60 Seaman Avenue
Manhattan, NY 10034BBL 1-02248-0040Map
Owner of record: Inwood Park Associates
60 Seaman Avenue is an elevator apartment building built in 1925 in Manhattan, 10034. It has 61 residential units across 6 floors. The owner of record is Inwood Park Associates. HPD has recorded 369 housing violations here, most recently on August 18, 2026. 28 of the 50 most recent violations are still open. City tax records listed 55 rent-stabilized apartments here in 2024.
- HPD violations
- 369
- DOB violations
- 22
- ECB violations
- 33
- HPD complaints
- 818
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 369
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at 1st fire passage way from east
Aug 18, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at 1st fire passage way from east
Aug 18, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall at basement
Aug 18, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at basement
Aug 18, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Jul 17, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective at ceiling at public hall, 1st story
Jul 17, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Jul 17, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the accumulation of rubbish at north yard garbage area yard
Jul 17, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout at basement
Jun 3, 2026
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from north at east wall in the bathroom located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, ceiling in the bathroom located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st window frame from south at west wall, 1st radiator from south at west wall in the 1st room from north located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st door frame from west at north wall in the foyer located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of air conditioner unit installed at fire escape window in the 1st room from north located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the kitchen , the private hallway located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from west at north wall in the foyer located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall and ceiling in the bathroom located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the bathroom located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 2nd window frame from south at west wall in the 1st room from north located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall and ceiling in the bathroom located at apt 1j, 1st story, 2nd apartment from east at south original violation 18965602 issued 29-may-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 29, 2026 · Apt 1J
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1j, 1st story, 2nd apartment from east at south
May 29, 2026 · Apt 1J
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at south window casin and at 1st - 2nd windows from north in the 6th room from north located at apt 3g, 3rd story, 3rd apartment from north at east , section ''south''
Feb 8, 2026 · Apt 3G
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Jan 11, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash 2nd window at west in the kitchen located at apt 5a, 5th story, 1st apartment from west at north
Jan 11, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash 1st window from south at west in the kitchen located at apt 5a, 5th story, 1st apartment from west at north
Jan 11, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 5a, 5th story, 1st apartment from west at north
Jan 11, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 5a, 5th story, 1st apartment from west at north
Jan 11, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 5a, 5th story, 1st apartment from west at north
Jan 11, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash 1st window at south in the 3rd room from east located at apt 5d, 5th story, 1st apartment from east at south
Jan 5, 2026 · Apt 5D
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1k, 1st story, 1st apartment from west at north
Dec 24, 2025 · Apt 1K
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding 130 degrees at all hot water fixtures in the entire apartment located at apt 1k, 1st story, 1st apartment from south at west
Dec 23, 2025 · Apt 1K
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system from vestibule to phone in the entire apartment located at apt 1k, 1st story, 1st apartment from south at west
Dec 23, 2025 · Apt 1K
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the bathroom , the 2nd room from east at south, the private hallway located at apt 3b, 3rd story, 1st apartment from west at north
Dec 23, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6b, 6th story, 1st apartment from north at east
Nov 20, 2025 · Apt 6B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 6b, 6th story, 1st apartment from north at east
Nov 20, 2025 · Apt 6B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 6th story
Nov 20, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Nov 20, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door leading to roof at public hall, 6th story
Nov 20, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 22, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 22, 2025
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all components at all story balcony north fire escape at building front
Jul 29, 2025
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit protruding more than 4 inches from window sill at 6th story balcony south fire escape at building front
Jul 29, 2025
Open — Nov sent out
DOB building violations · 22
- Construction other optional
Requesting a structural stability report due to vertical and horizontal step cracks at exposure 1 extending from the 5th story to the parapet wall. multiple areas of the brick masonry assembly are bulging from the 5th story to the parapet wall.
Jul 24, 2026
Dob violation - active - Immediate emergency anythingoptional
Remedy: provide a total of 195 linear feet at exposure 1 south elevation (seaman avenue) including 165 l.f at seaman avenue and 30 l f at entryway courtyard on seaman avenue
Jun 14, 2024
Dob violation - dismissed - Construction other optional
Emergency work order due to cracked/loose/bulging brick multi.loc.at expo#1 south with bulging pushing off shelf of top fl.window lintel we west facing wall of front courtyard step back.the cracks and bulging p present.a severe danger to public safety.remedy:immed.take&provide adequate safety measures such as a shed the full (length of exp#1 so.)
