 19, 2011 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner.resp'd failed to correct conditions in #34533810-p creating a new opening at front a deck at 2nd flr. rear.remedy: comply w/code.
Jun 20, 2011 · Penalty $24,000
Active - Class - 1
Failure to comply w/an order of the comm.resp'd failed to correct conditions in 34593601n installing 6 ac units at the 3rd flr.at the east side.remedy:comply w/code.
Jun 20, 2011 · Penalty $24,000
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. noted: respondent failed to correct the conditions cited in the prior nov #34533810p for creating a new opening at front & a deck @ 2nd fl rear.
Apr 21, 2011 · Penalty $12,000
Active - Class - 1
Unlawful acts. failure to comply w/commissioner's order. noted: respondent failed to correct the conditions cited in the prior nov #34593601n for installing 6 ac units at 3rd fl east side. remedy: comply with
Apr 21, 2011 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/commissioner's order to correct condition cited in nov #34593601n for installing 7 a/c units. remedy: comply w/code.
Jan 20, 2011 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/commissioner's order to correct condition cited innov #34538101p. remedy: comply w/code.
Jan 20, 2011 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner. respondent failed to correct conditions in #34593601-n 3rd fl on the east side 6 a.c. units. remedy: comply w/code.
Nov 16, 2010 · Penalty $12,000
Resolve - Class - 1
Failaure to comply w/an order of the comm.resp'd failed to correct conditions in #34538101p 2fl. rear desk & 1st. fl. front opening.remedy:comply w/code.
Nov 16, 2010 · Penalty $24,000
Resolve - Class - 2
Occupancy contrary to the c/o or dob records.note:c/o#71562 indicates premises approved 1fl photo studio (use gp6)wood working shop(use gp16).observed @ 4flr tool rental 3 flr hair salon (front) toy store (rear
Sep 16, 2010 · Penalty $6,000
Active - Class - 1
Failure to comply w/ the commissioners order to obtain a permit for nox#34593601n,issued 8/24/07 for'work w/o permit'.3 flr east side 6 exterior a/c units.remedy:obtain permit.
Sep 16, 2010 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/ the commissioners order to obtain a permit per nov#34538101p.issued 9/5/06 for "work w/o permit" 2 flr rear deck & 1flr front opening.remedy:obtain permit.
Sep 16, 2010 · Penalty $12,000
Resolve - Class - 2
02m7.03m7.70o2.02 provide 2way communication in elevator 40 repair & ppatch machine rm walls 42 provide covers for controller 03 provide missing fan as per code
May 27, 2009 · Penalty $2,500
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o or dob records. occupancy noted: bldg currently occupied as: 1st,2nd flr- hardware store 3rd flr front-office, rear-toy retail store, 4th flr tools rental,
Aug 24, 2007 · Penalty $2,500
Active - Non-hazardous
Failure to maintain exterior bldg. defect noted: roof top accessory round roof over the bldg water tank, having holes, rotten plywood structure & missing roof finish, creating dangerous condition due to weather
Aug 24, 2007 · Penalty $2,500
Resolve - Non-hazardous
Work w/o a permit. work noted: east side of bldg, 3rd flr level, having permanently installed 6 a/c units. on brackets,bolted into exterior brick wall,over the adj bldg 206 e 29 st, exceeding property line w/
Aug 24, 2007 · Penalty $2,500
Resolve
Complaints
- Water leak
Slow leak
Dec 11, 2017 · Apt ROOF
Close - Water leak
Slow leak
Dec 10, 2017 · Apt ROOF
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1915
- Floors
- 6
- Residential units
- —
- Building area
- 24,634 ft²
- Lot area
- 4,609 ft²
- Zoning
- R8B
- Community board
- 106
- Council district
- 2
- Block / lot
- 909 / 53
- Assessed value
- $2,000,700
- Landmark / historic district
- No
Questions about 202 East 29 Street
Who owns 202 East 29 Street?
The owner of record in NYC Department of City Planning PLUTO data is 202 East 29th Street Trust.
Does 202 East 29 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 202 East 29 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 202 East 29 Street built?
City records list 1915 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.