82 Wall Street
Manhattan, NY 10005BBL 1-00039-0001Map
Owner of record: 88 Wall Street LLC, A Delaware LLC
82 Wall Street is a hotel built in 1905 in Manhattan, 10005. It has 170 residential units across 16 floors. The owner of record is 88 Wall Street LLC, A Delaware LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 68
- ECB violations
- 53
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 68
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 5, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 5, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 5, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 5, 2021
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 1, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 1, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Feb 21, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2015
Dob violation - resolved - High pressure boiler boiler required
Hblvio-high pressure boiler boiler required
Jan 28, 2015
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 18, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2010
Dob violation - resolved
ECB violations · 53
- Class - 2
Atol,violation#356668550m issued 6/10/2025 cited workers performing unpermitted work on spalling awning panels at exposure 1 of 88 wall st no violating conditions observed.sign-off permit#m01290376-i1-gc on fil
Aug 19, 2026 · Penalty $1,250
Active - Class - 1
No certificate of correction on file as per request of commissioner for class 1 work with out permit violation #35668550m issued on 6/10/2025 for workers observed installing awning panels at exposure 1.no permi
Feb 11, 2026 · Penalty $2,500
Active - Class - 2
Marquee at 88 wall street. observed one tempered glass panel that has shatter but still in place. remove and replace damage glass., repair and/or replace
Aug 19, 2025
Resolve - Class - 1
Work without permit.at time of inspection observed workers in spallingawning panels at exp#1 front of hotel 88 wall street with no permit noflagging no pedestrian projection.these hazardous conciting is a denye
Jun 10, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection noted workings installing awning panels at exp1 front of hotel 88 wall street with no permit, obtain permit
Jun 10, 2025
Resolve - Class - 2
Failure to provide protection over sidewalk during construction operations.installing new awnings at 2nd floor with manlift.also no dot permits for sissorlift in street.rem:stopwalk obtain permits.
Jun 10, 2025 · Penalty $2,400
Active - Class - 1
Failure to designate site safety manager.noted at time of inspection at an active jobsite,upon request to see the site safety logs it was provided.upon reviewing the logs,observed the site safety manager on the
Sep 28, 2021 · Penalty $5,015
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.noted at time of inspection at an active jobsite,observed inadequate construction housekeeping on 14 and 15 floor which made up of construction
Sep 28, 2021 · Penalty $640
Resolve - Class - 2
3303.7.2 inadequate fire extinguisher.noted at time of inspection at an active jobsite,observed from 16-cellar some floors missing fire extinguisher and place on the floor.remedy:comply with nyc fire code.
Sep 28, 2021 · Penalty $640
Resolve - Class - 2
Gas shut off valve to be accessable as per fgc-409.5.1 base of venting missing neutralizing kit as per fgc-307.2.1. relief valve settings on construction document dont match job as per fgc-106.7
Jul 8, 2021
Resolve
Show 40 more ↓
- Class - 2
Failure to institute&maintain all safety measures provided all equipment necessary to safeguard public&property note:@time of my insp of 12sty unoccupied bldg under alt active jobsite.i observed on exp3 no over
Apr 5, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to safeguard all persons&property affected by const operations-stop all work on 14fl w/parapet wall below42" stay back 15' from parapet wall.note:@time of my insp of 12stybldg unoccupied active jobsite
Apr 5, 2021 · Penalty $5,000
Resolve - Class - 1
Preshift safety meeting for personnel to ensure safety const operations during daily const operations.note:@time of my insp of 12sty unoccupied bldg under alt active jobsite.upon request for daily safety preshi
Apr 5, 2021 · Penalty $5,030
Resolve - Class - 2
At time of inspection,observed an going construction activities contrary to mayors emergency executive order 120 & subsequent orders in corporating requirements of governors executive order 202.8.4 & subsequent
Jul 30, 2020 · Penalty $5,000
Resolve - Class - 2
@time of inspection observed ongoing const activities contrary to governor's executive order #202.3 & subsequent orders & gauidance published or empire state development cord. pursuant to (same) state developme
May 4, 2020 · Penalty $1,250
Resolve - Class - 1
