roofy

5 Broadway Terrace

Manhattan, NY 10040BBL 1-02170-0507Map

Owner of record: G &G Broadway Terrace Cp

5 Broadway Terrace is a walk-up apartment building built in 1928 in Manhattan, 10040. It has 17 residential units across 4 floors. The owner of record is G &G Broadway Terrace Cp. HPD has recorded 170 housing violations here, most recently on March 9, 2026. 20 of the 50 most recent violations are still open. City tax records listed 17 rent-stabilized apartments here in 2024.

HPD violations
170
DOB violations
12
ECB violations
0
HPD complaints
202

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
17
About 100% of the building's 17 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 170

  • B

    Properly repair with similar material the broken or defective wood subfloor in the 1st room from east located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood subfloor in the kitchen located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective vanity cabinet at west wall in the bathroom located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from east located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective closet door at north wall in the private hallway located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective entrance door in the bathroom located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective silicone caulking around bathtub at north, west and east walls in the bathroom located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt d, 1st story, 2nd apartment from south at west

    Mar 9, 2026 · Apt D

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 2nd story, 1st apartment from south at west

    Dec 17, 2025 · Apt 1C

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing door sweeper in the entrance located at apt d, 1st story, 2nd apartment from south at west

    Jan 16, 2024 · Apt D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt d, 1st story, 2nd apartment from south at west

    Jan 16, 2024 · Apt D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt d, 1st story, 2nd apartment from south at west

    Jan 16, 2024 · Apt D

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx. 8 sq.ft (4 sq.ft inside medicine cabinet at north wall), (4 sq. ft at ceiling) in the bathroom located at apt 1d, 2nd story, 2nd apartment from south at west

    Dec 6, 2023 · Apt 1D

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 3b, 3rd story, 1st apartment from west at north

    Jun 15, 2023 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchen located at apt 1b, 2nd story, 1st apartment from west at north

    Jun 15, 2023 · Apt 1B

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and south wall at public hall, 4th story

    Jun 8, 2023

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and south wall at public hall, 4th story

    Jun 8, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective mailbox lock at apt. 1d at public hall, 1st story

    Jan 18, 2023

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north at east located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the 2nd room from north at east located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • A

    Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the kitchen located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 1st room from north at west located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall, 1st closet from east at south wall door frame in the 1st room from north at west located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • B

    Repair or replace the smoke detector inoperable in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from north at east located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall, south wall, east wall in the 2nd room from north at east located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the kitchen located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall in the kitchen located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from north at west located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from south at west wall in the bathroom located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • A

    Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the bathroom located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 9, 2022 · Apt 3D

    Open — Violation will be reinspected
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 7, 2022 · Apt 3D

    Open — Violation will be reinspected
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north and west walls in the 3rd room from north located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 7, 2022 · Apt 3D

    Open — Violation will be reinspected
  • B

    Repair or replace the smoke detector inoperable in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 7, 2022 · Apt 3D

    Open — Violation will be reinspected
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3d, 4th story, 2nd apartment from south at west

    Dec 7, 2022 · Apt 3D

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north

    Oct 16, 2022 · Apt 2B

    Open — Violation will be reinspected

DOB building violations · 12

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
Show 2 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Plumbing

    Bathtub/shower

    Mar 5, 2026 · Apt D

    Close
  • Paint/plaster

    Wall

    Mar 5, 2026 · Apt D

    Close
  • Paint/plaster

    Wall

    Mar 5, 2026 · Apt D

    Close
  • Paint/plaster

    Wall

    Mar 5, 2026 · Apt D

    Close
  • Door/window

    Door

    Mar 5, 2026 · Apt D

    Close
  • General

    Cabinet

    Mar 5, 2026 · Apt D

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 1C

    Close
  • Electric

    Lighting

    Jul 3, 2025 · Apt 3A

    Close
  • Electric

    Outlet/switch

    Jul 3, 2025 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2025 · Apt 1C

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 4, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2024 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2023 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Aug 22, 2023 · Apt 3A

    Close
  • Plumbing

    Bathtub/shower

    Aug 22, 2023 · Apt 3A

    Close
  • Water leak

    Heavy flow

    Jun 26, 2023 · Apt 3A

    Close
  • Plumbing

    Bathtub/shower

    Jun 26, 2023 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 23, 2023 · Apt 1B

    Close
  • Plumbing

    Toilet

    Jan 15, 2023 · Apt 1D

    Close
  • Plumbing

    Basin/sink

    Jan 15, 2023 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2023 · Apt 1D

    Close
  • Paint/plaster

    Wall

    Dec 8, 2022 · Apt 3D

    Close
  • Plumbing

    Bathtub/shower

    Dec 8, 2022 · Apt 3D

    Close
  • Paint/plaster

    Wall

    Dec 8, 2022 · Apt 3D

    Close
  • Electric

    Power outage

    Dec 6, 2022 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Nov 15, 2022 · Apt 3D

    Close
  • Paint/plaster

    Wall

    Nov 15, 2022 · Apt 3D

    Close
  • Plumbing

    Bathtub/shower

    Nov 15, 2022 · Apt 3D

    Close
  • Flooring/stairs

    Floor

    Nov 15, 2022 · Apt 3D

    Close
  • Electric

    No lighting

    Oct 29, 2022 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Oct 29, 2022 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Oct 29, 2022 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Oct 20, 2022 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Oct 16, 2022 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Oct 16, 2022 · Apt 2B

    Close
  • Electric

    No lighting

    Oct 13, 2022 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Oct 13, 2022 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Oct 13, 2022 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Oct 10, 2022 · Apt 2B

    Close
  • Water leak

    Heavy flow

    Oct 10, 2022 · Apt 2B

    Close
  • Electric

    No lighting

    Oct 8, 2022 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Oct 6, 2022 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Oct 6, 2022 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Oct 6, 2022 · Apt 2B

    Close
  • Water leak

    Slow leak

    Oct 6, 2022 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Mar 28, 2022 · Apt 2B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1928
Floors
4
Residential units
17
Building area
9,728 ft²
Lot area
3,500 ft²
Zoning
R7-2
Community board
112
Council district
10
Block / lot
2170 / 507
Assessed value
$427,500
Landmark / historic district
No

HPD registration #126971, last renewed Jul 23, 2025.

Questions about 5 Broadway Terrace

Who owns 5 Broadway Terrace?

The owner of record in NYC Department of City Planning PLUTO data is G &G Broadway Terrace Cp.

Does 5 Broadway Terrace have violations?

Yes. NYC HPD has recorded 170 housing violations at this property.

Is 5 Broadway Terrace rent stabilized?

NYC Department of Finance tax bills listed 17 rent-stabilized units here in 2024 (about 100% of its 17 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 5 Broadway Terrace built?

City records list 1928 as the year it was built.

How many apartments are in 5 Broadway Terrace?

It has 17 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.