949 West End Avenue
Manhattan, NY 10025BBL 1-01892-0016Map
Owner of record: 949 Associates LP
949 West End Avenue is an elevator apartment building built in 1915 in Manhattan, 10025. It has 60 residential units across 12 floors. The owner of record is 949 Associates LP. HPD has recorded 37 housing violations here, most recently on April 29, 2026. 4 of the 37 most recent violations are still open. City tax records listed 25 rent-stabilized apartments here in 2024.
- HPD violations
- 37
- DOB violations
- 51
- ECB violations
- 17
- HPD complaints
- 45
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at secondary exit door in the private hallway located at apt 7a, 7th story, 1st apartment from north at east
Mar 10, 2026 · Apt 7A
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of dry wall partition erected from floor to ceiling creating additional room and hence reducing natural light and ventilation in the 1st room from north located at apt 8b, 8th story, 2nd apartment from north at east
Mar 10, 2026 · Apt 8B
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 22, 2026
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 12d, 12th story, 1st apartment from north at east
Nov 23, 2025 · Apt 12D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 12c, 12th story, 1st apartment from south at west
Nov 23, 2025 · Apt 12C
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 10f, 10th story, 1st apartment from south at west
Nov 23, 2025 · Apt 10F
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 8b, 8th story, 2nd apartment from north at east
Nov 23, 2025 · Apt 8B
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7e, 7th story, 2nd apartment from north at east
Nov 23, 2025 · Apt 7E
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1a, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1A
Closed — Violation closed
Show 27 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 1st room from north at west located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the 2nd bathroom from north located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain glaze surface at bathtub in the 2nd bathroom from north located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door in the kitchen located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from north located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the foyer located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st window frame from south at west wall in the 3rd room from north located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the 4th room from north at west located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 2nd room from north located at apt 5c, 5th story, 1st apartment from south at west
Nov 12, 2025 · Apt 5C
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2a, 2nd story, 1st apartment from west at north
Nov 5, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 9a, 9th story, 1st apartment from west at north
Nov 5, 2025 · Apt 9A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6c, 6th story, 2nd apartment from south at west
Nov 5, 2025 · Apt 6C
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4c, 4th story, 1st apartment from south at west
Nov 5, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7c, 7th story, 2nd apartment from south at west
Nov 5, 2025 · Apt 7C
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1d, 1st story, 2nd apartment from south at west
Nov 5, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5c, 5th story, 1st apartment from south at west
Nov 5, 2025 · Apt 5C
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7a, 7th story, 1st apartment from north at east
Nov 5, 2025 · Apt 7A
Closed — Violation closed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Sep 4, 2025
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 9e, 9th story, 2nd apartment from north at east
Aug 13, 2025 · Apt 9E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from north located at apt 9e, 9th story, 2nd apartment from north at east
Aug 13, 2025 · Apt 9E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall, 1st window frame from north at east wall in the 2nd room from north located at apt 9e, 9th story, 2nd apartment from north at east
Aug 13, 2025 · Apt 9E
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at the ceiling in the kitchen located at apt 11a, 11th story, 1st apartment from north at east
Feb 4, 2015 · Apt 11A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at the range in the kitchen located at apt 11a, 11th story, 1st apartment from north at east
Feb 4, 2015 · Apt 11A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceilings and all walls in the entire apartment located at apt 11a, 11th story, 1st apartment from north at east
Feb 4, 2015 · Apt 11A
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective upper and lower window sashes in the kitchen located at apt 11a, 11th story, 1st apartment from north at east
Feb 4, 2015 · Apt 11A
Closed — Violation closed
DOB building violations · 51
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 7, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 7, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 31, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 31, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 1, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 3, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 3, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 15, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 15, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 3, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 3, 2003
Dob violation - resolved - Elevator elevatorrequired
1p10585
May 3, 2001
Dob violation - resolved - Elevator elevatorrequired
1p10586
May 3, 2001
Dob violation - resolved - Elevator elevatorrequired
1p10585
May 17, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 25, 1995
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatorrequired
20-pi indicator lights 24- door shoe improvisation to be removed or replaced tie wires 25- properly wire it and provide cover elec- trical box 30- remove loose plaster and replater 31- top of cord light 34- light inoperative and using proctetive skylight grill
May 4, 1990
Dob violation - resolved - Elevator elevatorrequired
15- bsmt. door 15d- properly secure or slack stationary section of hoistway doors. 18- remove and replace illegal switch on bsmt. door for approved type interlock .32- covers.45- provide triping d. 74- remove s. from interlocks
May 4, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 1989
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 1989
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 1989
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 1989
Dob violation - resolved - Elevator elevatorrequired
(51) properly tag governor after conducting 5 yr test (52) repair hoist motor commutator (53) repair or renew signal system+annunciator in car (54) provide proper light in motor room
Feb 10, 1989
Dob violation - resolved
ECB violations · 17
- Class - 1
Found door restrictor (door zone lock) missing. cease used. install door restrictor and adjust. re-inspection is required. cat5 tag in the elevator wheel room expired. perform cat5 test and provide tag5.