Jun 10, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 28, 2021
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2014
Dob violation - resolved
Show 12 more ↓
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 8, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 13, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 21, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2004
Dob violation - resolved - Elevator elevatorrequired
(74)remove jumpers from reverse phase relay and repair same
Feb 28, 1990
Dob violation - resolved - Elevator elevatorrequired
51-restore above elev to service so that a complete inspection can be made by this dept. 16-provide plexiglass and tamper proof secrew
Sep 13, 1988
Dob violation - resolved
ECB violations · 33
- Class - 2
At time of inspection, observed sidewalk shed at exposure 1 of a 6-story building. shed previously received a violation for no permit on 08/07/2026. torn netting, missing horizontal bracing, and no visible info
Oct 8, 2026 · Penalty $2,400
Active - Class - 2
Observed 6 story building with sidewalk shed erected at exp 1. upon review records show gc or sidewalk shed permit has not been issued.
Aug 7, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain building facade. at the time of inspection, observed vertical and horizontal step cracks at exposure 1 extending from the 5th story to the parapet wall. multiple areas of the brick masonry a
Jul 24, 2026 · Penalty $2,530
Active - Class - 2
Proivde missing in case of fire sign (bc 3002.3). clean tail rope for proper inspection (2.17.5.). inaudible in car stop switch (2.26.2.5.). secure escape hatch . unlocked machine room door (2.7.3.4.1.(a)). unr
Jul 21, 2026 · Penalty $655
Active - Class - 2
At time of inspection of a 6-story building, i observed sidewalk shed erected exposure#1. upon reviewing the department of building records reveals permit under approved and has not issued as yet. permit number
Jun 3, 2026
Resolve - Class - 2
I observed 3 commercial gas dryers in basement with flex hoses and no permits on file, obtain all permits
Feb 6, 2026 · Penalty $6,250
Active - Class - 2
A-8 no falling debris from sws observed at time of inspection. at time of inspection observed sws installed at exposure #1 where no active permit found on dob record. permit 01071629 approved but not permitted
Sep 12, 2025 · Penalty $6,250
Active - Class - 2
Class 2: in car phone inoperative, repair. emergency escape hatch panel misaligned, secure. in car lighting missing guards, provide. fire extinguisher missing test tag, provide updated tag. pit light inoperativ
Jun 3, 2025 · Penalty $3,125
Active - Class - 2
Class 2: repair communication in car. repair escape hatch in car. install cab light guards. repair handrail in car. insufficent lock on motor room also provide self lock. update maintenance log. update brake ta
Jan 27, 2025 · Penalty $1,562
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. note: observed at exposure 1(south ele) inadequate repairs, several cracks in masonry spalling window sills, improperly supported ac units, and 3
Aug 1, 2024 · Penalty $6,250
Active
Show 23 more ↓
- Class - 1
Failure to maintain building exterior facade and appurtenances.-note: at time of inspection, i observed at exp. #1 south (1)inadequate repairs/cracked brick parapet(2) cracked brick spandrel at corners of step
Jun 10, 2024 · Penalty $12,500
Active - Class - 2
At time of inspection of 6 story residential building with sidewalk shed in place with permit m00114194 expired 7-25-2023
Jul 31, 2023
Resolve - Class - 2
At time of inspection of 6 story residential building observed sidewalk shed in place not to code specifications as per 3307.6.4.10. sidewalk repair in progress compromising the founding of sidewalk shed vertic
Jul 31, 2023
Resolve - Class - 2
6 story building, closed site, observed sws and scaffold at exp1. upon further inspection, it was discovered, electric extension cord was tapped into the sws light fixture, not protected by conduit pipe(bc3301.
Jun 29, 2023 · Penalty $2,400
Resolve - Class - 2
Debris netting for supported scaffold not secure.maintain netting
Nov 7, 2022
Resolve - Class - 1
Bc3314.8.2 debris netting note:atoi@6sty occupied bldg i observed sidewalkshed erected w/pipe scf on top w/debris netting inadequately maintained w/large gaps allowing const debris or material to fall down belo
May 19, 2022 · Penalty $625
Resolve - Class - 2
Phone in car not working properly. repair. emergency stop button in car top inspection box not working. replace/ repair. cat1 tag expired. provide. brake tag expired. provide.
Mar 1, 2021 · Penalty $625
Resolve - Class - 1
Cease use item, car governor sheave not working remedy; recalibrate governor and provide weight for re-inspection, class 1 no dlm installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 n
Jan 29, 2021 · Penalty $1,250
Resolve - Class - 2
12l10,09m07,05m07,40m07. 12-cab light; 09-floor tiles; 05-zone restrictor; 40-provide keys for machine room,so a complete inspection can be performed by the dept as per asme alt 1 section 8.1.1 please call 212-
Oct 15, 2014 · Penalty $2,500
Resolve - Class - 1
Licensed rigger railed to deignate a rigging foreman.noted: @time of insp two workers on suspended scaffold on exp #1,unsupervised due to rigging foreman had to leave for a doctor's appt. rem:comply w/code.
