222 Broadway
Manhattan, NY 10038BBL 1-00089-0012Map
Owner of record: Broadway 2024 Propco, LLC
222 Broadway is an elevator apartment building built in 1961 in Manhattan, 10038. It has 788 residential units across 31 floors. The owner of record is Broadway 2024 Propco, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 224
- ECB violations
- 69
- HPD complaints
- 10
Available now in this building
For rentstudio condo for rent in financial district
New York, NY
For rentstudio condo for rent in financial district
New York, NY
For rentstudio condo for rent in financial district
New York, NY
For rentstudio condo for rent in financial district
New York, NY
For rent1-bedroom condo for rent in financial district
New York, NY
For rent1-bedroom condo for rent in financial district
New York, NY
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 224
- Construction other optional
Emergency work:structural cracking observed in bm33-04.immediate stabilization and repair are required for structural cracking in bm33-04.remedy:immediately stabilize and repair bm33-04 under full- time nys pe,sia,ssm and cs.signed and sealed sketches are required.an app must be open to reflect shoring repair w/in 2days of commencement
Aug 4, 2026
Dob violation - dismissed - Construction other optional
At the time of inspection:observed a crack occured at bottom of middle 18x54concrete beam at emr floor.the structural failure represents a potential hazard to the public.remedy:immediately develop&implement monitoring protocol:optical monitoring 2xweek-crack monitor 2xweek- mandate weekly report to dob.ceu needs all info starting 7/26/26
Jul 27, 2026
Dob violation - dismissed - Construction other optional
Peer review-dept ordering a peer review of the structural design & relevant,associated special reports/shop drawings.two 14x48beams exhibited signs of shear failure.one 18x54 beam was observed to have signs of flexure failure.remedy:provide names of 3 nys pe's by 8/5/26 submit peer review report pursuant to bc 1618 by 8/24/26
Jul 27, 2026
Dob violation - dismissed - Construction other optional
Failure to immediately notify the department.immediately stop all construction work (full stop work order) comply with department and code requirements
Jul 23, 2026
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 19, 2020
Dob violation - resolved
Show 40 more ↓
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 23, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 23, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 23, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2018
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2017
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed
ECB violations · 69
- Class - 1
Responding to an incident where a worker slip and fall on metals studs causing his to get a cut on his left thumb. inspection revealed that there where metal studs spread out at the working location which contr
Sep 28, 2026 · Penalty $2,500
Active - Class - 1
Responding to an incident where a trash truck hit the sidewalk shed vertical member at the corner of broadway and ann street while backing into the site. inspection revealed that there were not adequate flag pe
Sep 23, 2026 · Penalty $10,000
Active - Class - 1
Responding to an incident where a trash truck hit the sidewalk shed vertical member at the corner of broadway and ann street while backing into the site. upon reviewing the approved site safety plan it was note
Sep 23, 2026 · Penalty $2,500
Active - Class - 1
Bc 1704.1.1.2(2022 code). failure to report conditions noted as hazardous to life, safety or health that are not immediately corrected to the immediate attention of the commissioner. as noted: on july 11th 2026
Jul 23, 2026 · Penalty $2,500
Resolve - Class - 1
Bc 1704.1.1.2(2022 code). failure to report conditions noted as hazardous to life, safety or health that are not immediately corrected to the immediate attention of the commissioner. as noted: on july 23rd 2026
Jul 23, 2026 · Penalty $2,500
Resolve - Class - 1
Failure to maintain or report a building or other structure is dangerous or unsafe in writing to the department. on july 11th dob performed a site inspection finding cast-in-place concrete beams at 32nd floor a
Jul 23, 2026 · Penalty $2,500
Resolve - Class - 1
Failure to maintain or report a building or other structure is dangerous or unsafe in writing to the department. on july 23rd dob performed a site inspection finding cast-in-place concrete beams at 33rd floor a
Jul 23, 2026 · Penalty $2,500
Resolve - Class - 1
General contractor/permit holder failed to promptly notify the department of an incident as required. as noted: on july 11th 2026 dob performed a site inspection and observed that no notification was submitted
Jul 23, 2026 · Penalty $25,000
Resolve - Class - 1
Construction superintendent failed to immediately notify the department of an incident as required. as noted: on july 23rd 2026 dob performed a site inspection and observed that no notification was submitted to
Jul 23, 2026 · Penalty $12,500
Resolve - Class - 1
Site safety manager failure to immediately notify the department of anincident as required. as noted: on july 23rd 2026 dob performed a siteinspection and observed that no notification was submitted to the depa
Jul 23, 2026 · Penalty $12,500
Resolve
Show 40 more ↓
- Class - 1
General contractor/permit holder failed to promptly notify the department of an incident as required. as noted: on july 23rd 2026 dob performed a site inspection and observed that no notification was submitted
