220 Avenue A
Manhattan, NY 10009BBL 1-00407-0006Map
Owner of record: 220 Ave A Partners, A Limited Liability Company
220 Avenue A is a walk-up apartment building built in 1900 in Manhattan, 10009. It has 16 residential units across 5 floors. The owner of record is 220 Ave A Partners, A Limited Liability Company. HPD has recorded 42 housing violations here, most recently on May 7, 2026. 7 of the 42 most recent violations are still open.
- HPD violations
- 42
- DOB violations
- 7
- ECB violations
- 14
- HPD complaints
- 67
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 42
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Feb 9, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1a upper level, 1st story, 1st apartment from east at south
Feb 9, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
May 13, 2025 · Apt 1B
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2024 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2024 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective the light fixture at south wall in the 1st room from east located at apt 1b lower level, 1st story, 1st apartment from west at north
Jul 29, 2024 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 1st room from east located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2024 · Apt 1B
Open — Defect letter issued - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at lower level in the 1st room from east located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2024 · Apt 1B
Closed — Violation closed
Show 32 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north , section ''west''
Jun 26, 2024 · Apt 1B
Open — Defect letter issued - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2019
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system paper sign at public hall, 1st story
Sep 30, 2018
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 30, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 30, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 30, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 30, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Sep 30, 2018
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Sep 30, 2018
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. located at apt 1d upper level, 1st story, 1st apartment from east at south , section ''rear''
Sep 28, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1d, 1st story, 1st apartment from east at south , section ''rear''
Sep 28, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 3rd room from east located at apt 1d lower level, 1st story, 1st apartment from east at south , section ''rear''
Sep 28, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 3rd room from east located at apt 1d lower level, 1st story, 1st apartment from east at south , section ''rear''
Sep 28, 2018 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of floor pierced with stairs creating duplex apartment into recreation room at cellar located at apt 1d, 1st story, 1st apartment from east at south , section ''east ''
Sep 28, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical ventilation system in the bathroom located at apt 1d upper level, 1st story, 1st apartment from east at south , section ''rear''
Sep 28, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Discontinue use of rooms for living purposes consisting of recreation rooms used for sleeping purposes with no natural light or ventilation at cellar located at apt 1d, 1st story, 1st apartment from east at south , section ''east ''
Sep 28, 2018 · Apt 1D
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story, section ''front''
Sep 28, 2018
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Sep 26, 2018
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 26, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 26, 2018
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 26, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Sep 26, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 26, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 1, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 1, 2016
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts minimum required (light fixtures present)
Apr 29, 2015
Closed — Violation dismissed
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 23, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 29, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 14
- Class - 2
Failure to comply with the commissioners order contained in summons/violation #35344588r issued on 10/29/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.occupancy contrary to th
Jun 8, 2019 · Penalty $625
Resolve - Class - 1
Removal or defaced a written posted vacate order from front entrance door to building. vacate order #m20 dated 02/14/19. rmdy: comply with code.
Apr 9, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35344588r issued on 10/29/18 and to file a certificate of correction pusuant to 28-201.1 and 1rcny 102-01.no c of c on file.rem:com
Mar 30, 2019 · Penalty $1,250
Resolve - Class - 2
Work without a permit note in apartment 1a a full 3pc bathroom with water and waste supply and full in closed sheet rock wall and doors for 2 bedrooms in cellar with spiral stair case to cell and apt 1b having
Feb 14, 2019 · Penalty $1,250
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy #85103 at time of inspection apartment 1a and 1b have been converted intoduplex apartment 1a having a 3pc bathroom and two sleeping bedroom in
Feb 14, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide fire alarm system for floor in cellar.rem:discontinue illegal occupancy.
Feb 14, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of requirednumber of mean of egress for every floor.per bc1018.1(2002 code 27-366;bc1021.1 2014 code).rem:discontinue illegal occupancy.
Feb 14, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of a systemof automatic sprinkler where is required as per pc903.2 and 27-954 from cellar apt 1a and 1b.rem:discontinue illegal occupancy.
Feb 14, 2019
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35344588r issued on 10-29-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for illegal occupancy. remedy: comply w/comm's order &/or file
Jan 28, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35344588r issued 10/29/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rem: comply with commissi
Dec 5, 2018 · Penalty $1,250
Resolve
Show 4 more ↓
- Class - 2
Work without a permit.noted: observed @ time of inspection in the cellar level under apt# 1d of the eastwing building constructed full height partition with door for creating 2 bedrooms & one 2-pieces bathroom
Oct 29, 2018 · Penalty $1,250
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records.noted:observed @ time of inspection apt#1d @ the 1st fl of the east wing building converted to duplex apt on co
Oct 29, 2018 · Penalty $2,500
Resolve - Class - 2
Occupancy contrary to that allowed by the c of o and department of buildings records. floor pierced with stairs installed illegally creatingduplex apartment into recreational rooms at cellar at apartment 1d
Sep 28, 2018
Resolve - Class - 2
B254,50. 50- outside metal chimney not shielded from touch min. 7'.