Jul 15, 2014 · Penalty $1,600
Resolve - Class - 2
Failure to install ground-fault circuit interrupter (gfci) protection as required. sidewalk shed: no gfci protection provided. remedy: install gfci protection.
Jun 16, 2014
Resolve - Class - 1
Failure to ground electrical systems. outdoor sidewalk shed: non current wiring electrical conductive material is not grounded. remedy: provide grounding.
Jun 16, 2014
Resolve - Class - 2
Unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use. outdoor sidewalk shed: open defective wiring are in use, existing light outdoor is not secured, box
Jun 16, 2014
Resolve - Class - 2
14m7,81m7,100m7,40#7. 100- no braille tags on all flrs, car mirror missing, coutnerweight run by missing, must comply 8.1.1 need entry to motor room.
Jun 12, 2013 · Penalty $2,500
Resolve - Class - 2
Work w/o permit -shed at exp #1 no permit. remedy: comply w/code.
May 21, 2013 · Penalty $400
Resolve - Class - 2
B251:100b10,81m7,60m7,99bb5,20i11,39y2,52h11.100:phone in car not working,light in motor room missing,top of car needs to be cleaned& hoist ropes need to be replaced.
Jan 16, 2013 · Penalty $2,500
Resolve - Class - 2
16b1,20i11,100z10,60x11.(100)phone in car.(16)lobby door.
Jun 29, 2012 · Penalty $1,250
Resolve - Class - 2
14m10,41d06,40o02,60i11,20i11,56y10,100bb10: 60;found lighting broken on motor room floor. 20;car rear w/seon panel glass. 100;placed for emergency phone in elev cab no answer.
Dec 15, 2011 · Penalty $250
Resolve - Class - 2
Sec. 27-127 failure to maintain. defect is: bathroom floor in apt 1g is sagging severely. cracks on walls ceilings,around door frames & around bathtub & stand up shower. remedy: immediately repair defects,obtai
Apr 7, 2011 · Penalty $250
Active - Non-hazardous
08j01, 15h01, 57o02, 57q07, #08j01-first fl. & where ever needed #15h01-adjust where needed #57q07-put cover on alarm
Jul 31, 2001 · Penalty $2,500
Resolve - Non-hazardous
08j 14l 15j 34p 35p 57o 08 adust 14 repair 15 adjust 3rd floor where necessary 34 provide 35 provide 57 clean
May 19, 1999
Resolve - Hazardous
Use of a swinging scaffold by connecting 2 suspended scaffold togetherfailure to provide sidewalk shed while removing bricks from face of bldg. failure to provide center iron on a scaffold more than 10'long.
Aug 21, 1998 · Penalty $12,500
Resolve - Non-hazardous
35p,11q,73o,55x
May 14, 1992
Resolve
Complaints
- Door/window
Door
Oct 5, 2026 · Apt 1K
Close - Door/window
Door
Aug 12, 2026 · Apt BUILDI
Close - Unsanitary condition
Garbage/recycling storage
Jul 23, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 23, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Jul 15, 2026 · Apt BASEME
Close - Unsanitary condition
Garbage/recycling storage
Jul 13, 2026 · Apt BLDG
Close - Water leak
Slow leak
May 23, 2026 · Apt 1J
Close - Unsanitary condition
Mold
May 23, 2026 · Apt 1J
Close - Water leak
Heavy flow
May 23, 2026 · Apt 1J
Close - Heat/hot water
Entire building
Apr 12, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close - Plumbing
Steam pipe/riser
Feb 11, 2026 · Apt 1A
Close - Water leak
Heavy flow
Feb 11, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Feb 10, 2026 · Apt 3G
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Jan 29, 2026 · Apt 3G
Close - Unsanitary condition
Mold
Jan 29, 2026 · Apt 3G
Close - Door/window
Window frame
Jan 29, 2026 · Apt 3G
Close - Paint/plaster
Wall
Jan 29, 2026 · Apt 3G
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1925
- Floors
- 6
- Residential units
- 61
- Building area
- 65,489 ft²
- Lot area
- 15,200 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2248 / 40
- Assessed value
- $2,402,550
- Landmark / historic district
- No
HPD registration #115389, last renewed Sep 24, 2025.
Questions about 60 Seaman Avenue
Who owns 60 Seaman Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Inwood Park Associates.
Does 60 Seaman Avenue have violations?
Yes. NYC HPD has recorded 369 housing violations at this property.
Is 60 Seaman Avenue rent stabilized?
NYC Department of Finance tax bills listed 55 rent-stabilized units here in 2024 (about 90% of its 61 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 60 Seaman Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 60 Seaman Avenue?
It has 61 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.