21 Broadway Terrace
Manhattan, NY 10040BBL 1-02170-0513Map
Owner of record: 21 Broadway Terrace Associates LLC
21 Broadway Terrace is a walk-up apartment building built in 1928 in Manhattan, 10040. It has 17 residential units across 4 floors. The owner of record is 21 Broadway Terrace Associates LLC. HPD has recorded 78 housing violations here, most recently on September 9, 2023. City tax records listed 13 rent-stabilized apartments here in 2024.
- HPD violations
- 78
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 174
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 78
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2c, 3rd story, 1st apartment from east at south
Sep 9, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2c, 3rd story, 1st apartment from east at south
Sep 9, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective regrout ceramic tiles at south,west and east walls in the bathroom located at apt 2c, 3rd story, 1st apartment from south at west
Jan 4, 2022 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors .... in the entrance located at apt 2c, 3rd story, 1st apartment from south at west
Jan 4, 2022 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell/buzzer intercom system in the foyer located at apt 2c, 3rd story, 1st apartment from west at north
Feb 27, 2020 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell, buzzer system at west wall in the foyer located at apt 2c, 3rd story, 1st apartment from south at west
Jan 8, 2020 · Apt 2C
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots buiding front at fire escape, 3rd story
Sep 20, 2019
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at front of the building at fire escape, 4th story
Sep 20, 2019
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 8, 2019
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste line at wash basin in the bathroom located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tiles floor in the kitchen located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt b, 1st story, 1st apartment from east at south
May 8, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt d, 1st story, 2nd apartment from south at west
Mar 12, 2019 · Apt D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt d, 1st story, 2nd apartment from south at west
Mar 12, 2019 · Apt D
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd and 4th sty balconies , east fire escape
May 28, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 20, 2015
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 20, 2015
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box , at public hall, 1st story
Aug 20, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete ceiling at fire passage way, 1st story
Aug 20, 2015
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt b, 1st story, 1st apartment from east at south
Jun 4, 2015 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt b, 1st story, 1st apartment from east at south
Jun 4, 2015 · Apt B
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... in the entire apartment located at apt b, 1st story, 1st apartment from east at south
Jun 4, 2015 · Apt B
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st story
Jun 4, 2015
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Jun 2, 2015 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 2, 2015
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective intercom system so that it will buzz at building entrance in the foyer located at apt 2c, 2nd story, 1st apartment from south at west
Jun 2, 2015 · Apt 2C
Closed — Violation closed - ANon-hazardous
Refit lower window sash in the 1st room from east at south located at apt 2c, 3rd story, 1st apartment from south at west
Aug 8, 2014 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair the broken or defective intercom system located at apt 1a, 1st story, 1st apartment from west at north
Apr 16, 2014 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Replace with new the missing lock set at entrance door from vestibule to 1st sty at public hall
Apr 16, 2014
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items all stys front east at fire escape
Apr 16, 2014
Closed — Violation closed - BHazardous
Properly repair the broken or defective intercom system at vestibule
Mar 12, 2014
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective intercom in the foyer located at apt a, 1st story, 1st apartment from west at north
Jul 19, 2013 · Apt A
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring all walls in the entire apartment located at apt a, 1st story, 1st apartment from west at north
Jul 19, 2013 · Apt A
Closed — Violation dismissed - ANon-hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring west wall in the bathroom located at apt a, 1st story, 1st apartment from west at north
Jul 19, 2013 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective intercom panel at lobby, 1st story
Jul 19, 2013
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2c, 3rd story, 1st apartment from south at west
