139 Payson Avenue
Manhattan, NY 10034BBL 1-02248-0024Map
Owner of record: 139 Payson Residences, LLC
139 Payson Avenue is an elevator apartment building built in 1927 in Manhattan, 10034. It has 61 residential units across 6 floors. The owner of record is 139 Payson Residences, LLC. HPD has recorded 470 housing violations here, most recently on October 9, 2026. 39 of the 50 most recent violations are still open. City tax records listed 49 rent-stabilized apartments here in 2024.
- HPD violations
- 470
- DOB violations
- 23
- ECB violations
- 24
- HPD complaints
- 1,949
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 470
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet of mold at west wall at vestibule
Oct 9, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at vestibule
Oct 9, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at vestibule
Oct 9, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from south at west , section at east
Oct 7, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from south at west , section at east
Oct 7, 2026 · Apt 6A
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set on bulkhead door to roof at public hall, 6th story
Sep 28, 2026
Open — Violation will be reinspected - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 26, 2026
Open — Nov certified on time - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Sep 24, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 2nd apartment from north at east
Sep 24, 2026 · Apt 5D
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls at vestibule , 1st story
Sep 19, 2026
Open — Nov certified on time
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective fire retardant materials at all walls at vestibule , 1st story
Sep 19, 2026
Open — Nov certified on time - CImmediately hazardous
Provide ready access to buildings heating system lock door at basement at boiler room
Sep 19, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east
Sep 19, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at west wall , 1st story
Sep 19, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Sep 19, 2026 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east
Sep 19, 2026 · Apt 4A
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east
Sep 19, 2026 · Apt 4A
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Sep 12, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3i, 3rd story, 2nd apartment from west at north
Sep 12, 2026 · Apt 3I
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Sep 12, 2026
Open — Nov sent out - BHazardous
Provide acceptable latch set at door that allows re-entry to public hall at 1st public hall bulkhead from north, 6th story, section at north
Aug 18, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 18, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Aug 18, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective latch set at building entrance door , 1st story
Aug 18, 2026
Open — Nov certified on time - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section at north
Aug 18, 2026 · Apt 6A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Remove device preventing door from being self-closing consisting of detex panic device installed at door preventing it from self-closing at 1st public hall bulkhead from north, 6th story, section at north
Aug 18, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 18, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st story
Aug 18, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 6th story, 1st apartment from east at south , section at north
Aug 18, 2026 · Apt 6A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 1c, 1st story, 1st apartment from west at north , section at north
Aug 18, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north and east walls in the bathroom located at apt 1c, 1st story, 1st apartment from west at north , section at north
Aug 18, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 6a, 6th story, 1st apartment from east at south , section at north
Aug 18, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 4th room from north located at apt 6a, 6th story, 1st apartment from east at south , section at north
Aug 18, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 6a, 6th story, 1st apartment from east at south , section at north
Aug 18, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the private hallway located at apt 6a, 6th story, 1st apartment from east at south , section at north
Aug 18, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section at north
Aug 18, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles. in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section at north
Aug 18, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4h, 4th story, 1st apartment from west at north
Jul 3, 2026 · Apt 4H
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4h, 4th story, 1st apartment from west at north
Jul 3, 2026 · Apt 4H
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4h, 4th story, 1st apartment from west at north
Jul 3, 2026 · Apt 4H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 6a, 6th story, 1st apartment from south at west , section ''east''
Jul 1, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 6a, 6th story, 1st apartment from south at west , section ''east''
Jul 1, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom located at apt 6a, 6th story, 1st apartment from south at west , section ''east''
Jul 1, 2026 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 6th story, 1st apartment from south at west , section ''east''
Jul 1, 2026 · Apt 6A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6a, 6th story, 1st apartment from south at west , section ''east''
Jul 1, 2026 · Apt 6A
Closed — Violation dismissed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Jun 17, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 31, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balances at upper and lower window sashes at east wall in the bathroom located at apt 1c, 1st story, 1st apartment from west at north
May 15, 2026 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balances at upper and lower window sashes at 2nd window from west at north wall in the 4th room from east located at apt 1c, 1st story, 1st apartment from west at north
May 15, 2026 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balances at upper and lower window sashes at 1st window from west at north wall in the 4th room from east located at apt 1c, 1st story, 1st apartment from west at north
May 15, 2026 · Apt 1C
Closed — Violation closed
DOB building violations · 23
- Construction other optional
Failure to maintain building in code compliant manner. retaining wall approx 12'-0" in height and 150lf in length on property line between 88 seaman ave and 139 payson ave has significant top of wall defects with concrete curb and topping slab belonging to 139 payson ave heavily deteriorated creating unsafe condition.
