22 Broadway Terrace
Manhattan, NY 10040BBL 1-02170-0558Map
Owner of record: 14-26 Broadway Terrace Associates LLC
22 Broadway Terrace is a walk-up apartment building built in 1927 in Manhattan, 10040. It has 16 residential units across 4 floors. The owner of record is 14-26 Broadway Terrace Associates LLC. HPD has recorded 32 housing violations here, most recently on April 27, 2025. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 32
- DOB violations
- 8
- ECB violations
- 0
- HPD complaints
- 120
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- BHazardous
Provide adequate supply of cold water for the fixtures .. in the bathroom located at apt 1d, 2nd story, 2nd apartment from north at east
Apr 27, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures ... in the bathroom located at apt 1d, 2nd story, 2nd apartment from north at east
Apr 27, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 1d, 2nd story, 2nd apartment from north at east
Apr 27, 2025 · Apt 1D
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south and west walls in the bathroom located at apt 1d, 2nd story, 2nd apartment from north at east
Apr 27, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east and south wall in the kitchen located at apt 1d, 2nd story, 2nd apartment from north at east
Apr 27, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 1st room from east at south located at apt 1d, 2nd story, 2nd apartment from north at east
Apr 27, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling south, east and west walls at closet at south wall in the private hallway located at apt 1d, 2nd story, 2nd apartment from north at east
Apr 27, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the kitchen located at apt 1d, 2nd story, 2nd apartment from north at east original violation 17854742 issued 27-apr-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 27, 2025 · Apt 1D
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the kitchen located at apt 1d, 2nd story, 2nd apartment from north at east
Apr 27, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door , 1st story
Nov 12, 2022
Closed — Violation dismissed
Show 22 more ↓
- ANon-hazardous
Refit building entrance door , 1st story
Nov 12, 2022
Closed — Violation dismissed - BHazardous
Remove the illegal fastening consisting of lockable sliding bolt installed at interior of door in the entrance located at apt 2d, 3rd story, 2nd apartment from north at east
Aug 11, 2017 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Properly secure the loose wash basin in the bathroom located at apt 1d, 1st story, 2nd apartment from north at east
Apr 16, 2014 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1d, 1st story, 2nd apartment from north at east
Apr 16, 2014 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood cabinet base at sink in the kitchen located at apt 1d, 1st story, 2nd apartment from north at east
Apr 16, 2014 · Apt 1D
Closed — Violation closed - BHazardous
Replace with new the broken or defective window glass bottom sash in the kitchen located at apt 1d, 1st story, 2nd apartment from north at east
Apr 16, 2014 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the broken or defective elelctrical ceiling light fixture in the kitchen located at apt 1d, 1st story, 2nd apartment from north at east
Apr 16, 2014 · Apt 1D
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1d, 1st story, 2nd apartment from north at east
Apr 16, 2014 · Apt 1D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 1d, 1st story, 2nd apartment from north at east
Apr 16, 2014 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1d, 2nd story, 2nd apartment from north at east
Feb 2, 2013 · Apt 1D
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1d, 2nd story, 2nd apartment from north at east
Feb 2, 2013 · Apt 1D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1d, 2nd story, 2nd apartment from north at east
Feb 2, 2013 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1d, 1st story, 2nd apartment from north at east
Nov 3, 2012 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 3, 2012
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1d, 1st story, 2nd apartment from north at east
Nov 3, 2012 · Apt 1D
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1d, 1st story, 2nd apartment from north at east
Nov 3, 2012 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartment located at apt 3d, 4th story, 2nd apartment from north at east
Jul 12, 2010 · Apt 3D
