Violations at 10 Avenue
Manhattan · BBL 1-00690-0029 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
5 DOB violations, newest first.
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 8, 2018
Vp*-violation unserved ecb- dismissed
ECB violations
12 ECB violations, newest first.
- Class - 2
Bc3310.5.3 failure to mention acting site safety on log.at the time ofan inspection of an active jobsite met with acting site safety managermr.winston e broone#1273,upon request to see site safety log for the m
Oct 28, 2020
Resolve - Class - 2
3307.6.5.8 periodic inspection of sidewalk shed(6 months)/daily logs.at the time of an inspection of an active jobsite observed sidewalk shed at exposure#1,2,and 4.upon request to see sidewalk shed daily logs a
Oct 28, 2020
Resolve - Class - 2
Sec. 3319-01(g)(7)(i) michael lombardo pe#090287 failed to submit required cd8 sign off in a timely manner allowing crane to be operated w/oa certificate of onsite inspection. above cd8 cn#826-18 cd#3527 was
Jan 17, 2019
Resolve - Class - 2
Sec.3 3319-01(g)(7)(i) michael lombardo pe#090287 failed to submit required cd8 sign off in a timely manner allowing crane to operate w/o a certificate of onsite inspection. above cd8 cn#826-18 cd#3658 was sign
Jan 17, 2019
Resolve - Class - 2
Respondent failed to make the proper notification for mobile crane after may 1, 2018 to the department. at time of inspection it was discovered that no mobile crane (cn 60618) was on site.notification was made
Jan 8, 2019 · Penalty $5,030
Resolve - Class - 2
Sec.3 3319-01(g)(7)(i) michael lombardo pe#090287 failed to submit required cd8 signoff in a timely manner allowing crane to operate w/o a certificate of onsite inspection. above cd8 cn#864-18 was signed off on
Jan 2, 2019 · Penalty $625
Resolve - Class - 2
Sec. 3319-01(g)(7)(i) michael lombardo pe#090287 failed to submit required cd8 signoff in a timely manner allowing crane to operate w/o a certificate of onsite ins¢ection. above cd8 cn#826-18 cd#3866 was signed
Nov 12, 2018
Resolve - Class - 2
Sec. 3319-01(g)(7)(i) michael lombardo pe#090287 failed to submit required cd8 sign off in a certificate of onsite inspection. above cd8 cn#826-18 cd#4701 was signed off on 10-15-18 & was not submitted to crane
Oct 15, 2018
Resolve - Class - 2
Sec. 3317-01(g)(7)(i) michael lombardo pe#090287 failed to submit required cd8 signoff in a timely manner allowing crane to operate w/o a certificate of onsite inspection. above cd8 cn#826-18,cd#4871 was signed
Oct 12, 2018
Resolve - Class - 1
Bc3307.7.2 gates. note: at the time of my inspection of a 21 story building at partial excavation and foundation phase, construction work in progress. i observed that man gate at exp #1, & #3 was swinging into
Aug 8, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. at the time of inspection it was observed that a worker was injured while preparing a steel "h" pile for installation. the worker
Mar 16, 2018 · Penalty $5,000
Resolve - Class - 1
Sec. 3303.2.1 failure to adequately protect utilities during construction/excavation. at the time of inspection it was observed that the contractor damaged a 4 inch high pressure gas main while excavating. gas
Nov 27, 2017 · Penalty $8,000
Resolve