13 DOB violations, newest first.

  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2011 inspection/test

    Oct 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 23, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 23, 2010

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Dec 29, 2008

    Vpw*-violation unserved ecb-work without permit-dismissed
  • Construction other optional

    C-construction other optional

    Dec 26, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 2, 2008

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    Location installed signage w/o a permit

    Jul 25, 2000

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    Location installed signage w/o a permit

    Jul 20, 2000

    Vw*-violation - work w/o permit dismissed
  • Landmark none

    Landmk-landmark none

    Dec 31, 1992

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Jun 3, 1992

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Aug 19, 1987

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Jul 28, 1987

    Dob violation - dismissed
  • Landmark none

    Landmrk-landmark none

    Jul 28, 1987

    Dob violation - dismissed

ECB violations

27 ECB violations, newest first.

  • Class - 1

    Failure to provide unobstructed exit passageway. noted: at time of inspection observed exit passageway at 1st flr level being obstructed w/construction material during construction operation, thus creating a

    May 20, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations. note: at time of inspection observed hoist from 1st flrto roof level not fully enclosed w/ soud barrier around the hoist area

    May 5, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard all person & property affected by construction operation - upon inspection an observed window installation work is in progress using 2 point suspended scaffolding above 8th flr (selback)

    Mar 17, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements upon inspection construction of nb is in progress,the building is up to roof. at time of inspection observed construction materials,debris,wast

    Mar 17, 2009 · Penalty $400

    Resolve
  • Class - 1

    Sec. 3314.8.1 two point suspended scaffolding does not meet building code requirements - upon inspection construction of nb is in progress,the building is up to roof. at time of inspection observed 2 point susp

    Mar 17, 2009 · Penalty $8,000

    Resolve
  • Class - 2

    Work w/o a permit - upon inspection observed approx 14ft high pipe scaffolding erected on the roof of the building at the edge of roof. remedy: stop all work,erection & dismantling of the pipe scaffolding on ro

    Mar 17, 2009 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to provide/use lifeline while working on scaffold. noted: (2) men on top of multi point scaffold at exp 2 approx 70'high done w/harness but not attached to anything & one with no harness at all. remedy:

    Mar 9, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to keep standpipe system free of obstruction during construction operation.note:at time of inspection observed standpipe being obstruction by hvac system inside stairwell on the 7 & 8fl(brass hose valve

    Feb 13, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or amendments.noted:suspended scaffold under permit #110430846 have tiebacks installed not like on plans.(tiebacks attached in angle(approx 20").remd

    Feb 9, 2009

    Resolve
  • Class - 2

    Work w/o a permit. upon inspection construction on nb is upto roof. attime of inspection observed standpipe system with siamese connection has been installed in the bldg upto 11th flr. as per dob record no per

    Dec 29, 2008 · Penalty $4,000

    Resolve
  • Class - 1

    Cease use of device due to accident call 212-566-5542 when ready for service.

    Dec 26, 2008 · Penalty $5,000

    Resolve
  • Class - 1

    Cease use of device due to accident call 212-566-5542 when ready for service.

    Dec 26, 2008 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operation. upon inspection observed 1)concrete jersey barricodes used in construction fence on south side & outside the posts of sidewalk she

    Dec 26, 2008 · Penalty $2,400

    Resolve
  • Class - 2

    Work w/o a permit. upon inspection observed standpipe system with siamese connection installed in the under construction bldg upto 11th flr.as per dob record no permit has been issued for the standpipe system

    Dec 26, 2008 · Penalty $4,000

    Resolve
  • Class - 2

    Ss 3301.2 27-1009(a). failure to safeguard all persons and property affected by construction operations. upon inspection observed recent smoking refuse at the construction site. cigarette buts, empty new part

    Dec 26, 2008 · Penalty $4,000

    Resolve
  • Class - 1

    Ss 3303.1.3. non fire retardant treated materials used for construction of contructor's shanty. upon inspection observed non fire retardant treated ply woods used for construction of a contractors shanty at the

    Dec 26, 2008 · Penalty $8,000

    Resolve
  • Class - 2

    Ss 28-103.8 26-115. matters nor provided with safety strap log book. upon inspection construction of nb is upto roof. at time of inspection observed safety straps have been installed embeded in concrete slabs

    Dec 26, 2008 · Penalty $4,000

    Resolve
  • Class - 1

    Ss 3303.8 27-1014(b). standpipe & siamese connection does not meet bldg code standards. upon inspection observed fire hose valves missing caps on 4th, 7th & 11th flrs of the stand pipe system. the siamese conne

    Dec 26, 2008 · Penalty $8,000

    Resolve
  • Class - 1

    Ss 27-1021 (9)(3). safety netting damaged and or/broken. upon inspection construction of nb is upto roof. at time of inspection observed cables of vertical safety netting are not lightened, nets not property

    Dec 26, 2008 · Penalty $8,000

    Resolve
  • Class - 1

    Ss 3304.4.5 27-1018. unsafe storage of material at the perimeters within 10ft of facade. upon inspection construction of nb is at roof level. at time of inspection observed construction materials like blocks

    Dec 26, 2008 · Penalty $8,000

    Resolve
  • Class - 1

    Ss 1906.6 27-1035. reshores not secured. upon inspection observed reshores on 10th & 11th flr within 10 ft of facade not straped or secured against accidental falling from bldg. remedy: secure & strap reshores

    Dec 26, 2008 · Penalty $8,000

    Resolve
  • Class - 1

    Failure to maintain/institute safety equipment measures or temporary construction. no toe boards. upon inspection constructin of nb's at roof level. at time of inspection observed the bero cables of vertical sa

    Dec 26, 2008 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. upon inspection construction of nb is upto roof level. at time of inspection observed about 1" to 2" water accumulated on 1st flr, ice deposit

    Dec 26, 2008 · Penalty $800

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operation. upon inspection observed the hoist platform on 5th flr has been partially removed for installing clamps for curtain wall, the area

    Dec 26, 2008 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to post dot permit for street closure. noted: there is a sidewalk bridge in closure w/no permit (dot) stipulated the bridge being ( ). remedy: post permit.

    Oct 29, 2008 · Penalty $500

    Resolve
  • Hazardous

    Failure to safeguard public & property @ time of inspection brick work was in progress @ 40th fl west side, however no overhead protection had been provided (sidewalk shed had been removed) for public walkway

    May 2, 2003 · Penalty $1,500

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by building department records from legal use vacant lot demo permit 11-87 to illegal use public parking lot remedy discontinue ilelgal use or amend cofo

    Aug 6, 1997

    Resolve