roofy

106 Ft Washington Avenue

Manhattan, NY 10032BBL 1-02137-0126Map

Owner of record: 106 Fort Washington Owner, LLC

106 Ft Washington Avenue is an elevator apartment building built in 1920 in Manhattan, 10032. It has 69 residential units across 6 floors. The owner of record is 106 Fort Washington Owner, LLC. HPD has recorded 631 housing violations here, most recently on October 1, 2026. 10 of the 50 most recent violations are still open. City tax records listed 53 rent-stabilized apartments here in 2024.

HPD violations
631
DOB violations
27
ECB violations
23
HPD complaints
602

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
53
About 77% of the building's 69 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 631

  • C

    Properly repair or replace the broken or defective upper glass pane at vestibule door to public hall , 1st story

    Oct 1, 2026

    Open — Nov certified on time
  • B

    Replace the broken or defective missing base cabinet in the kitchen located at apt 3a, 3rd story, 3rd apartment from east at south

    Sep 20, 2026 · Apt 3A

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south , section at west

    Jul 11, 2026 · Apt 3A

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south , section at west

    Jul 11, 2026 · Apt 3A

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective wooden window stool in the 4th room from north located at apt 1a, 1st story, 2nd apartment from east at south

    Jul 11, 2026 · Apt 1A

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3a, 3rd story, 1st apartment from east at south

    Jun 13, 2026 · Apt 3A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 3a, 3rd story, 1st apartment from east at south

    Jun 13, 2026 · Apt 3A

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 3a, 3rd story, 5th apartment from east at south

    Jun 13, 2026 · Apt 3A

    Closed — Violation closed
Show 40 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 1st room from north at west located at apt 3a, 3rd story, 5th apartment from east at south

    Jun 13, 2026 · Apt 3A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, north wall in the kitchen located at apt 3a, 3rd story, 5th apartment from east at south

    Jun 13, 2026 · Apt 3A

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the private hallway located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 1st room from north at west located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the private hallway located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the private hallway located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the 3rd room from north at west located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the 1st room from north at west located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 1st room from north at west located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door frame in the 3rd room from north at west located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at north and west wall in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at north wall, east wall in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    May 11, 2026 · Apt 3A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at all walls and ceiling in the private hallway located at apt 3a, 3rd story, 1st apartment from east at south

    May 5, 2026 · Apt 3A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of construction materials at public hall, 1st story

    Apr 15, 2026

    Closed — Violation dismissed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at outlet at south wll in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected from floor to ceiling with door and door frame attached creating additional room in the 1st room from north at east located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Open — Not complied with
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at 1st window frame from north at east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st private hallway from north located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st private hallway from north located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at window frame from north at east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west original violation 18728601 issued 22-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Mar 22, 2026 · Apt 3A

    Open — Civ14 mailed
  • A

    Properly repair with similar material the broken or defective porcelain enamel finish in bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at east wall, south wall, west wall in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective plaster at ceiling and at north wall in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective wall cabinet at south wall in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, north wall in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south , 1st section from south at west

    Mar 22, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective garbage chute door at public hall, 4th story

    Mar 18, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective garbage chute door at public hall, 3rd story

    Mar 18, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective garbage chute door at public hall, 1st story

    Mar 18, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance door

    Mar 3, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch at building entrance door

    Mar 3, 2026

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 2nd apartment from east at south

    Feb 22, 2026 · Apt 1A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1a, 1st story, 2nd apartment from east at south

    Feb 22, 2026 · Apt 1A

    Closed — Violation dismissed

DOB building violations · 27

  • Construction other optional

    Owner to hire a nys licensed professional engineer to prepare an engineering report addressing the aforementioned condition. engineering report shall include plans, photographs, recommendations and approximate timeframe of when the repairs should be completed by the owner and be submitted to the dob (obmswo@buildings .nyc .gov)