Sep 7, 2010 · Penalty $100
Resolve
Complaints
- Water leak
Heavy flow
Sep 1, 2026 · Apt 1A
Close - General
Bell/buzzer/intercom
Sep 1, 2026 · Apt 1A
Close - Electric
Power outage
Aug 17, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 7, 2026 · Apt 1B
Close - General
Bell/buzzer/intercom
Aug 7, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Aug 7, 2026 · Apt 1B
Close - Water leak
Heavy flow
Aug 7, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Aug 7, 2026 · Apt 1B
Close - General
Bell/buzzer/intercom
Aug 3, 2026 · Apt 1A
Close - Water leak
Heavy flow
Aug 3, 2026 · Apt 1A
Close
Show 40 more ↓
- Water leak
Heavy flow
Jul 18, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 6, 2026 · Apt 1A
Close - Plumbing
Radiator
Dec 11, 2024 · Apt 4C
Close - Flooring/stairs
Floor
Jul 25, 2024 · Apt 1B
Close - Paint/plaster
Ceiling
Jul 25, 2024 · Apt 1B
Close - Unsanitary condition
Pests
Jul 25, 2024 · Apt 1B
Close - Unsanitary condition
Pests
Jul 25, 2024 · Apt 1B
Close - Unsanitary condition
Pests
Jul 25, 2024 · Apt 1B
Close - Water leak
Damp spot
Jul 25, 2024 · Apt 1B
Close - Electric
Outlet/switch
Jul 25, 2024 · Apt 1B
Close - Water leak
Slow leak
Jun 24, 2024 · Apt 1B
Close - Outside building
Gutter/leader
Jun 24, 2024 · Apt 1B
Close - Plumbing
Radiator
Jun 24, 2024 · Apt 1B
Close - Plumbing
Radiator
Jun 24, 2024 · Apt 1B
Close - Door/window
Window pane
Jun 24, 2024 · Apt 1B
Close - Paint/plaster
Wall
Jun 24, 2024 · Apt 1B
Close - Unsanitary condition
Pests
Jun 24, 2024 · Apt 1B
Close - Unsanitary condition
Pests
Jun 24, 2024 · Apt 1B
Close - Heat/hot water
Entire building
Feb 25, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 25, 2024 · Apt 2A
Close - Water leak
Heavy flow
Apr 29, 2023 · Apt 1C
Close - Paint/plaster
Wall
Dec 13, 2022 · Apt 1B
Close - Unsanitary condition
Mold
Dec 13, 2022 · Apt 1B
Close - Water leak
Slow leak
Dec 13, 2022 · Apt 1B
Close - Unsanitary condition
Pests
Dec 13, 2022 · Apt 1B
Close - Unsanitary condition
Pests
Sep 1, 2022 · Apt 1B
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt 4B
Close - Unsanitary condition
Pests
Oct 5, 2018 · Apt 1D
Close - Water leak
Heavy flow
Sep 26, 2018 · Apt 1D
Close - Unsanitary condition
Mold
Sep 18, 2018 · Apt 1D
Close - Water leak
Heavy flow
Sep 18, 2018 · Apt 1D
Close - Heat/hot water
Entire building
Nov 1, 2017 · Apt 2A
Close - General
Bell/buzzer/intercom
Sep 26, 2017 · Apt 4C
Close - General
Bell/buzzer/intercom
Sep 26, 2017 · Apt 4C
Close - General
Bell/buzzer/intercom
Sep 26, 2017 · Apt 4C
Close - Unsanitary condition
Mold
May 20, 2016 · Apt 1C
Close - Heat/hot water
Apartment only
Feb 2, 2016 · Apt 4C
Close - Electric
Lighting
Apr 29, 2015 · Apt BLDG
Close - General
Locks
Jun 19, 2013 · Apt 2C
Close - General
Locks
May 4, 2012 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 5
- Residential units
- 16
- Building area
- 14,976 ft²
- Lot area
- 2,472 ft²
- Zoning
- C1-6A
- Community board
- 103
- Council district
- 2
- Block / lot
- 407 / 6
- Assessed value
- $1,678,950
- Landmark / historic district
- No
HPD registration #116835, last renewed Jul 22, 2026.
Questions about 220 Avenue A
Who owns 220 Avenue A?
The owner of record in NYC Department of City Planning PLUTO data is 220 Ave A Partners, A Limited Liability Company.
Does 220 Avenue A have violations?
Yes. NYC HPD has recorded 42 housing violations at this property.
Is 220 Avenue A rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 220 Avenue A built?
City records list 1900 as the year it was built.
How many apartments are in 220 Avenue A?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.
