11 Broadway Terrace
Manhattan, NY 10040BBL 1-02170-0510Map
Owner of record: Washington Heights Mutual Housing Assoc. HDFC
11 Broadway Terrace is a walk-up apartment building built in 1928 in Manhattan, 10040. It has 17 residential units across 4 floors. The owner of record is Washington Heights Mutual Housing Assoc. HDFC. HPD has recorded 68 housing violations here, most recently on October 10, 2026. 21 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 68
- DOB violations
- 3
- ECB violations
- 0
- HPD complaints
- 65
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 68
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a, 1st story, 1st apartment from north at east
Oct 10, 2026 · Apt A
Open — Violation open - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Oct 10, 2026
Open — Violation open - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from north located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 2nd room from north located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north south and east wall at public hall, 3rd story
Aug 29, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd story
Aug 29, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall (under sink) in the kitchen located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective sink base cabinet at north wall in the kitchen located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the foyer located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the foyer located at apt 3b, 4th story, 1st apartment from east at south
Aug 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 4th story
Aug 29, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at all walls at public hall, 4th story
Aug 29, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at ceiling at public hall, 4th story
Aug 29, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Aug 29, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 4th story
Aug 29, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west
Apr 13, 2025 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Apr 13, 2025
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with doors intact at public hall, 1st story
Mar 5, 2025
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective inoperable bell/buzzer/intercom system from building front entrance to apt. located at apt 1c, 1st story, 1st apartment from south at west
Jul 14, 2023 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balances at lower window sash in the kitchen located at apt 1c, 1st story, 1st apartment from south at west
Jul 14, 2023 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 1st story
Jun 22, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling. at public hall, 1st story
Jun 22, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 3d, 4th story, 2nd apartment from south at west
Feb 18, 2021 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3d, 4th story, 2nd apartment from south at west
Feb 18, 2021 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective locking assembly at front entrance door to building , 1st story
Jan 27, 2021
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell, return buzzer & intercom system from building front entrance door to in the kitchen located at apt 1c, 2nd story
Oct 15, 2020 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at north wall approx 20 square feet at public hall, 1st story
Feb 19, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at north wall at public hall, 1st story
Feb 19, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at public hall, 1st story
Feb 19, 2020
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at north wall at public hall, 1st story
Feb 19, 2020
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall approx 20 square feet at public hall, 1st story original violation 13577164 issued 19-feb-20 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Feb 19, 2020
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west
Feb 27, 2019 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinly floor tiles in the foyer located at apt 3d, 3rd story, 2nd apartment from south at west
Feb 27, 2019 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3d, 4th story, 2nd apartment from south at west
Aug 20, 2018 · Apt 3D
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west
Aug 20, 2018 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). deffective in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west
Aug 20, 2018 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector deffective in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west
Aug 20, 2018 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 11, 2018
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the limit of 130 degrees fahrenheit in the entire apartment located at apt c, 1st story, 1st apartment from south at west
Apr 25, 2018 · Apt C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective the wood floor in the 1st room from east at north located at apt c, 1st story, 1st apartment from south at west
Feb 23, 2018 · Apt C
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective window glass lower window sash in the bathroom located at apt c, 1st story, 1st apartment from south at west
Feb 23, 2018 · Apt C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 8 square feet at west wall in the kitchen located at apt c, 1st story, 1st apartment from south at west
Feb 23, 2018 · Apt C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, south wall. west wall, north wall and ceiling in the kitchen located at apt c, 1st story, 1st apartment from south at west
Feb 23, 2018 · Apt C
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the limit of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at apt c, 1st story, 1st apartment from south at west
Feb 23, 2018 · Apt C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 3d, 4th story, 2nd apartment from east at south
Feb 20, 2018 · Apt 3D
Closed — Violation closed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
Oct 10, 2026 · Apt 1D
Open - Heat/hot water
Apartment only
Oct 9, 2026 · Apt 1D
Open - Heat/hot water
Entire building
Oct 9, 2026 · Apt A
Open - Electric
Lighting
Aug 22, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
Aug 22, 2026 · Apt 3D
Close - Unsanitary condition
Mold
Aug 22, 2026 · Apt 3D
Close - Paint/plaster
Wall
Aug 22, 2026 · Apt 3D
Close - Plumbing
Water supply
Aug 22, 2026 · Apt 3D
Close - Water leak
Heavy flow
Aug 21, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Aug 21, 2026 · Apt 3B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 11, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Apr 10, 2025 · Apt BLDG
Close - Plumbing
Water supply
Mar 17, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Mar 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Apr 7, 2024 · Apt 1D
Close - Heat/hot water
Entire building
Mar 19, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2024 · Apt BLDG
Close - General
Bell/buzzer/intercom
Jul 14, 2023 · Apt 1C
Close - Water leak
Heavy flow
Jun 2, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Jan 23, 2023 · Apt 1C
Close - General
Bell/buzzer/intercom
Aug 4, 2022 · Apt 1C
Close - Heat/hot water
Entire building
Jan 23, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 2, 2021 · Apt 3D
Close - General
Bell/buzzer/intercom
Oct 13, 2020 · Apt 1C
Close - Heat/hot water
Entire building
Oct 13, 2020 · Apt 1C
Close - Heat/hot water
Entire building
Feb 16, 2020 · Apt BLDG
Close - Plumbing
Bathtub/shower
Dec 19, 2018 · Apt 3D
Close - Flooring/stairs
Floor
Dec 19, 2018 · Apt 3D
Close - Unsanitary condition
Pests
Dec 19, 2018 · Apt 3D
Close - Door/window
Door
Dec 19, 2018 · Apt 3D
Close - Heat/hot water
Entire building
Feb 21, 2018 · Apt C
Close - Flooring/stairs
Floor
Feb 12, 2018 · Apt 3D
Close - Unsanitary condition
Pests
Feb 12, 2018 · Apt 3D
Close - Flooring/stairs
Floor
Feb 12, 2018 · Apt 3D
Close - Plumbing
Radiator
Feb 12, 2018 · Apt 3D
Close - Plumbing
Radiator
Feb 12, 2018 · Apt 3D
Close - Paint/plaster
Wall
Feb 12, 2018 · Apt 3D
Close - Flooring/stairs
Floor
Feb 12, 2018 · Apt 3D
Close - General
Cabinet
Feb 12, 2018 · Apt 3D
Close - Door/window
Door
Feb 12, 2018 · Apt 3D
Close - Heat/hot water
Entire building
Jan 12, 2018 · Apt 1C
Close - Heat/hot water
Entire building
Jan 24, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2016 · Apt 1C
Close - Heat/hot water
Entire building
Jan 18, 2016 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1928
- Floors
- 4
- Residential units
- 17
- Building area
- 9,728 ft²
- Lot area
- 3,500 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2170 / 510
- Assessed value
- $334,800
- Landmark / historic district
- No
HPD registration #117049, last renewed Nov 13, 2025.
Questions about 11 Broadway Terrace
Who owns 11 Broadway Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Washington Heights Mutual Housing Assoc. HDFC.
Does 11 Broadway Terrace have violations?
Yes. NYC HPD has recorded 68 housing violations at this property.
Is 11 Broadway Terrace rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 94% of its 17 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 11 Broadway Terrace built?
City records list 1928 as the year it was built.
How many apartments are in 11 Broadway Terrace?
It has 17 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.