roofy

23 Peck Slip

Manhattan, NY 10038BBL 1-00107-0042Map

Owner of record: Reda Water Street LLC

23 Peck Slip is an elevator apartment building built in 1900 in Manhattan, 10038. It has 20 residential units across 6 floors. The owner of record is Reda Water Street LLC. HPD has recorded 61 housing violations here, most recently on October 14, 2026. 8 of the 50 most recent violations are still open.

HPD violations
61
DOB violations
46
ECB violations
15
HPD complaints
74

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 61

  • C

    Remove device preventing door from being self-closing kick down stopper installed at vestibule door at public hall, 1st story

    Oct 14, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper chute door at public hall, 3rd story

    Sep 15, 2024

    Closed — Violation dismissed
  • A

    Provide a mirror in self-service elevator arranged so as to enable a person entering, to view inside of elevator number missing at public hall, 1st story

    Sep 15, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing kickstand at vestibule door at public hall, 1st story

    Jun 3, 2023

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing kickstand at building front entrance door at public hall, 1st story

    Jun 3, 2023

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room, 6th story

    Dec 16, 2022

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 2nd apartment from west at north

    Dec 16, 2022 · Apt 2B

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective ptac heating unit in the 1st room from north at west located at apt 2b, 2nd story, 2nd apartment from west at north

    Dec 16, 2022 · Apt 2B

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system.

    Jan 26, 2022

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall stairs, 6th story, section ''b'', at east

    Jan 26, 2022

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling at public hall stairs, 6th story, section ''b'', at east

    Jan 26, 2022

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story

    Jan 26, 2022

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story

    Jan 26, 2022

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling at public hall, 6th story

    Jan 26, 2022

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling approximately 4 square feet at public hall, 6th story

    Jan 26, 2022

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective at ceiling approxiametely 3 square feet at public hall stairs, 6th story, section ''b'', at east

    Jan 26, 2022

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling approximately 4 square feet at public hall, 6th story original violation 14793018 issued 26-jan-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jan 26, 2022

    Open — Defect letter issued
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of trash cans stored at public hall stairs

    Feb 20, 2019

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches at compactor closet

    Feb 20, 2019

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches at public hall stairs

    Feb 20, 2019

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall stairs at east , 6th story

    Sep 18, 2018

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall stairs, 6th story

    Sep 18, 2018

    Closed — Violation closed
  • A

    Remove device preventing door from being self-closing door stoppers at all fire doors at public hall, 3rd story

    Sep 18, 2018

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at public hall, 3rd story

    Sep 18, 2018

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 18, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 18, 2018

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall and ceiling in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east

    Sep 18, 2018 · Apt 3B

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs at east , 6th story

    Sep 18, 2018

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 6th story

    Sep 18, 2018

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 3rd story

    Sep 18, 2018

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of painted sprinkler heads at public hall, 3rd story

    Sep 18, 2018

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 18, 2018

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 18, 2018

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system key not on premises at public hall, 1st story

    Sep 18, 2018

    Closed — Violation dismissed
  • A

    Remove device preventing door from being self-closing hook and hasp at vestibule door at public hall, 1st story

    Sep 18, 2018

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of garbage and household items at public hall, 1st story

    Sep 18, 2018

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 3e, 3rd story, 2nd apartment from west at north

    Jun 26, 2017 · Apt 3E

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 26, 2017

    Open — Not complied with
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jun 26, 2017

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jun 26, 2017

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 26, 2017

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jun 26, 2017

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective located at apt 5a, 5th story, 1st apartment from south at west

    Oct 29, 2016 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 5a, 5th story, 1st apartment from south at west

    Oct 29, 2016 · Apt 5A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north at west located at apt 5a, 5th story, 1st apartment from south at west

    Oct 29, 2016 · Apt 5A

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at east wall in the 1st room from north at west located at apt 5a, 5th story, 1st apartment from south at west

    Oct 29, 2016 · Apt 5A

    Open — Nov certified late
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from south at west

    Oct 29, 2016 · Apt 5A

    Closed — Violation dismissed

DOB building violations · 46

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Aug 1, 2024

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Jul 9, 2024

    Dob violation - active
  • Construction other optional

    Borough commissioner stop work order application # 123238585. due to applicant withdrawal. site is closed and no work in progress observed for 1st floor.