Failed to provide workers comp.at time of inspection observed concretetruck pump on exp #4.crew inside structure doing concrete operation. structure under permit 121189418 under permit permit holder magnetic
Apr 29, 2020
Resolve - Class - 2
Inadequate concrete wash out.observed concrete pump & transit mixer on exp #2, current operation involving concrete pour.observed run off consisting of mainly concrete leading into storm drain w/a concerning
Apr 29, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to institute & maintain safety equipment measures & temporary construction. note: at the time of my inspection of a 13 sty alteration construction work in progress,i observed workers accessing open elev
Feb 14, 2020 · Penalty $625
Resolve - Class - 1
Failed to ensure worker attend pre-shift safety meeting. ote: at the time of my inspection of a 13 sty alteration construction work in progress that consist carpetry & demolition upon request for pre-shift meet
Feb 14, 2020
Resolve - Class - 1
Sec. 3303.4.2 dumpster container. at time of my inspection of a 13 sty bldg. i observed yard container at exp#2 fall of debris & bldg materials above limit. i also observed no cover was provided to cover dumpst
Feb 14, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to perform successful hydrostatic pressure test of standpipe. note at the time of my inspection 16 sty bldg at the 14 fl level w/construction work in progress. upon review of dept record & request for
Feb 14, 2020 · Penalty $625
Resolve - Class - 1
Storage of combustible material & equipment. note: at the time of my inspection of an 16 sty bldg on the 13 fl. i observed 2 flammable combustible compressed gas tanks inadequately stored at the 5 fl office for
Feb 14, 2020 · Penalty $625
Resolve - Class - 1
Sec. 3301.1.2 comply w/fdny fire code. note: at the time of my inspection of an 16 sty bldg on the 13 fl. i observed on lebvel 13 one work doing hot wokr w/no fire guard in place. upon request for the fire guar
Feb 14, 2020 · Penalty $625
Resolve - Class - 1
Housekeeping. note: at the time of my inspection of an 16 sty bldg on the 13 fl. i observed on 8 fl & 13 fl large amount debris on floor that can cause tripping & falls. remedy: provide & maintain adequate hous
Feb 14, 2020 · Penalty $625
Resolve - Class - 1
Failure to comply w/manufacturer specification at the time of my inspection of an 19 sty bldg site no work was take place at the time i observed an yodock for the protection of the public not full as required
Feb 14, 2020 · Penalty $625
Resolve - Class - 1
Inadequately guardrail. note: at the time of my inspection of a 16 stybldg on the 13th fl. i observed from 4th fl through 12th fl inadequateguardrail system protecting the elevator shaft. upon checking guardrai
Feb 14, 2020
Resolve - Class - 1
Work does not conform to approved site safety plan. at the time of my inspection of an 16 sty bldg on the 13 fl. i observed & need u beam at exp#4 w/work in progress. upon request to see site safety plan needle
Feb 14, 2020 · Penalty $625
Resolve - Class - 1
3309.10 roof protection.at the time of my inspection of a 16 stories active jobsite,i observed work being done at exp 3 and there was no roof protection for the adjacent property roof protection is needed for t
Feb 14, 2020 · Penalty $2,500
Resolve - Class - 1
3308.5=inadequate netting note at time of inspection on an actiev 16 story alteration job siet i observed at first and second floor inadequate and missing vertical netting on guardail by the open c joist creain
Dec 5, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping. note:at time of inspection on active 16 stories alteration job site i observed inadequate housekeeping at various location of the floors consisting of metals and debri
Dec 5, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain record of preshift safety meeting for eahc workers note at time of my inspection on an atciev 16 stories alteration jobsiet upon requets for daily pre shift saftey meeting log for workers
Dec 5, 2019 · Penalty $625
Resolve - Class - 2
Ac 27-929.1, failure to complete the installation of a full system of automatic sprinklers & file a final sprinkler report prepared by a registerd design professional by july 1, 2019 in an office bldg 100 feet
Nov 15, 2019
Resolve - Class - 2
Ac 27-929.1, failure to complete the installation of a full system of automatic sprinklers & file sprinkler report prepared by a registerd design professional by july 1, 2019, in an office building 100 feet or
Nov 15, 2019
Resolve - Class - 2
Pedestrian protection does not meet code specifications.entire sws wa s in the dark and no lights were illuminated at the time of inspection.this is a potentially hazardous condition.sws showed bis illuminated
Oct 2, 2019 · Penalty $2,400
Resolve - Class - 2
97x10,98bb5,99bb5. 97x10 entire device inoperative repair/file for dismantle.98bb5,99bb5 current cat5 & cat1 expired file & perform test.