Jul 11, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 10, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed
Show 13 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 13, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 2, 2003
Dob violation - resolved - Elevator elevatorrequired
1p12953
Nov 7, 2001
Dob violation - resolved - Elevator elevatorrequired
1p12953
Apr 26, 2000
Dob violation - active - Elevator elevatorrequired
1p12953
Apr 26, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
(51)restore above elevator to service so that a complete inspecti on can be made and file building notice for all major work and conduct necessary test in the presence of an inspecter from this dept
Nov 23, 1988
Dob violation - resolved
ECB violations · 24
- Class - 1
Class1 rts agg1: failure to maintain building in code compliant manner, service elevator equipment as per code bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous
Sep 16, 2026 · Penalty $3,125
Active - Class - 1
Class1 item: rts failure to maintain building in code compliant manner, service elevator equipment as per code bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous
Sep 3, 2026 · Penalty $1,250
Active - Class - 1
Class1 rts: failure to maintain building in code compliant manner, service elevator equipment as per code bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condi
Jun 23, 2026 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condition per 1rcny 11
Apr 3, 2026 · Penalty $1,250
Resolve - Class - 2
Class 2: in car phone inoperative, repair. missing braille tags, provide. provide permanent in car city id signage. hoist machine oil leaking, clean and repair. category 5 test tag missing, provide. clean entir
Jun 3, 2025 · Penalty $3,125
Active - Class - 1
Cease use violation issued, door lock monitoring not working remedy; repair and contact nycdob file permit and application and file for a inspection test on repairs installation of device. class 2,violations, 1
Jan 29, 2021 · Penalty $1,250
Resolve - Class - 2
Class 2 work with out permit dlm / door lock monitoring was installed without permit being obtained and application being filed remedy; file application and obtain permit for work and schedule test appointment
Jan 27, 2021 · Penalty $1,250
Resolve - Class - 1
42m07,37p16,39m07,40p16,71x10,100m07,39m07:42-m-07 no door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passen
Jan 21, 2020 · Penalty $1,250
Resolve - Class - 2
68m07,35m07,100b10,56y10,100l10,42b11,42b09,08v01,52m15,64m15,44m03. 68m-provide pgram; 35m-provide electrical print; 100b-repair and relay56y-repair oil leak; 100l-completely open hoistway by motor room; 42g
May 14, 2019
Resolve - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or buildings dept records. noted: as per hpd #26693 in the cellar level of the building should be occupied as 1 (one) apartment. at time of in
Feb 28, 2019 · Penalty $1,250
Active
Show 14 more ↓
- Class - 3
An individual was exiting apartment 1h and was able to observe the entrance ceiling with furring channel installed as well as metal studs. , obtain permits
Sep 12, 2018 · Penalty $500
Active - Class - 2
Failure of permit holder to provide inspection access to and/or expose ongoing construction or work on an active and permitted #123446208, worksite. denied access to apartment 1h located on the 1st floor., prov
Sep 12, 2018
Resolve - Class - 2
56y13,68b07
Jul 12, 2016 · Penalty $250
Resolve - Class - 1
Class1-05j01; 08v10,67l10,39m07,07m07,20i11,56y13,40q03,40b02,41c07. 05-excessive gap on car door; 08-car not leveled on floors; 67-phones not working; 39-missign steady plate on top fo car; 07-missing zone re
Nov 16, 2015 · Penalty $5,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: in apt 6h hair line cracking of plaster wall occurs in all bedrooms,hallway,livingroom. cracks appear at corner of ceiling & also run verticle in some
May 14, 2015 · Penalty $500
Active - Class - 2
B254,15,16,32a,50a,50b,50c,50d,50e,50f,50g,50h. 50a-transfer pump cannot run continuous must be interlocked with burner this is 4oil; 50b-must epoxy oiltank room; 50c-tank on ground-must epoxy tank room;50d-gla
Mar 6, 2013
Resolve - Non-hazardous
16m07.36t07.40t07.59q03.85bb05.86bb05. 16m07 provide fl numbers for hoistway door 36t07 provide sign for overhead sheave room door
Mar 28, 2008
Resolve - Non-hazardous
85bb05.86bb05.31h10.01b10.41g09.39o02. 85bb05 5yr test 86bb05 2yr yest31h10 repair worn car shoes 01b10 repair stop switsh to work properly 41609 remove slow blow fuse from controller & replace with 1 time fuse
Mar 4, 2008 · Penalty $2,500
Resolve - Non-hazardous
01l11 39p16 36p16 31h11 o1l11-stop switch is too senitive to touch-stops elevator when touching or accidenty hitting it replace switch, 39 & 36 p16 no keys on premsises to access overhead locked roof & machin
Oct 25, 2004 · Penalty $2,500
Resolve - Non-hazardous
05j06 05-properly adjust car door as to cover space between car door & wall of cab
Jul 21, 2004 · Penalty $2,500
Resolve - Non-hazardous
8v1/ 5j11/ 15l11/ 15r11/ 17a12/ 18q3/ 15b11/ 22o2/ 23u16/ 25q3/ 37g12/ 50o2/ 50y14/ 73u16/ 05j11 = too much gap between door & car post 15l11 = slams 2nd fl. 15r11 = hand holes all fls. 17a12 = mus
Dec 7, 2001 · Penalty $350
Resolve - Non-hazardous
73u, 54i, 50y, 35r, 36w, 73o, 15r, 5j, 25q, 33p, 15m. door in wall tobathroom. 15-handle. 5-gap back of door. 15-floor numbers as per code.