Dec 13, 2021 · Penalty $1,250
Resolve - Class - 1
97b10 entire device insufficient repair elevator shut down intermittently as elevtor was being inspected.restore elevtor to proper service.
Jul 6, 2016 · Penalty $250
Resolve - Class - 2
56y13,97o02,53b12. 56y13-seal oil leak on hoist machine; 97o02-clean down entire device; 54b12-reshackle car counterweight top of car tag for shackle missing reshackle to code and eliminate silver dollars and
Aug 19, 2015 · Penalty $500
Resolve - Class - 2
10d06,40o02,56y13,45b10. 10d-playin landing sill secure; 45b-covernor noise.
Apr 24, 2015
Resolve - Class - 2
16b01,16t07,20i11,23a10. 16b01-hoistway door slamming 7th flr adjust; 16t07-hoistway door not labeled; 70i11-vision panel glass broken replc23a10-hall buttons mixed up 8th and 9th floor repair.
Mar 11, 2015 · Penalty $250
Resolve - Class - 2
10d06,52bb12,37#07,37e10,40#07. 37e-noise coming from overhead;40# comply w/section 8.1 (machine room); 3#-comply with section 8.1 (over head door)
Dec 16, 2014 · Penalty $250
Resolve - Non-hazardous
51h10,55y10,41t07,40t07,43o02,36o02,85m05,86m05,36t07,21h11,21o02.51h10-hoist ropes.55y10-hoist machine,oil leak,clean all & repair as necessary.41t07-control,provide device #,visible.40t07-provide proper sign
Jul 3, 2007 · Penalty $350
Resolve - Non-hazardous
46u16-49u16-03d07-75b05. 46-49 reshackie tag with req tags 03-replace missing rear wall guard in cab 75-perform neq 5 year tests.
Sep 13, 2001 · Penalty $180
Resolve - Non-hazardous
75b05-52i10-50f11-14m12-09i10. 75-rerform req 5 year tests 52-replace & adj sw on brake 50-eliminate excessive lost motion in mach gearing 14-replace cert frame with cert. or location sigh 09-renew car door gib
Sep 13, 2001 · Penalty $180
Resolve - Non-hazardous
Failure to carry out permitted work in accordance with applicable laws and regualtions in that construction activities are being performed other than wekdays between the hours of 700/am and 600/pm without a var
May 24, 1997 · Penalty $350
Resolve
Show 7 more ↓
- Non-hazardous
15m, 17r, 21l, 30i, 32m, 33q, 46l, 63l, 73#,74o,74x. 15m-floor #'s 17-r lock door up far wire-glass 32-m cover 33-q skylight 73-# failureto obtain equipment use permit ebn-278/92. remedy:obtain eqipment use
Dec 9, 1994 · Penalty $1,000
Resolve - Non-hazardous
15i, 15#, 18#, 21i, 46l, 50l, 52h, 63h. 15,18 file application and obtain permit for bsmt. door and all interlocks 50l
Dec 9, 1994 · Penalty $6,000
Resolve - Non-hazardous
32m,33h,50f,73u,73m. 32 covers. 33h bearings and or shafts. 73 failure to obtain equipment use permit ebn 278/92 remedy:obtain equipment use permit.
