16 Broadway Terrace
Manhattan, NY 10040BBL 1-02170-0556Map
Owner of record: 14-26 Broadway Terrace Associates LLC
16 Broadway Terrace is a walk-up apartment building built in 1927 in Manhattan, 10040. It has 16 residential units across 4 floors. The owner of record is 14-26 Broadway Terrace Associates LLC. HPD has recorded 226 housing violations here, most recently on August 17, 2026. 2 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 226
- DOB violations
- 9
- ECB violations
- 5
- HPD complaints
- 1,210
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 226
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3a, 4th story, 1st apartment from west at north
Aug 17, 2026 · Apt 3A
Open — Civ14 mailed - BHazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 3a, 4th story, 1st apartment from west at north
Aug 17, 2026 · Apt 3A
Open — Civ14 mailed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3c, 4th story, 2nd apartment from north at east
Nov 14, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3c, 4th story, 2nd apartment from north at east
Nov 14, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked. at cellar
Nov 14, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 2nd story, 2nd apartment from north at east
Nov 14, 2025 · Apt 1C
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at building front at fire escape
Nov 9, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east
Apr 13, 2025 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Apr 13, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 17, 2025
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 2nd story, 1st apartment from east at south
Mar 17, 2025 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 9, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 2nd story, 1st apartment from north at east
Mar 9, 2025 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 1c, 2nd story, 1st apartment from north at east
Nov 1, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 2nd story, 1st apartment from north at east
Oct 21, 2024 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room locked at basement
Oct 21, 2024
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective escutcheon plate at shower head in the bathroom located at apt 1c, 2nd story, 1st apartment from north at east
Aug 12, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Aug 1, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Aug 1, 2024 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents evidence of rats at east yard
Aug 1, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective upper and lower refrigerator door rubber seal in the kitchen located at apt 1c, 2nd story, 1st apartment from north at east
Jul 6, 2024 · Apt 1C
Closed — Violation closed - BHazardous
Provide wire mesh screen below skylight at bulkhead
May 31, 2024
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1c, 2nd story, 1st apartment from north at east
Apr 19, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at upper and lower sashes at east wall in the kitchen located at apt 1c, 2nd story, 1st apartment from north at east
Apr 19, 2024 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Apr 19, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 2nd story, 1st apartment from north at east
Apr 19, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom system at west wall in the foyer located at apt 1c, 1st story, 1st apartment from north at east
Apr 6, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective building bell intercom system from building entrance to west wall in the foyer located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance of upper window sash of window on east wall in the 1st room from east at north located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and the ceiling in the private hallway located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and the ceiling in the 2nd room from east at south located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak west wall and ceiling in the 2nd room from east at south located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance of upper window sash of fire escape window in the kitchen located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and the ceiling in the kitchen located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles at north wall, west wall and south wall in the bathroom located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and the ceiling in the 1st room from east at north located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the east wall, and west wall in the 1st room from east at north located at apt 1c, 2nd story, 1st apartment from north at east
Apr 2, 2024 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling , 1st story
Apr 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective at the ceiling with fire retardant material , 1st story
Apr 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in building vestibule area , 1st story
Apr 2, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department east wall and the ceiling at public hall, 2nd story
Apr 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective at the ceiling and east wall with fire retardant materials at public hall, 2nd story
Apr 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling at public hall, 2nd story
Apr 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective rotted wood cabinet at washbasin in the bathroom located at apt 1a, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 1a, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 1a, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 1a, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 1A
Closed — Violation dismissed
DOB building violations · 9
- Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35332704r issued on 05-22-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01(d)(2). an acceptable certificate has not been filed despite the
Mar 18, 2019 · Penalty $1,250
Resolve - Class - 2
Occupancy contrary to that allowed by the bldg dept records.noted:uponinsp of cellar observed an apt currently occupied.the apt consists of a full bathroom:toilet,sink & bathtub,full kitchen:gas stove,cabinet,r
May 22, 2018 · Penalty $1,250
Resolve - Class - 1
Work w/a permit noted:laa #110592163 was signed off on 05/24/2013 for the removal & capping of water waste lines for a (3)pc bathroom (toilet,sink & tub) kitchen sink & cap gas line for stove in cellar.upon ins
May 22, 2018 · Penalty $1,600
Resolve - Non-hazardous
Failure to comply with commissioners order in that vi # 34476936m issued on 4/22/05 for occupancy contrary to allowed by certificate of occupancy no 12340 of 3/21/27. noted: illegal occupancy in the cellar (3)
Aug 19, 2005 · Penalty $1,500
Resolve - Hazardous
Occupancy contrary to that allowed by certificate of occupancy no 12340 of 03/21/27 noted no occupanyc in the cellar to illegal occupancy three(3)two bedrooms full bathrooms living room and kitchen apts all thr
Apr 22, 2005 · Penalty $800
Resolve
Complaints
- Water leak
Slow leak
Jul 19, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 12, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 11, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 11, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Jan 11, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 9, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 9, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Jan 9, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 9, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 9, 2026 · Apt 1C
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 8, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 8, 2026 · Apt 1T
Close - Heat/hot water
Apartment only
Jan 8, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 7, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 7, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 6, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 6, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 3, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 3, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 1, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 31, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 30, 2025 · Apt BUILDI
Close - Heat/hot water
Apartment only
Dec 30, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 30, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 28, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 28, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 28, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 27, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 27, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 1C
Close - Safety
Carbon monoxide detector
Dec 26, 2025 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 16
- Building area
- 9,728 ft²
- Lot area
- 3,500 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2170 / 556
- Assessed value
- $546,750
- Landmark / historic district
- No
HPD registration #105622, last renewed Aug 27, 2025.
Questions about 16 Broadway Terrace
Who owns 16 Broadway Terrace?
The owner of record in NYC Department of City Planning PLUTO data is 14-26 Broadway Terrace Associates LLC.
Does 16 Broadway Terrace have violations?
Yes. NYC HPD has recorded 226 housing violations at this property.
Is 16 Broadway Terrace rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 16 Broadway Terrace built?
City records list 1927 as the year it was built.
How many apartments are in 16 Broadway Terrace?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.