Jul 23, 2026 · Penalty $25,000
Resolve - Class - 1
Construction superintedent failed to adequately discharge the duties of a construction superintendent. as noted: three cast-in-place concrete beams located at two separate areas of the 32nd floor and a beam loc
Jul 23, 2026 · Penalty $25,000
Resolve - Class - 1
Construction superintendent failed to immediately notify the department of an incident as required. as noted: on july 11th 2026 dob performed a site inspection and observed that no notification was submitted to
Jul 23, 2026 · Penalty $25,000
Resolve - Class - 1
Failure to safeguard the public and property affected by construction operation. as noted: three cast-in-place concrete beams located at twoseperate areas of the 32nd floor and a beam located at 33rd floor elev
Jul 23, 2026 · Penalty $25,000
Resolve - Class - 1
Bc 1705.25(2022 code). registered design professional failed to prepare and file with the department design documents for structural stability measures as required. as noted: on july 11th 2026, dob performed a
Jul 11, 2026 · Penalty $2,500
Resolve - Class - 1
Ac 28-104.3(2022 code). engineer of record failed to submit and obtainapproval of amended construction documents prior to commencing work effecting versions to the approved structural design. as noted: on july
Jul 11, 2026 · Penalty $2,500
Resolve - Class - 1
Site safety manager failure to immediately notify the department of anincident as required. as noted: on july 11th 2026 dob performed a siteinspection and observed that no notification was submitted to the depa
Jul 11, 2026 · Penalty $12,500
Resolve - Class - 2
Work does not conform to approved construction documents.as noted during inspection of the 32nd floor,observed steel plates post installed with threaded rods and welded connections covering a concrete beam whic
Jul 11, 2026 · Penalty $1,250
Resolve - Class - 2
Failure to provide pe design drawings required by bc chapter 33.as noted upon inspection of steel and concrete framing.observed hss column installed at 32nd floor.unclear if hss column is installed per eor desi
Jul 11, 2026 · Penalty $1,250
Resolve - Class - 2
Response to an incident where a worker hurt his back when lifting an heavy material from the truck an ambulance was called inspection reveal the delivery truck was not at the same height with loading dock which
Jul 8, 2026 · Penalty $5,000
Active - Class - 2
At time of inspection of an office construction site into a residential building i observed additional construction fence installed at exposure # 3 with turnstile and panic door incorporated on it, upon review
Jul 8, 2026
Resolve - Class - 1
Responding to an incident where a grinder became entangled in a worker's t-shirt causing the wheel to get stuck in his left arm. inspection revealed that a that the worker did not maintain a firm grip on the t
Jun 11, 2026 · Penalty $10,000
Resolve - Class - 2
Note: at time of inspection on a active constrictions site, i observed on the 19th floor there were multiple temporary storing in place supporting the vertical loads, upon request for design drawing to verify s
Jun 11, 2026 · Penalty $2,500
Resolve - Class - 1
Responding to an incident where a grinder became entangled in a worker's t-shirt causing the wheel to get stuck in his left arm. inspection revealed that the platform ladder which were being used at the time o
Jun 11, 2026 · Penalty $2,500
Resolve - Class - 1
Responding to an incident where a grinder became entangled in a worker's t-shirt causing the wheel to get stuck in his left arm. upon reviewing the pre-shift safety meeting inspection reveals that the activiti
Jun 11, 2026 · Penalty $5,000
Resolve - Class - 2
Responding to an incident where a worker were standing on a pile of wooden trim while painting the walls. inspection revealed that the wood trim was inadequately stored resulting in an unstable work surface whi
Jun 11, 2026
Resolve - Class - 1
Note: at time of inspection of a 32-story building with active interior demolition operations, i observed that the demolition work being done is more than 50 percent of the gross floor area, upon reviewing the
Jun 11, 2026 · Penalty $10,000
Resolve - Class - 1
Note: at time of inspection of a 32-story building with active construction operations, with alterations and conversions work being done, upon reviewing the dob records it was noted that the permit had been ex
Jun 11, 2026 · Penalty $2,500
Resolve - Class - 2
Observed supported scaffolding seated on cantilever platforms from 28th floor to roof at exposures 3 & 4. the scaffold has 3 fully planked platform levels, upon review of approved plans its states only 1 fully
Jun 5, 2026
Resolve - Class - 1
At time of inspection, observed result of unsafe construction operations where worker fell on third floor staircase to second floor while transporting materials during construction operations. gc failed to inst
May 13, 2026 · Penalty $5,000
Resolve - Class - 1
At time of inspection, observed that gc failed to immediately notify the department of buildings, of worker injury incident occurring at approximately 8:45 am, where worker fell on third floor stair to second f
May 13, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection, i observed snow on sidewalk shed deck at exposure #1 & 3# was not removed / adequately removed from snow storm occured on 01-25-2026 - 01-26-2026 as per code section bc 3307.6.5.5.