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... window frame at east wall in the 2nd room from east located at apt 3d, 4th story, 2nd apartment from north at east
Jul 12, 2010 · Apt 3D
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at window in the bathroom located at apt 3d, 4th story, 2nd apartment from north at east
Jul 12, 2010 · Apt 3D
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at closet west, south and east wall in the foyer located at apt 3d, 3rd story, 2nd apartment from north at east
Jun 2, 2010 · Apt 3D
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling and west wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from north at east
Jun 2, 2010 · Apt 3D
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at west window frame in the 2nd room from east at north located at apt 3d, 3rd story, 2nd apartment from north at east
Jun 2, 2010 · Apt 3D
Closed — Violation closed
DOB building violations · 8
- Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- General
Cabinet
Mar 28, 2025 · Apt 1D
Close - Paint/plaster
Wall
Mar 28, 2025 · Apt 1D
Close - Plumbing
Basin/sink
Mar 28, 2025 · Apt 1D
Close - Unsanitary condition
Mold
Mar 28, 2025 · Apt 1D
Close - Paint/plaster
Wall
Feb 26, 2025 · Apt 2C
Close - Appliance
Electric/gas range
Feb 26, 2025 · Apt 2C
Close - Paint/plaster
Wall
Feb 26, 2025 · Apt 2C
Close - Appliance
Refrigerator
Feb 26, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt 1D
Close - Heat/hot water
Entire building
Oct 16, 2023 · Apt 1D
Close
Show 40 more ↓
- Appliance
Electric/gas range
Jul 21, 2023 · Apt 1D
Close - Heat/hot water
Entire building
Nov 9, 2022 · Apt 1D
Close - Heat/hot water
Entire building
Oct 4, 2022 · Apt 1D
Close - Heat/hot water
Apartment only
May 9, 2022 · Apt 1D
Close - Heat/hot water
Apartment only
Mar 28, 2022 · Apt 1D
Close - Heat/hot water
Apartment only
Feb 5, 2022 · Apt 1D
Close - Heat/hot water
Apartment only
Feb 1, 2022 · Apt 1D
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt 1D
Close - Heat/hot water
Entire building
Nov 15, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 17, 2020 · Apt 1D
Close - Heat/hot water
Entire building
Oct 16, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 24, 2019 · Apt 3B
Close - Heat/hot water
Apartment only
Nov 4, 2019 · Apt 1C
Close - Heat/hot water
Entire building
Nov 3, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 3, 2019 · Apt 3B
Close - Heat/hot water
Entire building
Oct 18, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2019 · Apt BLDG
Close - Plumbing
Water supply
Sep 27, 2019 · Apt 3B
Close - Plumbing
Basin/sink
May 25, 2019 · Apt 2D
Close - Plumbing
Basin/sink
May 25, 2019 · Apt 2D
Close - Heat/hot water
Entire building
Mar 27, 2019 · Apt D
Close - Heat/hot water
Entire building
Nov 10, 2018 · Apt 1D
Close - Heat/hot water
Apartment only
Oct 18, 2018 · Apt 1D
Close - Heat/hot water
Entire building
Apr 1, 2018 · Apt A
Close - Heat/hot water
Apartment only
Nov 13, 2017 · Apt E
Close - Plumbing
Bathtub/shower
Aug 4, 2017 · Apt 2D
Close - Door/window
Window pane
Aug 4, 2017 · Apt 2D
Close - Unsanitary condition
Mold
Aug 4, 2017 · Apt 2D
Close - Plumbing
Basin/sink
Aug 4, 2017 · Apt 2D
Close - Plumbing
Water supply
Mar 24, 2017 · Apt APT2A
Close - Plumbing
Water supply
Mar 24, 2017 · Apt APT2A
Close - Plumbing
Bathtub/shower
Mar 21, 2014 · Apt 1D
Close - Door/window
Window pane
Mar 21, 2014 · Apt 1D
Close - Paint/plaster
Ceiling
Mar 21, 2014 · Apt 1D
Close - General
Cabinet
Mar 21, 2014 · Apt 1D
Close - Electric
Outlet/switch
Mar 21, 2014 · Apt 1D
Close - Electric
Outlet/switch
Mar 21, 2014 · Apt 1D
Close - Unsanitary condition
Mold
Mar 21, 2014 · Apt 1D
Close - Heating
Heat related
Dec 31, 2013 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 16
- Building area
- 9,728 ft²
- Lot area
- 3,500 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2170 / 558
- Assessed value
- $546,750
- Landmark / historic district
- No
HPD registration #105624, last renewed Aug 27, 2025.
Questions about 22 Broadway Terrace
Who owns 22 Broadway Terrace?
The owner of record in NYC Department of City Planning PLUTO data is 14-26 Broadway Terrace Associates LLC.
Does 22 Broadway Terrace have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 22 Broadway Terrace rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 22 Broadway Terrace built?
City records list 1927 as the year it was built.
How many apartments are in 22 Broadway Terrace?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.