106 Spring Street
Manhattan, NY 10012BBL 1-00485-0021Map
Owner of record: Workspace INC
106 Spring Street is an elevator apartment building built in 1895 in Manhattan, 10012. It has 10 residential units across 6 floors. The owner of record is Workspace INC. HPD has recorded 24 housing violations here, most recently on April 29, 2026. 10 of the 24 most recent violations are still open.
- HPD violations
- 24
- DOB violations
- 43
- ECB violations
- 9
- HPD complaints
- 17
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Make safe by properly repairing the structural defect structure beams and columns next to east foundation wall at cellar story at cellar
Sep 16, 2024
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 6n, 6th story, 1st apartment from north at east
Sep 16, 2024 · Apt 6N
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 16, 2024
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 16, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing sign at public hall, 1st story
Sep 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at cellar
Sep 16, 2024
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 6n, 6th story, 1st apartment from north at east
May 7, 2024 · Apt 6N
Open — Nov sent out
Show 14 more ↓
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 6n, 6th story, 1st apartment from north at east
Apr 22, 2024 · Apt 6N
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Mar 2, 2016
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from east at south located at apt 6s, 6th story, 1st apartment from east at south
Mar 19, 2015 · Apt 6S
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 6s, 6th story, 1st apartment from east at south
Mar 19, 2015 · Apt 6S
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east located at apt 6s, 6th story, 1st apartment from east at south
Jan 29, 2015 · Apt 6S
Open — Nov certified late - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east located at apt 6s, 6th story, 1st apartment from east at south
Jan 29, 2015 · Apt 6S
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 6s, 6th story, 1st apartment from east at south
Jan 29, 2015 · Apt 6S
Open — Nov certified late - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from east located at apt 6s, 6th story, 1st apartment from east at south
Jan 29, 2015 · Apt 6S
Open — Nov certified late
DOB building violations · 43
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 26, 2024
Dob violation - dismissed - Construction other optional
A8- observed cellar level vault instate of disrepair conditions with water damaged, load bearing metal beams and columns are deteriorated, rotted, cracks, falling debris and compromised vault stability. also observed severe water damaged on vault wall.
Sep 20, 2024
Dob violation - active - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 17, 2015
Dob violation - resolved
Show 33 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 17, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 19, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 19, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 3, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 24, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 30, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2003
Dob violation - resolved - Elevator elevatorrequired
1f1732
Mar 3, 2003
Dob violation - resolved - Elevator elevatorrequired
1f1732
May 15, 2002
Dob violation - resolved - Elevator elevatorrequired
1p2243
May 15, 2002
Dob violation - resolved - Elevator elevatorrequired
1p2243
Sep 28, 2000
Dob violation - resolved - Elevator elevatorrequired
1f1732
Oct 13, 1999
Dob violation - resolved - Elevator elevatorrequired
1p2243
Oct 12, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 1994
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 1994
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
(40) perform 5 year test and tag governor for same .....(46 & 49) reshackle and tag for same
Oct 1, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 1989
Dob violation - resolved - Construction other optional
C-construction other optional
Feb 14, 1989
Dob violation - dismissed - Elevator elevatorrequired
(15) secure top exit covers
Jan 10, 1989
Dob violation - resolved
ECB violations · 9
- Class - 1
A8- observed cellar level vault instate of disrepair conditions with water damaged, load bearing metal beams and columns are deteriorated, rotted, cracks, falling debris and compromised vault stability. also ob
Sep 20, 2024 · Penalty $1,250
Resolve - Class - 2
Work without a permit.at the time of inspection workmen were at the roof work on the bulkhead.the existing brick masonry was completely demolished and temporary structure was being installed.no approved permit
Aug 19, 2015
Resolve - Non-hazardous
21m07/36o02/34i04/01l10/84m07/59q03 21) door lock covers basement and street level 36) clean overhead 34) 4th and 5th floor window frames 01) stop switch bell not ringing 84) halfway box covers missing 59)
Jan 14, 2005 · Penalty $180
Resolve - Non-hazardous
30i,57o,50y,09h,25q,33p,75p,15l,16h,01l,14m, 15l11-not self closing.
Jun 19, 1998 · Penalty $350
Resolve - Non-hazardous
50y11,36i11,73p17,30q03, 30q3-from motor room.
Jun 19, 1998 · Penalty $350
Resolve - Hazardous
18x,06x,00,##,03i,36w,19m.18-x-11 06-x-11 gate switch and interlock inoperative cease use 000 provide shaftway signs on windows.###overhead machine room walls damaged plaster falling into shaft.
Oct 17, 1995 · Penalty $500
Resolve - Non-hazardous
07x,22w,53x,36w.
Oct 17, 1995
Resolve - Non-hazardous
46t,73t, (73) perrform 5yr test properly date & tab governor & file elevator 3 form with this department.
Feb 19, 1992 · Penalty $75
Resolve - Non-hazardous
46t,73t,3i,47#,49h, (73) perform 5yr test, date & tab governor & file elevator 3 form with this department (47) shorten goveror cable.
Feb 19, 1992 · Penalty $75
Resolve
Complaints
- Appliance
Electric/gas range
Nov 20, 2024 · Apt 6N
Close - General
Cooking gas
Sep 5, 2024 · Apt 6N
Close - General
Cooking gas
May 2, 2024 · Apt 6N
Close - Heat/hot water
Entire building
Apr 17, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Apr 16, 2024 · Apt 6N
Close - Heat/hot water
Entire building
Apr 15, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Nov 8, 2015 · Apt 3A
Close - Unsanitary condition
Mold
Nov 8, 2015 · Apt 3A
Close - Water leak
Slow leak
Oct 29, 2015 · Apt 6S
Close - Paint/plaster
Ceiling
Oct 29, 2015 · Apt 6S
Close
Show 7 more ↓
- Heat/hot water
Apartment only
Mar 5, 2015 · Apt 6N
Close - Paint/plaster
Ceiling
Jan 26, 2015 · Apt 6S
Close - Paint/plaster
Ceiling
Jan 26, 2015 · Apt 6S
Close - Water leak
Heavy flow
Jan 26, 2015 · Apt 6S
Close - Water leak
Slow leak
Jan 7, 2015 · Apt 6S
Close - Outside building
Roofing
Jan 7, 2015 · Apt 6S
Close - Water leak
Slow leak
Jun 4, 2014 · Apt 6S
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D0)
- Year built
- 1895
- Floors
- 6
- Residential units
- 10
- Building area
- 32,088 ft²
- Lot area
- 5,381 ft²
- Zoning
- M1-5/R7X
- Community board
- 102
- Council district
- 1
- Block / lot
- 485 / 21
- Assessed value
- $4,863,150
- Landmark / historic district
- SoHo-Cast Iron Historic District
HPD registration #139732, last renewed Oct 9, 2024.
Questions about 106 Spring Street
Who owns 106 Spring Street?
The owner of record in NYC Department of City Planning PLUTO data is Workspace INC.
Does 106 Spring Street have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 106 Spring Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 106 Spring Street built?
City records list 1895 as the year it was built.
How many apartments are in 106 Spring Street?
It has 10 residential units and 11 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.