    May 4, 2023

    Dob violation - active
  • Construction other optional

    Borough commissioner stop work order application # 123371608 due to applicant withdrawal. no access to commercial space. stop all work under job # listed and make site safe.

    Apr 26, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code-complaint manner. at rear ls 257 water street apt 2d terrace i observed section of masonry wall that was demoed & is exposed approx. 13 w x 20 h from 3rd to 4th floor for rear ls exp. 2 244 front street. adjacent bldg. poses a hazard to occupants at 257 water street apt 2d terrace for falling debris.

    Feb 13, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 8, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 19, 2020

    Dob violation - active
Show 36 more ↓
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2019

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    Cease use

    Mar 1, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 27, 2017

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 23, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 12, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 17, 2010

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 15, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 15, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 9, 2006

    Dob violation - resolved
  • Landmark none

    Landmk-landmark none

    Jun 15, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2004

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 21, 2003

    Dob violation - resolved
  • Landmark none

    Landmk-landmark none

    Jul 24, 2003

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 27, 2002

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 27, 2002

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Sep 27, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Mar 31, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Jul 15, 1997

    Dob violation - dismissed
  • Facade facade optional

    Ll1080-local law 10/80 - facade facade optional

    Jul 1, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Apr 25, 1991

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Nov 26, 1990

    Dob violation - dismissed
  • Landmark none

    Landmrk-landmark none

    Nov 26, 1990

    Dob violation - dismissed

ECB violations · 15

  • Class - 2

    Failure to maintain bldg in code compiant manner. exhaust discharge must be no closer than 10' from building openings as per rs 2-21.4 and mc 401.5.2. note the ground floor eating/drinking establishment, kitche

    May 1, 2018 · Penalty $1,250

    Active
  • Class - 2

    Sec. 287-317.3 failure to register cooling tower. remedy: comply w/code.

    Sep 21, 2015 · Penalty $4,000

    Active
  • Class - 1

    Failure to comply with an order of the commissioner. respondent failedto correct conditions in #34699096-r in apt 3-e erected full height partitions. remedy: comply w/code.

    Nov 12, 2009 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/an order of the commissioner to obtain permits foron 3fl in apt 3e.erected full height partition as per #34699096r.remedy:obtain dob permit.

    Jun 8, 2009

    Resolve
  • Class - 2

    02x10.41m7.41d6.42m7 02x 2way communication 41m provide signage 42m controller missing nyc id # and car top

    May 6, 2009

    Resolve
  • Class - 2

    Failed to notify dept prior to use installation of outrigger beams in connection w/ suspended scaffold noted suspended scaffold at exp #4 hanging fron outrigger beams no notification is system rem: notify the d

    May 4, 2009 · Penalty $800

    Resolve
  • Class - 1

    Failed to file evidence of compliance w/worker's compand disability b enefits law noted suspended scaffold installed at exp #4 insurance exp3/24 and 3/27/09 w/ the state insurance fund rem: obtain maintain work

    May 4, 2009 · Penalty $1,250

    Resolve
  • Class - 2

    Work does not conform to approved construction documents/amendmentsno ted suspended scaffold at exp #4 the outrigger beams are not parallel w/ the facade and one life line is not protected against sharp edges r

    May 4, 2009

    Resolve
  • Class - 2

    Altered/changed bldg occupied w/o a valid c of o as per 28-118.3.1 -28-118.3.2. noted: tco #1p0008612t002 expired on 6/11/08 & was not renewed at time of inspection.remedy:obtain valid c of o and/or discontinue

    Jan 16, 2009 · Penalty $500

    Resolve
  • Class - 2

    Altered/changed bldg occupied w/o a valid cert of occupancy as per 28-118.3.1 28-118.3.2 temporary c/o #1p00086012 expired 06/08 rem: obtain valid c/o

    Jan 14, 2009 · Penalty $500

    Resolve
Show 5 more ↓
  • Class - 1

    Work w/o a permit.noted:@ the north west side of bldg @ the 3 fl in apt 3e.erecting full height partitions,electrical & plumbing work being done.work is 70% complete.remedy:stop all work immediately/obtain perm

    Oct 2, 2008 · Penalty $800

    Resolve
  • Hazardous

    No sidewalk shed:approx 15'-0 long section of cornices at roof level was damage due to fire (in june 06) how at time of inspection the same damage section of cornices is loose & hanging & in danger of collapse

    Jul 19, 2007 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to maintain bldg roof top-protective guard rail relocated and leaving unprotective opening at front of roof approx. 4' foot opening.remedy: replace protective railing.

