roofy

9 5 Avenue

Manhattan, NY 10003BBL 1-00566-0001Map

Owner of record: The 3rd Brevoort Corp

9 5 Avenue is an elevator apartment building built in 1953 in Manhattan, 10003. It has 267 residential units across 20 floors. The owner of record is The 3rd Brevoort Corp. HPD has recorded 9 housing violations here, most recently on June 15, 2022.

HPD violations
9
DOB violations
87
ECB violations
44
HPD complaints
26

Available now in this building

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 15, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. The newest 10 per agency here; the full lists are a click away.

HPD housing violations · 9

  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 16b, 16th story, 1st apartment from east at south , section at south

    Jun 15, 2022 · Apt 16B

    Closed — Violation closed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Jun 8, 2020

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at east located at apt 15j, 14th story, apartment at north , section at south

    Aug 9, 2017 · Apt 15J

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 15j, 14th story, apartment at north , section at south

    Aug 9, 2017 · Apt 15J

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective ventilation system in the bathroom located at apt 15j, 15th story, 1st apartment from west at north

    Mar 8, 2016 · Apt 15J

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of scalding hot water temp. 142.f at all hot water fixtures in the entire apartment located at apt 16b, 15th story, 1st apartment from east at south , section at south

    Jul 2, 2010 · Apt 16B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color water damage ceiling and west wall in the kitchen located at apt 16l, 15th story, 1st apartment from east at south , section at north

    Jul 9, 2002 · Apt 16L

    Closed — Violation closed
  • ANon-hazardous

    D26-20.08,20.09 adm code file certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations.

    Jan 20, 1982

    Closed — Violation closed

DOB building violations · 87

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 23, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 19, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 13, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 13, 2020

    Dob violation - resolved
See all 87 DOB violations (10 shown here)

ECB violations · 44

  • Class - 2

    At time of inspecton i observed sidewalk shed installed on exposure # 1 and 2 without signs or project information panel on the shed parapet, to display the name and the contact information of the owner or the

    Mar 17, 2025 · Penalty $1,250

    Active
  • Class - 2

    At the time of inspection upon request to see & verify documents non was provided or presently onsite as per bc code 3301.7 ( no parapet stability letter for lifeline parapet clamps installed at exposure 1 & no

    Aug 27, 2024 · Penalty $1,250

    Active
  • Class - 2

    At the time of inspection i observed tieback installed at exposure 3 going over parapet wall contrary to the approved drawing designed .

    Aug 27, 2024

    Resolve
  • Class - 2

    At the time of my inspection of a 20 story facade alt i observed that approximatly 180 feet of sidewalk shed at exposure 4 was no longer in place contrary to the approved ssp and shed drawings. with review of

    Sep 9, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to post&distribute tenant protection plan note:atoi observed work being performed in apt18c under aforementioned job# (illegible) notoo posted or distributed in occupied bldg while works ongoing.comply

    Mar 25, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to post or distribute safe const bill of rights.note atoi observed work being performed under aforementioned job#.by code its required that scbofr should be posted or distributed while work was being pe

    Mar 25, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    28-201.1 inadequate tenant protection plan note:atoi observed work being performed under aforementioned job#.submitted tpp lacks specific means&methods of protecting tenants on health requirements section doesn

    Mar 25, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    @time of inspection, observed ongoing const activites contrary to mayors emergancy executive order 120 &, subsequent orders in corporating requirements of governors executive order 2023.4 & subdequent orders

    Jul 20, 2020

    Resolve
  • Class - 2

    Failureto distribute or post a notice of the safe construction bill of rights in accordance with teh housing and maintenances code section 27-2009.2&1 -scbqr at the time of my inspection contractor failed to po

    Jan 6, 2020

    Resolve
  • Class - 2

    Failure to distribute or post a notice of tenant protetction plan tpp at the time of inspection observed actiev construction work within apt 5 ft on et hfifth floor without the display at the tpp on the lobby o

    Jan 6, 2020

    Resolve
See all 44 ECB violations (10 shown here)

Complaints

  • Heat/hot water

    Apartment only

    Dec 27, 2025 · Apt 8G

    Close
  • Safety

    Sprinkler

    Sep 11, 2025 · Apt 18H

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2020 · Apt 16O

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jun 1, 2020 · Apt 8B

    Close
  • General

    Bell/buzzer/intercom

    Jun 1, 2020 · Apt 8B

    Close
  • Water leak

    Slow leak

    Jun 1, 2020 · Apt 8B

    Close
  • General

    Bell/buzzer/intercom

    Jun 1, 2020 · Apt 8B

    Close
  • Heat/hot water

    Apartment only

    Nov 8, 2019 · Apt 6T

    Close
  • Unsanitary condition

    Pests

    Jan 12, 2019 · Apt 12M

    Close
See all 26 HPD complaints (10 shown here)

Sales history

DatePriceTypeUnits
Sep 1, 2026$1,965,000Coops - elevator apartments—
Jul 29, 2026$730,000Coops - elevator apartments—
Jul 9, 2026$2,495,000Coops - elevator apartments—
May 5, 2026Non-market transferCoops - elevator apartments—
May 2, 2026Non-market transferCoops - elevator apartments—
Apr 24, 2026$2,695,000Coops - elevator apartments—
Apr 6, 2026$1,175,000Coops - elevator apartments—
Apr 3, 2026$1,007,000Coops - elevator apartments—
Mar 11, 2026$2,225,000Coops - elevator apartments—
Mar 10, 2026$2,330,000Coops - elevator apartments—
See all 20 recorded sales (10 shown here)

Building details

Building type
Elevator apartment building (D4)
Year built
1953
Floors
20
Residential units
267
Building area
392,071 ft²
Lot area
37,566 ft²
Zoning
R10
Community board
102
Council district
2
Block / lot
566 / 1
Assessed value
$54,964,800
Landmark / historic district
Greenwich Village Historic District

HPD registration #111377, last renewed Jul 23, 2026.

Questions about 9 5 Avenue

Who owns 9 5 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is The 3rd Brevoort Corp.

Does 9 5 Avenue have violations?

Yes. NYC HPD has recorded 9 housing violations at this property.

Is 9 5 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 9 5 Avenue built?

City records list 1953 as the year it was built.

How many apartments are in 9 5 Avenue?

It has 267 residential units and 273 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.