    Feb 6, 2026

    Dob violation - active
  • Construction other optional

    Ftm property in safe & code compliant manner. undocumented interior alteration/demo work performed contrary to appoved drawings 30ft in length of floor joist. remedy: comply with code. retain nys pe & reg gc to evaluate. submit signed & sealed construction documents to [email protected] or [email protected]

    Feb 6, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain bldg in a safe condition.bldg dmgd by fire on 11/8/25.moderate to severe dmg noted@ d&line lines:roof,cockloft dmgd& roof open.6th&6thfl framng cmprmsd;severe water&fire dmg to ceilng ownr to rtain nyspe to eval&eval rpair the bldg undr prmt.start wrk by 12/26/25&cmplte/sign off by 2/6/2026

    Nov 10, 2025

    Dob violation - active
  • Construction other optional

    Masonry walls&steel frame&wood joist floors bldg damaged by fire on 11/8/25.roof framing severely damaged&roof open at d&e lines floor framng @d&e lines 5th&6th flrs was dmgd&locally compromised.undr drct& continous sprvsn of pe immed:1.instll temp roof,3.instll temp shorng as req'd.pe to sbmt means&methds to feu

    Nov 10, 2025

    Dob violation - active
  • Construction other optional

    Fire damage to roof, roof open and damge to apt floor 1-6 d,e,f lines and apt 5c and 3c owner must hire a nyspe to submit a report with plans ,photosand repai rs with time line to dob at [email protected] within 7 days 718-286-3460

    Nov 9, 2025

    Dob violation - active
  • Construction other optional

    Structure rendered non compliant due to fire apt1 thru 6 d,g and f and apt 5 l sustained fire water and smoke damage throughtout with roof p artially open with charred joist structure must be maintained in a code compliant manner

    Nov 9, 2025

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Jun 28, 2020

    Dob violation - dismissed
Show 17 more ↓
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2017

    Jun 27, 2020

    Dob violation - dismissed
  • Construction other optional

    The borough commissioner issued a swo to job #122691881 due to applicant of record filing privileges suspended with the department. stop all work associated with permit #122691881 immediately. make site safe.

    Jan 28, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 9, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 24, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2012

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 19, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 1, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 22, 2010

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 26, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    1p13406

    Nov 7, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    Provide approved vision guards. file bn with this department for new cab conduct necessary tests. properly tag governor after conductng 2 yr. test

    Oct 12, 1988

    Dob violation - resolved

ECB violations · 23

  • Class - 2

    Observation in court yard on west 164 street store /piled up of excessive debris to 1st windows that consists of combustible wood / wood joints,bags and plywood leaning on walls & blocking water drainage which

    May 1, 2026

    Resolve
  • Class - 1

    Atoi observed on active jobsite under permit#m01327067-i1-st with workers working unsafe & missing guarails with no other safety measures in place., provide guard rails

    Feb 6, 2026 · Penalty $5,000

    Resolve
  • Class - 2

    Atoi on actictive jobsite under permit# m01327067-i1-st general contractor fail to post and distribute notice to occupants of tpp on enter building., post/distr. notice

    Feb 6, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Atoi observed on active job site under permit#m01327067-i1-st gc fail to provide fire extinguishers per fire code., comply with fire code

    Feb 6, 2026 · Penalty $625

    Resolve
  • Class - 1

    Failure to safeguard all person & property affected by construction operations, due to atoi under job # m01327067-i1-st (for shoring only) workers on site commence in various work active with no shoring install

    Feb 6, 2026 · Penalty $10,000

    Resolve
  • Class - 1

    Ftm adequate housekeeping per section requirements, due to atoi observed active jobsite under permit # m01327067-i1-st with excessive debris including combustible wood joists, plywood, sheetrock & various garba

    Feb 6, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection observed in apt.#6 workers installed new floor & roof joists and digging pockets for replace joist removed from floor. no permit or approval on file for this scope of work as 2/6/2026 at 9

