148-05 88 Avenue
Queens, NY 11435BBL 4-09694-0065Map
Owner of record: Raj Equities INC
148-05 88 Avenue is a walk-up apartment building built in 1970 in Queens, 11435. It has 8 residential units across 3 floors. The owner of record is Raj Equities INC. HPD has recorded 138 housing violations here, most recently on July 12, 2026. 31 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 138
- DOB violations
- 59
- ECB violations
- 8
- HPD complaints
- 118
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 138
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Jul 12, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd story balcony at stack at south at building front at fire escape
Apr 29, 2026
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of garbage cans preventing drop ladder from free falling at stack at south at building front at fire escape
Apr 29, 2026
Open — Nov certified late - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at building entrance door at public hall, 1st story
Mar 9, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north located at apt 1b lower level, 1st story, 1st apartment from west at north
Mar 9, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement at boiler room
Mar 9, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Mar 9, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at building entrance door at public hall, 1st story
Feb 28, 2026
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Jan 5, 2026 · Apt 3A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the closet at west in the 3rd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Jan 5, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical wire at ceiling in the 3rd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Jan 5, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt ga, 1st apartment from west at north
Dec 8, 2025 · Apt GA
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt ga, 1st apartment from west at north
Dec 8, 2025 · Apt GA
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt ga, 1st apartment from west at north
Dec 8, 2025 · Apt GA
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt ga, 1st apartment from west at north
Dec 8, 2025 · Apt GA
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt ga, 1st apartment from west at north
Dec 8, 2025 · Apt GA
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective ceiling light fixture in the 2nd room from east located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures ceiling light fixture in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate . in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from east located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic wall tiles at north in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Open — Nov sent out - ANon-hazardous
Refit closet door at south wall in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at ceiling and north wall in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from west at north original violation 18123828 issued 31-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jul 31, 2025 · Apt 1B
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak north wall and ceiling in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at ceiling and north wall in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Jul 31, 2025 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
May 7, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door hinges , 1st story
May 7, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective inoperative light fixture at ceiling in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south
Jan 12, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling within closet in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from east at south
Dec 27, 2024 · Apt 3A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from east at south
Dec 27, 2024 · Apt 3A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 3a, 3rd story, 1st apartment from east at south
Dec 27, 2024 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from east at south
Dec 27, 2024 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Dec 27, 2024
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
Dec 27, 2024 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall
Dec 27, 2024
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from east at south
Dec 27, 2024 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from east at south
Dec 27, 2024 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Dec 27, 2024 · Apt 3A
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Oct 22, 2024 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Oct 22, 2024 · Apt 1A
Open — Notice of issuance sent to tenant
DOB building violations · 59
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active
ECB violations · 8
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 40000947301y0003 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Sep 27, 2024 · Penalty $3,125
Active - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 40000947301y0004 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Sep 27, 2024 · Penalty $3,125
Active - Class - 2
Failure to comply with the commissoner's order contained in violation and to file a cerfiicate of correction pursuant to 28-201.1 and 1rncy 102-01.please file certificate of correction.rem: comply with commisso
Oct 4, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio# issued on 07-29-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. nocert of correction on record. remedy: comply w/comm's order &/or file
Sep 6, 2018
Resolve - Class - 2
Failure to maintain an unobstructed exit passageway.noted:front emergency egress window at basement apartment obstructed by window a/c unit.remove all obstructions.
Aug 17, 2018 · Penalty $781
Resolve - Class - 1
Failure to maintain an unobstructed exit passageway.noted:bsmt apt.front egress window is obstructed by window a/c unit as well as wooden bench that has been chained to gate @window.rem:remove all obstructions.
Jul 29, 2018 · Penalty $1,250
Resolve - Class - 2
B265.as per class 2(b265)28-303.7 failure to file a complete boiler inspection report as per dob records.submit a current b0-9 report.
Dec 22, 2017
Resolve - Class - 2
B265.as per class 2(b265)28-303.7 failure to file a complete boiler inspection report as per dob records.submit a current b0-9 report.
Dec 22, 2017
Resolve
Complaints
- Unsanitary condition
Pests
Jun 4, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Jun 4, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Jun 4, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Mar 28, 2026 · Apt GA
Close - Heat/hot water
Apartment only
Mar 27, 2026 · Apt GA
Close - Plumbing
Toilet
Mar 27, 2026 · Apt GA
Close - Heat/hot water
Apartment only
Mar 18, 2026 · Apt GA
Close - Heat/hot water
Apartment only
Mar 14, 2026 · Apt GABSM
Close - Plumbing
Toilet
Mar 14, 2026 · Apt GABSM
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt 3A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 24, 2026 · Apt GA
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 3A
Close - Paint/plaster
Wall
Jan 5, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 1, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Dec 13, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt GA
Close - Plumbing
Basin/sink
Dec 5, 2025 · Apt GA
Close - Paint/plaster
Wall
Jul 16, 2025 · Apt 1B
Close - Paint/plaster
Ceiling
Jul 16, 2025 · Apt 1B
Close - Plumbing
Basin/sink
Jul 16, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Jul 16, 2025 · Apt 1B
Close - General
Cabinet
Jul 16, 2025 · Apt 1B
Close - Electric
Lighting
Jul 16, 2025 · Apt 1B
Close - Door/window
Door
Jul 16, 2025 · Apt 1B
Close - Paint/plaster
Ceiling
Jul 16, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Jul 16, 2025 · Apt 1B
Close - Plumbing
Basin/sink
Jul 16, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Jul 16, 2025 · Apt 1B
Close - Paint/plaster
Wall
Jul 16, 2025 · Apt 1B
Close - Electric
Lighting
Jul 16, 2025 · Apt 1B
Close - Door/window
Door frame
Jul 16, 2025 · Apt 1B
Close - Appliance
Refrigerator
Jul 16, 2025 · Apt 1B
Close - Water leak
Heavy flow
Jan 8, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 3A
Close - Paint/plaster
Wall
Jan 8, 2025 · Apt 3A
Close - Electric
Wiring
Jan 8, 2025 · Apt 3A
Close - Unsanitary condition
Pests
Jan 8, 2025 · Apt 3A
Close - Door/window
Window frame
Jan 8, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt 3A
Close - Door/window
Door
Oct 18, 2024 · Apt 1A
Close - Unsanitary condition
Mold
Oct 18, 2024 · Apt 1A
Close - Electric
Outlet/switch
Oct 18, 2024 · Apt 1A
Close - Plumbing
Toilet
Oct 18, 2024 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1970
- Floors
- 3
- Residential units
- 8
- Building area
- 4,176 ft²
- Lot area
- 3,336 ft²
- Zoning
- R7X
- Community board
- 412
- Council district
- 27
- Block / lot
- 9694 / 65
- Assessed value
- $396,000
- Landmark / historic district
- No
HPD registration #421018, last renewed Dec 16, 2025.
Questions about 148-05 88 Avenue
Who owns 148-05 88 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Raj Equities INC.
Does 148-05 88 Avenue have violations?
Yes. NYC HPD has recorded 138 housing violations at this property.
Is 148-05 88 Avenue rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 148-05 88 Avenue built?
City records list 1970 as the year it was built.
How many apartments are in 148-05 88 Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.