Jan 26, 1994
Resolve - Hazardous
15i,18#,15#,21i,40x,61l,73u. 15 & 18 file application and obtain permit for bsmt. door and all interlocks. 21 annuciator. 61 frozen cease use until items 40x and 61 are complied before returning to serv
Jan 26, 1994 · Penalty $850
Resolve - Non-hazardous
33p7, 35p7
Jul 27, 1992
Resolve - Non-hazardous
33p,35p
Jul 27, 1992
Resolve - Non-hazardous
46r,49r;48r;
Mar 19, 1992
Resolve
Complaints
- Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 3C
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 3C
Close - Heat/hot water
Apartment only
Oct 17, 2025 · Apt PHD
Close - Paint/plaster
Door/frame
Aug 11, 2025 · Apt 9E
Close - Paint/plaster
Wall
Aug 8, 2025 · Apt 9E
Close - Paint/plaster
Door/frame
Aug 8, 2025 · Apt 9E
Close - Paint/plaster
Wall
Aug 8, 2025 · Apt 9E
Close
Show 35 more ↓
- Paint/plaster
Window/frame
Aug 8, 2025 · Apt 9E
Close - Paint/plaster
Cabinet
Aug 8, 2025 · Apt 9E
Close - Heat/hot water
Entire building
Jan 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt 6C
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt 6C
Close - Heat/hot water
Entire building
Dec 21, 2024 · Apt 6C
Close - Heat/hot water
Entire building
Dec 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 15, 2024 · Apt 6C
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt 6C
Close - Heat/hot water
Entire building
Apr 22, 2024 · Apt BLDG
Close - Water leak
Heavy flow
Dec 30, 2023 · Apt 12D
Close - Paint/plaster
Ceiling
Dec 18, 2023 · Apt 12D
Close - Plumbing
Water supply
Dec 15, 2023 · Apt BLDG
Close - Plumbing
Water supply
Dec 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2023 · Apt BLDG
Close - Paint/plaster
Ceiling
Nov 13, 2023 · Apt 12D
Close - Paint/plaster
Ceiling
Nov 29, 2021 · Apt 4C
Close - Water leak
Damp spot
Nov 29, 2021 · Apt 4C
Close - Flooring/stairs
Floor
Sep 24, 2020 · Apt 4C
Close - Paint/plaster
Wall
Sep 24, 2020 · Apt 4C
Close - Heat/hot water
Entire building
May 17, 2016 · Apt 1D
Close - Heating
Heat related
Jan 22, 2014 · Apt PHA
Close - Heating
Heat related
Jan 22, 2014 · Apt PHB
Close - Heating
Heat related
Jan 21, 2014 · Apt PHA
Close - Heating
Heat related
Nov 12, 2013 · Apt PHA
Close - Heating
Heat related
Jan 10, 2013 · Apt PHB
Close - Heating
Heat related
Apr 24, 2012 · Apt 8B
Close - General
Ceramic-tile
Dec 20, 2005 · Apt 12D
Close - Paint/plaster
Wall
Dec 20, 2005 · Apt 12D
Close - Paint/plaster
Ceiling
Dec 20, 2005 · Apt 12D
Close - Paint/plaster
Wall
Dec 20, 2005 · Apt 12D
Close - Paint/plaster
Ceiling
Nov 17, 2005 · Apt 12A
Close - Plumbing
Water-leaks
Nov 17, 2005 · Apt 12A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1915
- Floors
- 12
- Residential units
- 60
- Building area
- 83,805 ft²
- Lot area
- 7,500 ft²
- Zoning
- R10A
- Community board
- 107
- Council district
- 7
- Block / lot
- 1892 / 16
- Assessed value
- $5,293,350
- Landmark / historic district
- Riverside-West End Historic District Extension II
HPD registration #109677, last renewed Jul 20, 2026.
Questions about 949 West End Avenue
Who owns 949 West End Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 949 Associates LP.
Does 949 West End Avenue have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 949 West End Avenue rent stabilized?
NYC Department of Finance tax bills listed 25 rent-stabilized units here in 2024 (about 42% of its 60 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 949 West End Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 949 West End Avenue?
It has 60 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.