Feb 7, 2026 · Penalty $2,400
Resolve - Class - 1
At the time of inspection, two workers were observed working on a stacked baker scaffold without the required outriggers. additionally, a platform ladder was being used to access and exit the scaffold. this con
Dec 15, 2025 · Penalty $2,500
Resolve - Class - 1
Responding to an incident where a worker got hit to the head with a metal pipe on the 16 floor. inspection revealed that the follow bar was displaced not giving adequate bottom support, the saddle unit assembly
Dec 15, 2025 · Penalty $2,500
Resolve - Class - 2
At time of inspection, observed generator stored on public street with no valid dot permit for use or placement. contrary to bc 3301.2 and bc 3307.8, failure to maintain required authorization and safeguards fo
Nov 20, 2025 · Penalty $625
Resolve - Class - 1
At time of inspection, observed failure to notify the department of an incident on 10/16/2025 (complaint #1707349) where a worker fell from a 6-foot platform ladder while screwing a stud into a wall on the 4th
Nov 14, 2025 · Penalty $10,000
Resolve - Class - 1
Responding to an incident where a worker fell from a 6-foot platform ladder while screwing a stud into the wall on the 4th floor. inspection revealed debris and loose materials were scattered around the base of
Oct 16, 2025 · Penalty $2,500
Resolve - Class - 2
At time of inspection i observed sidewalk shed installed on exposures # 1 and 2 without the required hunter green color specification bc 3307.6.4.11 , the shed was painted white colorby comply with color spec
Aug 7, 2025 · Penalty $2,400
Resolve - Class - 1
At time of inspection of a building under facade permit and window replacement , i observed demolition of permanent stairs b in the building which is under separate structure permit, upon request to view the pe
May 28, 2025
Resolve - Class - 2
Bc 3303.9 at time of inspection of a building under alteration and demo permit, i observed demolition of existing structure element permanent stairs b in the building from 13 to 6 floor and inspection reveal th
May 28, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a building under demolition permit , i observed demolition of permanent stairs b in the building upon review the approved plan and to verify compliance the demolition of stair does not
May 28, 2025 · Penalty $625
Resolve - Class - 3
Work does not conform to approved construction documents and/or approved amendments. noted: at 16 floor level at multiple location plan showwindows found no window (window blocked with bricks and mortar at appr
Sep 28, 2018 · Penalty $500
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments for job #123150491. noted: 23rd fl male bathroom fixture count and location not as planned. (plan shows 5 water & waste, found
Sep 11, 2018 · Penalty $500
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000000911 hasbeen inspected,tested,and disinfected,and that a maintenance plan has been developed and implemented by november,1,2016.rem:file annual cert
Jun 20, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000000917 hasbeen inspected,tested,and disinfected,and that a maintenance plan has been developed and implemented by november,1,2016.rem:file annual cert
Jun 20, 2017 · Penalty $1,000
Resolve - Class - 1
08-v-01:(cease use (08-v-01)adjust all fl stops so that car (stop) level @each landing.call chief al (manshall) @2212-393-2488 for re-insp cease use)
Apr 4, 2016 · Penalty $1,000
Resolve - Class - 3
Work does not conform to approved construction documents &/or approvedplan. note: 20'height plywood enclosure installed at broadway & ann stcorner permit #140158941 is blocking/obstructing view approx 90% of
Nov 22, 2014 · Penalty $200
Resolve - Class - 2
Failure to maintain bldg wlal or appurtenances. noted:a front facade fabric sign attached to bldg in danger of falling.defective sign is detached at the bottom of sign support and swinging around. see photos
Oct 9, 2014
Resolve - Class - 2
27-292.1&1105.1 people w/ physical disabilities:public spaces/rooms not accessible/usable.noted:handicap access door for people w/ physical disabilities does not open from exterior or interior.no personnel resp
May 15, 2014 · Penalty $830
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. noted: pcs of brick and mortar dust are falling onto the public sidewalk. no overhead protection provided. also hole have been
Mar 12, 2014 · Penalty $1,200
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 16, 2026 · Apt 1319
Close - Unsanitary condition
Garbage/recycling storage
Sep 30, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 7, 2017 · Apt 39
Close - Safety
Carbon monoxide detector
May 13, 2014 · Apt 18
Close - Safety
Window guard broken/missing
May 13, 2014 · Apt 18
Close - Safety
Window guard broken/missing
May 13, 2014 · Apt 18
Close - Heat/hot water
Entire building
Apr 19, 2014 · Apt BLDG
Close - Heating
Heat related
Nov 9, 2013 · Apt NA
Close - Heating
Heat related
Mar 5, 2012 · Apt 15
Close - Heating
Heat related
Jan 12, 2004 · Apt 28
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1961
- Floors
- 31
- Residential units
- 788
- Building area
- 762,175 ft²
- Lot area
- 33,340 ft²
- Zoning
- C5-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 89 / 12
- Assessed value
- $98,695,625
- Landmark / historic district
- No
HPD registration #145427, last renewed Jul 24, 2026.
Questions about 222 Broadway
Who owns 222 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Broadway 2024 Propco, LLC.
Does 222 Broadway have violations?
NYC HPD has no housing violations on record for this property.
Is 222 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 222 Broadway built?
City records list 1961 as the year it was built.
How many apartments are in 222 Broadway?
It has 788 residential units and 790 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.