Jan 9, 2013 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east
Jan 9, 2013 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 9, 2013
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 1st story, 1st apartment from south at west
Oct 24, 2012 · Apt 2C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1d, 2nd story, 2nd apartment from south at west
May 24, 2012 · Apt 1D
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1d, 2nd story, 2nd apartment from south at west
May 24, 2012 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1d, 2nd story, 2nd apartment from south at west
May 24, 2012 · Apt 1D
Closed — Violation closed
DOB building violations · 4
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 3
- Hazardous
Failure to maintain noted defect: concrete/steel terrace defective/ eroded rusted structural steel frame work and loose, spalling broken concrete at underside and sides of terrace. remedy: maintain building/
Aug 19, 2005 · Penalty $2,000
Resolve - Non-hazardous
Failure to maintain-hazardous noted defects:concrete/steel terrace defective/eroded rusted structural steel framework and loose,spalling,broken concrete at underside and sides of terrace.noted location:undersid
Apr 14, 2005 · Penalty $800
Resolve - Hazardous
Exit passageway or corridor:total obstructio.noted:fenced in & gated(gatelocked)place of refuge at bottom of fire escape is used by superintendant to keep viscious guard dog.area full of dog feces.location:rear
Mar 13, 2000 · Penalty $480
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 20, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt 2C
Close - Electric
Outlet/switch
Apr 17, 2024 · Apt 1B
Close - Heat/hot water
Entire building
Apr 1, 2024 · Apt 2C
Close - Heat/hot water
Entire building
Apr 1, 2024 · Apt BLDG
Close - Flooring/stairs
Stairs
Sep 7, 2023 · Apt 2C
Close - Paint/plaster
Ceiling
Sep 7, 2023 · Apt 2C
Close - Heat/hot water
Apartment only
May 18, 2023 · Apt A
Close - Heat/hot water
Entire building
Dec 30, 2022 · Apt 2C
Close
Show 40 more ↓
- Heat/hot water
Entire building
May 16, 2022 · Apt 2C
Close - Plumbing
Water supply
Feb 14, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 27, 2021 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 12, 2021 · Apt 1C
Close - Heat/hot water
Apartment only
Feb 3, 2021 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 2, 2021 · Apt 2B
Close - Heat/hot water
Entire building
Feb 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2021 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 31, 2021 · Apt 3D
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 29, 2021 · Apt 2C
Close - Heat/hot water
Entire building
Jan 8, 2021 · Apt 2C
Close - Heat/hot water
Entire building
Jan 5, 2021 · Apt 2C
Close - General
Bell/buzzer/intercom
Jan 14, 2020 · Apt 2C
Close - General
Bell/buzzer/intercom
Dec 26, 2019 · Apt 2C
Close - General
Bell/buzzer/intercom
Dec 16, 2019 · Apt 2C
Close - General
Bell/buzzer/intercom
Sep 12, 2019 · Apt 2C
Close - Water leak
Slow leak
Apr 19, 2019 · Apt B
Close - Water leak
Slow leak
Apr 19, 2019 · Apt B
Close - Plumbing
Toilet
Apr 19, 2019 · Apt B
Close - Electric
Power outage
Feb 21, 2019 · Apt 2C
Close - Electric
Lighting
Feb 20, 2019 · Apt 2C
Close - Electric
Power outage
Feb 20, 2019 · Apt 2C
Close - Electric
No lighting
Jan 25, 2017 · Apt B
Close - Electric
No lighting
Jan 25, 2017 · Apt B
Close - Electric
No lighting
Jan 25, 2017 · Apt B
Close - Flooring/stairs
Floor
Dec 5, 2016 · Apt B
Close - Paint/plaster
Ceiling
Dec 5, 2016 · Apt B
Close - Paint/plaster
Wall
Dec 5, 2016 · Apt B
Close - Flooring/stairs
Floor
Dec 5, 2016 · Apt B
Close - Heat/hot water
Entire building
Jan 24, 2016 · Apt 2D
Close - Unsanitary condition
Garbage/recycling storage
May 2, 2015 · Apt B
Close - Door/window
Door
May 2, 2015 · Apt B
Close - Flooring/stairs
Floor
May 2, 2015 · Apt B
Close - General
Bell/buzzer/intercom
Mar 23, 2015 · Apt 2C
Close - Door/window
Door
Mar 23, 2015 · Apt 2C
Close - General
Bell/buzzer/intercom
Mar 13, 2015 · Apt 2C
Close - Door/window
Window frame
Aug 1, 2014 · Apt 2C
Close - Appliance
Refrigerator
Aug 1, 2014 · Apt 2C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1928
- Floors
- 4
- Residential units
- 17
- Building area
- 9,728 ft²
- Lot area
- 3,500 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2170 / 513
- Assessed value
- $540,000
- Landmark / historic district
- No
HPD registration #102747, last renewed Aug 27, 2025.
Questions about 21 Broadway Terrace
Who owns 21 Broadway Terrace?
The owner of record in NYC Department of City Planning PLUTO data is 21 Broadway Terrace Associates LLC.
Does 21 Broadway Terrace have violations?
Yes. NYC HPD has recorded 78 housing violations at this property.
Is 21 Broadway Terrace rent stabilized?
NYC Department of Finance tax bills listed 13 rent-stabilized units here in 2024 (about 76% of its 17 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 21 Broadway Terrace built?
City records list 1928 as the year it was built.
How many apartments are in 21 Broadway Terrace?
It has 17 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.