167 Eldridge Street
Manhattan, NY 10002BBL 1-00420-0068Map
Owner of record: 165 Eldridge Owner LLC
167 Eldridge Street is an elevator apartment building built in 2002 in Manhattan, 10002. It has 18 residential units across 8 floors. The owner of record is 165 Eldridge Owner LLC. HPD has recorded 20 housing violations here, most recently on December 12, 2025. 3 of the 20 most recent violations are still open.
- HPD violations
- 20
- DOB violations
- 33
- ECB violations
- 2
- HPD complaints
- 32
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at wash basin cabinet in the bathroom located at apt 2b , 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 2B
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east at south located at apt 5b, 5th story, 1st apartment from south at west
Aug 26, 2024 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at chute, at compactor closet, 6th story
Aug 26, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at compactor closet, 6th story
Aug 26, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 5th story
Aug 26, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 4th story
Aug 26, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 2nd story
Aug 26, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to staircase a at public hall, 7th story
Aug 26, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 5b, 5th story, 1st apartment from east at south
Apr 12, 2024 · Apt 5B
Closed — Violation closed
Show 10 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 5b, 5th story, 1st apartment from east at south
Apr 12, 2024 · Apt 5B
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Jan 10, 2017 · Apt 3B
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2016
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Mar 21, 2005 · Apt 3B
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of gas to the fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Mar 21, 2005 · Apt 3B
Closed — Violation closed
DOB building violations · 33
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 21, 2020
Dob violation - resolved
Show 23 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 23, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 21, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed
ECB violations · 2
- Class - 2
Class 2: alarm bell inoperative repair & wire into stop switch. sight guards missing on hoist doors provide at every door. cab position indicator inoperative repair. car door misaligned causing scrapping adjust
Jun 7, 2024 · Penalty $250
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000004371 hasbeen inspected,tested,and disinfected,and that a maintenance plan has been development and implemented,by november 1,2016.rem:file annual ce
Jun 20, 2017 · Penalty $5,000
Resolve
Complaints
- Water leak
Slow leak
Feb 4, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Plumbing
Water supply
Dec 11, 2025 · Apt 7B
Close - Plumbing
Water supply
Sep 24, 2025 · Apt 2A
Close - Plumbing
Water supply
Sep 22, 2025 · Apt 7B
Close - Heat/hot water
Entire building
Jun 25, 2025 · Apt 7B
Close - Plumbing
Water supply
Oct 4, 2024 · Apt 7B
Close - Heat/hot water
Entire building
Sep 10, 2024 · Apt 4B
Close - Heat/hot water
Entire building
Sep 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 8, 2024 · Apt 7B
Close
Show 22 more ↓
- Heat/hot water
Apartment only
Sep 7, 2024 · Apt 4B
Close - Heat/hot water
Entire building
Sep 7, 2024 · Apt 4B
Close - Heat/hot water
Entire building
Sep 2, 2024 · Apt 7B
Close - Flooring/stairs
Floor
Aug 29, 2024 · Apt 5B
Close - Flooring/stairs
Floor
Aug 21, 2024 · Apt 5B
Close - Flooring/stairs
Floor
Jun 30, 2024 · Apt 5B
Close - Electric
Power outage
Apr 26, 2024 · Apt BLDG
Close - Water leak
Slow leak
Apr 3, 2024 · Apt 5B
Close - Water leak
Heavy flow
Jan 10, 2024 · Apt 5B
Close - Water leak
Heavy flow
Jan 12, 2022 · Apt 7B
Close - Paint/plaster
Ceiling
Jan 12, 2022 · Apt 7B
Close - Paint/plaster
Ceiling
Jan 12, 2022 · Apt 7B
Close - Water leak
Slow leak
Dec 2, 2020 · Apt 6A
Close - Heat/hot water
Apartment only
Feb 4, 2015 · Apt 9D
Close - Plumbing
Water-leaks
Apr 15, 2007 · Apt 6A
Close - Nonconst
Rubbish
Jun 20, 2005 · Apt 5B
Close - General
Doors
Jun 17, 2005 · Apt BDG
Close - General
Cooking gas
Mar 21, 2005 · Apt 5B
Close - Heating
Heat related
Mar 21, 2005 · Apt 5B
Close - Heating
Heat related
Mar 17, 2005 · Apt 5B
Close - Heating
Heat related
Mar 17, 2005 · Apt 3B
Close - General
Cooking gas
Mar 17, 2005 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2002
- Floors
- 8
- Residential units
- 18
- Building area
- 32,700 ft²
- Lot area
- 5,029 ft²
- Zoning
- C4-4A
- Community board
- 103
- Council district
- 1
- Block / lot
- 420 / 68
- Assessed value
- $3,544,650
- Landmark / historic district
- No
HPD registration #142356, last renewed Sep 23, 2025.
Questions about 167 Eldridge Street
Who owns 167 Eldridge Street?
The owner of record in NYC Department of City Planning PLUTO data is 165 Eldridge Owner LLC.
Does 167 Eldridge Street have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 167 Eldridge Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 167 Eldridge Street built?
City records list 2002 as the year it was built.
How many apartments are in 167 Eldridge Street?
It has 18 residential units and 19 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.