May 26, 1995 · Penalty $1,000
Resolve - Non-hazardous
08l,09h,09m,15m,28l,30l,37g,34i,46l,53x,73o. 15m- floor numbers 30l- old equipment 9 (leveling units) 46l- comded
Apr 29, 1994
Resolve - Non-hazardous
11q,14m,15r,15m,73o,46k,53b,53#,54i,39h,50y,17q,31q,33h,35m,35r,05#, 15 hand halder 15 proper push plate 53 switch at door 33 babit 17 car 35 wall 35 water pipes going to bathroom 5 lap back of door
May 27, 1992 · Penalty $150
Resolve
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Open - Outside building
Pavement
Oct 20, 2026 · Apt 1C
Open - Electric
No lighting
Oct 20, 2026 · Apt 1C
Open - General
Mailbox
Oct 20, 2026 · Apt 1C
Open
Show 40 more ↓
- Unsanitary condition
Mold
Oct 20, 2026 · Apt 1C
Open - Plumbing
Radiator
Oct 20, 2026 · Apt 1C
Open - Paint/plaster
Wall
Oct 20, 2026 · Apt 1C
Open - Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Door/window
Door
Oct 15, 2026 · Apt 1I
Close - Elevator
Maintenance
Oct 13, 2026 · Apt WHOLEB
Open - General
Signage missing
Oct 13, 2026 · Apt WHOLEB
Open - Heat/hot water
Entire building
Oct 10, 2026 · Apt BLDG
Close - General
Mailbox
Oct 9, 2026 · Apt 1H
Open - Heat/hot water
Entire building
Oct 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 28, 2026 · Apt BLDG
Close - General
Janitor/super
Sep 28, 2026 · Apt 6I
Close - Heat/hot water
Entire building
Sep 26, 2026 · Apt 6J
Close - Door/window
Door
Sep 23, 2026 · Apt APT1I
Close - Door/window
Door
Sep 23, 2026 · Apt APT1I
Close - Safety
Fire escape
Sep 23, 2026 · Apt APT1I
Close - Heat/hot water
Entire building
Sep 23, 2026 · Apt 6J
Close - Unsanitary condition
Garbage/recycling storage
Sep 22, 2026 · Apt 6J
Close - Door/window
Door
Sep 22, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Sep 22, 2026 · Apt 4F
Close - Elevator
Maintenance
Sep 22, 2026 · Apt 4F
Close - General
Janitor/super
Sep 18, 2026 · Apt 6I
Close - Unsanitary condition
Mold
Sep 17, 2026 · Apt 6A
Close - Heat/hot water
Entire building
Sep 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 11, 2026 · Apt BLDG
Close - Door/window
Door
Aug 12, 2026 · Apt BLDG
Close - General
Signage missing
Aug 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 5, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Aug 5, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Aug 4, 2026 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1927
- Floors
- 6
- Residential units
- 61
- Building area
- 61,584 ft²
- Lot area
- 14,375 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2248 / 24
- Assessed value
- $2,073,600
- Landmark / historic district
- No
HPD registration #107947, last renewed Jul 21, 2025.
Questions about 139 Payson Avenue
Who owns 139 Payson Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 139 Payson Residences, LLC.
Does 139 Payson Avenue have violations?
Yes. NYC HPD has recorded 470 housing violations at this property.
Is 139 Payson Avenue rent stabilized?
NYC Department of Finance tax bills listed 49 rent-stabilized units here in 2024 (about 80% of its 61 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 139 Payson Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 139 Payson Avenue?
It has 61 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.