    Feb 6, 2026 · Penalty $1,280

    Active
  • Class - 2

    At time of inspection observed new temporary electrical with romex tap into exciting electrical wiring to provide outlet installed in hallway with no permit on file for this scope of work as of 2/6/2026 at 9:45

    Feb 6, 2026 · Penalty $1,280

    Resolve
  • Class - 2

    Observed atoi mulitple construction operation inprogress which include carpenters , plumers,roofers & labourers working for different/contractors and no general condition permit on file as of last inspection co

    Feb 6, 2026 · Penalty $1,280

    Active
  • Class - 3

    Failure to maintain building in code compliant manner. living room ceiling of apt #6e has area of cracked and bulging plaster approx 8 sq ft., repair and or replace

    Sep 6, 2022 · Penalty $250

    Resolve
Show 13 more ↓
  • Class - 1

    Failure to notify the dept of an accident or incident that resulted ina fatality or injury. note:2 pedestrians was injured when an enclosurefell of a sidewalk shed due to high winds. pedestrians were transporte

    Dec 17, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35433163x issued on 10-17-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to safeguard all persons & property affected by constru

    Nov 21, 2019

    Resolve
  • Class - 2

    Pedestrian protection do not meet code specifications.the sidewalk shed does not meet code specifications.note:the deck enclosed(parapet wall)sections approximately 20'-0' of plywood is missing sections of the

    Oct 17, 2019

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected bly construction operations.note: the sidewalk shed at the above premisis does not meet code specification.section of the deck enclosure (parapet wall)blew

    Oct 17, 2019

    Resolve
  • Class - 2

    Failure to provide unobstructed exit passageway. note: at front of above premises fire escapes widows at 2nd fl to 6th fl ha e window air condioners in them obstructing safe passage in case of fire.

    Sep 9, 2011 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/ the comm order to file a cert of correction w/ the dob for nov#34915337m issued on 07/22/11 pursuant to 28-204.4 & 1rcny 102.01 rem: file a cert of correction

    Sep 9, 2011

    Resolve
  • Class - 2

    Fail to maintain bldg wall(s) or appurtenances defects noted @ time of inspection step cracks/cracks through brick & mortar joints @ exp #2, northside of bldg cracks are located below fire escape & above window

    Jul 22, 2011 · Penalty $500

    Resolve
  • Class - 1

    Fail to provide unobstructed exit passageway defects noted @ time of inspection window air conditioners are obstructing safe passage on fire escapes in case of emergency. rem: remove obstruction immediately.

    Jul 22, 2011

    Resolve
  • Non-hazardous

    15m 28l 73u 31l 18# 40# 37# 73m 14m 73m operation of an elevator without an equipment use permit ea 311/93 remedy obtain equipment use permit file application and obtain permit for items 18,40 an d37

    Dec 27, 1993 · Penalty $500

    Resolve
  • Non-hazardous

    15m,22d,31l,28l,36t,37g,50y,50y,51l,57o,73u, 15m-floor#'s 31l-exposed wiring 51l-excessive grinding on machine and motor

    Apr 8, 1993

    Resolve
  • Non-hazardous

    21x,33im73o, 33.wall and stair.

    Jul 2, 1992 · Penalty $500

    Resolve
  • Non-hazardous

    11b,14m,12x,17m,17r,32#,33w,33q,35d,36t,37g,38x,50y,50y,52l,57#,74j,58j, 17r,- for wire-glass 32#-back wall by bsmt. 33q- skylight 37g- 30 amp. fuses 57- remove oil and clean 74j- hoist motor

    Jun 17, 1992 · Penalty $250

    Resolve
  • Non-hazardous

    52d; 31q; 73o; 35t; 50y; 37q; 21x; 33i; 33i; 63h; 74j; 40t; 3m. (31) post name of elev co; 37 chairs; 33 wall; 33 stairs; 74 hoist motor - 40 five year 3 capacity.

