Violations at 9 Avenue
Manhattan · BBL 1-00729-0050 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
18 DOB violations, newest first.
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 8, 2018
Dob violation - resolved - Construction other optional
On 11/19/17 a glass panel fell from 50th floor on south elevation expo#1 remedy owner to immediately retain a nys licensed professional to evaluate all facade glass curtain wall.submit all information to facade unit file and permit all work
Nov 21, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations
10 ECB violations, newest first.
- Class - 1
Failure to maintain exterior-building facade and appurtenances.note:attime of inspection observe crack/damage/broken falling glass panel on 50th floor and also observe crack(corner)wall glass pannel on 18/19 fl
Nov 21, 2017 · Penalty $5,000
Resolve - Class - 1
05a10;68b07;11d06/(05-a-10)cease use item.door zoner restrictor has been tampered with/disabled and rendered inoperative.this isa a safety device to ensure elevator passanger safety,repair restrictor and contac
Oct 16, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to institute & maintain safety equipment measures & temporary construction. note: at the time of my inspecton responding to incident/complaint #1443399 where site safety manager reported worker fell off
Feb 14, 2017 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction. note: at the time of my inspection responding to complaint #1431564 where ssm reported a piece of metal fell off a rolling cart onto the
Aug 25, 2016 · Penalty $10,030
Resolve - Class - 1
Bc3301.6 design.note @ the time of inspection of a 64 story bldg @ bulkhead level construction work in progress.i observed safety embedded strap installed throughout fl,throughout bldg.upon request for design a
Apr 25, 2016 · Penalty $1,600
Resolve - Class - 2
Sec. 3303.4.1 slipping & tripping hazard. at time of inspeciton i observed a gang ladder/ship yard ladder installed on 35th fl to 36th fl not fully extended & positioned to avoid tripping hazards. 1st fl rung
Dec 22, 2015
Resolve - Class - 1
Fail to perform hydrostatic pressure test-standpipe and file dp 98 with the dept.of buildings.note:active construction site concrete poured to 11th floor, forming 12th floor and standpipe installed on 6th floor
Sep 29, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations.note 64 story bldg forming of 5th fl in progress.i respondedto dob incident#20177 where worker fell from a ladder causing injury t
Aug 17, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to provide design drawing (site specific) partial stop work order on floors 2nd,3rd,4th issued pursuant to 28-207.2 and posted at premises: upon inspection as noted worker fell from 2nd flr level: bye
Aug 3, 2015 · Penalty $1,000
Resolve - Class - 2
Cd 3328 swo: 031315dkm01 operation of crane w/o c of c no cn. i witnessed cd 3328 operated b charles j dakin lic: 10024 exp: 1/12/18 operated @ 435 w 31 st crane was being used to set concrete forms. the cd 25
Mar 13, 2015
Resolve