    Nov 7, 2005 · Penalty $2,500

    Resolve
  • Non-hazardous

    03b 43z 36b 5q 15f 55q 02d 74b (03#) provide phones (43#)pump unit le aking oil(36)laberl provide lock & make self closing (25) provide cover(150 hoisting door lost motion (55)provide light bulb caged

    Oct 6, 1999

    Resolve
  • Non-hazardous

    43y,74u,57o,73x, 74-3 year test and tag 73-return to service for complete inspection.

    Jun 25, 1998

    Resolve

Complaints

  • Paint/plaster

    Ceiling

    Oct 3, 2026 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Oct 3, 2026 · Apt 5B

    Close
  • General

    Ventilation system

    Oct 3, 2026 · Apt 5B

    Close
  • Plumbing

    Toilet

    Oct 20, 2025 · Apt 2C

    Close
  • Plumbing

    Toilet

    Oct 17, 2025 · Apt 2C

    Close
  • Plumbing

    Toilet

    Oct 16, 2025 · Apt 2C

    Open
  • Plumbing

    Toilet

    Oct 16, 2025 · Apt 2C

    Open
  • Heat/hot water

    Apartment only

    Mar 21, 2023 · Apt 2E

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2023 · Apt 2B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 18, 2023 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Feb 7, 2023 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2023 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2022 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2022 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 11, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 30, 2022 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 12, 2022 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Jan 12, 2022 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2021 · Apt APT3A

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2021 · Apt APT3A

    Close
  • Plumbing

    Water supply

    Mar 11, 2019 · Apt 5A

    Close
  • Door/window

    Door

    Mar 9, 2019 · Apt 5A

    Close
  • Door/window

    Door

    Feb 25, 2019 · Apt 5A

    Close
  • Door/window

    Door

    Feb 25, 2019 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Jan 4, 2019 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Jan 4, 2019 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Jan 4, 2019 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Jan 4, 2019 · Apt 6A

    Close
  • Unsanitary condition

    Pests

    Jan 4, 2019 · Apt 6A

    Close
  • Safety

    Carbon monoxide detector

    Sep 14, 2018 · Apt 2D

    Close
  • Unsanitary condition

    Pests

    Aug 8, 2018 · Apt 3B

    Close
  • Door/window

    Door

    May 20, 2018 · Apt 4E

    Close
  • Heat/hot water

    Apartment only

    May 20, 2018 · Apt 4E

    Close
  • Unsanitary condition

    Pests

    May 20, 2018 · Apt 4E

    Close
  • Heat/hot water

    Apartment only

    Apr 30, 2018 · Apt 12E

    Close
  • Heat/hot water

    Entire building

    Apr 29, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 10, 2018 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Jan 9, 2018 · Apt 2E

    Close
  • Water leak

    Heavy flow

    Jan 9, 2018 · Apt 2E

    Close
  • Water leak

    Heavy flow

    Jan 9, 2018 · Apt 2E

    Close
  • Water leak

    Heavy flow

    Jan 9, 2018 · Apt 2E

    Close
  • Heat/hot water

    Apartment only

    Dec 18, 2017 · Apt 4F

    Close
  • Unsanitary condition

    Pests

    Jun 23, 2017 · Apt 3E

    Close
  • Unsanitary condition

    Pests

    Jun 23, 2017 · Apt 3E

    Close
  • Unsanitary condition

    Pests

    Jun 21, 2017 · Apt E3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
1900
Floors
6
Residential units
20
Building area
25,903 ft²
Lot area
5,866 ft²
Zoning
C6-2A
Community board
101
Council district
1
Block / lot
107 / 42
Assessed value
$4,847,850
Landmark / historic district
South Street Seaport Historic District

HPD registration #140331, last renewed Feb 2, 2026.

Questions about 23 Peck Slip

Who owns 23 Peck Slip?

The owner of record in NYC Department of City Planning PLUTO data is Reda Water Street LLC.

Does 23 Peck Slip have violations?

Yes. NYC HPD has recorded 61 housing violations at this property.

Is 23 Peck Slip rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 23 Peck Slip built?

City records list 1900 as the year it was built.

How many apartments are in 23 Peck Slip?

It has 20 residential units and 24 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.