    Feb 22, 1991 · Penalty $75

    Resolve

Complaints

  • Door/window

    Window frame

    Sep 12, 2026 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Sep 12, 2026 · Apt 3A

    Close
  • Door/window

    Door frame

    Sep 12, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Aug 24, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 10, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 10, 2026 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Jun 10, 2026 · Apt 3A

    Close
  • Door/window

    Door frame

    Jun 10, 2026 · Apt 3A

    Close
  • Water leak

    Slow leak

    Jun 10, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Jun 10, 2026 · Apt 3A

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    Jun 10, 2026 · Apt 3A

    Close
  • Water leak

    Heavy flow

    May 21, 2026 · Apt 3A

    Close
  • Paint/plaster

    Wall

    May 4, 2026 · Apt 3A

    Close
  • Paint/plaster

    Wall

    May 4, 2026 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    May 4, 2026 · Apt 3A

    Close
  • Paint/plaster

    Window/frame

    May 4, 2026 · Apt 3A

    Close
  • Paint/plaster

    Cabinet

    May 4, 2026 · Apt 3A

    Close
  • Water leak

    Damp spot

    Apr 8, 2026 · Apt 5K

    Close
  • Unsanitary condition

    Pests

    Apr 8, 2026 · Apt 5K

    Close
  • Plumbing

    Toilet

    Mar 23, 2026 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Mar 23, 2026 · Apt 4A

    Close
  • Electric

    Power outage

    Mar 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 23, 2026 · Apt BLDG

    Close
  • General

    Cabinet

    Mar 23, 2026 · Apt 4A

    Close
  • Electric

    No lighting

    Mar 23, 2026 · Apt 4A

    Close
  • Flooring/stairs

    Floor

    Mar 23, 2026 · Apt 4A

    Close
  • Door/window

    Window frame

    Mar 23, 2026 · Apt 4A

    Close
  • Plumbing

    Bathtub/shower

    Mar 23, 2026 · Apt 4A

    Close
  • Plumbing

    Toilet

    Mar 23, 2026 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Mar 23, 2026 · Apt 4A

    Close
  • Water leak

    Slow leak

    Mar 23, 2026 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Mar 23, 2026 · Apt 4A

    Close
  • General

    Cabinet

    Mar 23, 2026 · Apt 4A

    Close
  • Door/window

    Window frame

    Mar 23, 2026 · Apt 4A

    Close
  • Plumbing

    Radiator

    Mar 23, 2026 · Apt 4A

    Close
  • Flooring/stairs

    Floor

    Mar 23, 2026 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Mar 10, 2026 · Apt 3A

    Close
  • General

    Cabinet

    Mar 10, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Feb 17, 2026 · Apt 1A

    Open
  • Safety

    Window guard broken/missing

    Feb 17, 2026 · Apt 1A

    Open
  • Door/window

    Window pane

    Feb 17, 2026 · Apt 1A

    Open
  • Unsanitary condition

    Pests

    Feb 17, 2026 · Apt 1A

    Open
  • Heat/hot water

    Apartment only

    Feb 17, 2026 · Apt 1A

    Open
  • Unsanitary condition

    Mold

    Feb 17, 2026 · Apt 1A

    Open
  • Paint/plaster

    Ceiling

    Feb 17, 2026 · Apt 1A

    Open
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2026 · Apt 1J

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
1920
Floors
6
Residential units
69
Building area
71,166 ft²
Lot area
16,771 ft²
Zoning
R8
Community board
112
Council district
7
Block / lot
2137 / 126
Assessed value
$3,144,150
Landmark / historic district
No

HPD registration #120819, last renewed Jul 15, 2025.

Questions about 106 Ft Washington Avenue

Who owns 106 Ft Washington Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 106 Fort Washington Owner, LLC.

Does 106 Ft Washington Avenue have violations?

Yes. NYC HPD has recorded 631 housing violations at this property.

Is 106 Ft Washington Avenue rent stabilized?

NYC Department of Finance tax bills listed 53 rent-stabilized units here in 2024 (about 77% of its 69 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 106 Ft Washington Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 106 Ft Washington Avenue?

It has 69 residential units and 70 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.