Feb 26, 2018 · Penalty $1,250
Resolve - Class - 3
Failure to maintain bldg & appurtenances. noted: sidewalk not adequately maintained in that sidewalk section 24" x 24" has collasped creating irregular shafted hole & affecting pedestrian safety & live load
Feb 6, 2013 · Penalty $250
Resolve - Class - 3
Failure to maintain bldg & appurtenances. noted sidewalk not adequately maintained in that sidewalk section approx 24"x 24" has collapsed creating irregular shaped hole & affecting pedestrian safety & line load
Oct 15, 2012 · Penalty $200
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: no fire stopping inelectrical closets - floors 6,9 and 12. remedy: provide/maintain fire stopping.
Jul 25, 2008
Resolve - Non-hazardous
58h11 75u05 74u05 28#guide shoes worn 75#five year test tag 74#two year tag reshacklies
Jul 10, 2000
Resolve - Non-hazardous
75b5,33a9,33m7. -75 perform 5 year full load safety test and file withthis dept, -33 remove all non elevator materials from overhead second ary area, -33 provide lighting
Oct 30, 1998
Resolve - Non-hazardous
50*-removed otis motor without permit. remedy: file for obtain permit have test by this dept.
Jul 7, 1997 · Penalty $350
Resolve - Non-hazardous
50 removed otis motor without permit. remedy: file for-obtain permit-have test by this dept
Jul 7, 1997 · Penalty $350
Resolve - Non-hazardous
50d,57o.50-unsafe wiring to hoist motor.weeds to secure properly.57-clean pit.
Dec 13, 1995
Resolve - Non-hazardous
75u,50f.75-5yrs test perform & file.50-excessive noise on drum sheive.
Dec 13, 1995 · Penalty $200
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84-certifing to the installation of required fire protection system remedy file reports
Jul 25, 1995 · Penalty $400
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifyingto the installation of required fire protection systems. remedy: filereport.
Jun 30, 1995
Resolve - Non-hazardous
74-return to service or file for dismantlng 74a repair floor grill over hoistway
Jun 22, 1995 · Penalty $200
Resolve - Non-hazardous
74-return to service or for disdantline
Jun 22, 1995 · Penalty $200
Resolve - Hazardous
Exit passageway: total obstruction noted: the fire passageway exit door closed with illegal hardware-lock and chain . location: basemnt south east leading to water st off wall street. remedy: remove obstruc
Aug 31, 1994 · Penalty $650
Resolve - Non-hazardous
53b,15l,49t,73t,73 perform 5 yr test, properly date & tag governor & file elev. form 3 with this department
Aug 22, 1991
Resolve
Complaints
- Heating
Heat related
Feb 19, 2013 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H1)
- Year built
- 1905
- Floors
- 16
- Residential units
- 170
- Building area
- 122,157 ft²
- Lot area
- 10,200 ft²
- Zoning
- C5-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 39 / 1
- Assessed value
- $26,589,150
- Landmark / historic district
- No
Questions about 82 Wall Street
Who owns 82 Wall Street?
The owner of record in NYC Department of City Planning PLUTO data is 88 Wall Street LLC, A Delaware LLC.
Does 82 Wall Street have violations?
NYC HPD has no housing violations on record for this property.
Is 82 Wall Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 82 Wall Street built?
City records list 1905 as the year it was built.
How many apartments are in 82 Wall Street?
It has 170 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.